North Eastern Railways-NER has published Supply Of Set Of Following Item For Pull Box Assembly.Set Of Following Item For Pull Box Assembly.,Set Of Following Item For Pull Box Assembly Shifting Waset Of Following Item For Pull Box Assembly Shifting Work Of First Ac Lhb Coaches (1) Male Connector . Submission Date for this Tender is 01-05-2024. Railway Ancillaries Tenders in Gorakhpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Set Of Following Item For Pull Box Assembly. |
2 | Set of following item for Pull Box Assembly shifting wASet of following item for Pull Box Assembly shifting work of First AC LHB COACHES (1) MALE CONNECTOR 1/2" ODXM14X1.5 DRG ICF/STD 3-5-122 - 08 Nos , (2) UNION ELBOW 1/2" OD DRG ICF/STD 3-5-017 - 02 Nos , (3) STRAIGHT UNION 1/2" OD DRG I CF/STD 3-5-015 - 02 Nos , (4) UNION TEE 1/2" OD DRG ICF/STD 3-5-018 - 08 Nos . [ Warranty Period: 30 M onths after the date of delivery ] SSE/BREAK SHOP/MW/GKP, Uttar Pradesh 22.00 Set |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail