| 1 | Supply & fixing of 6mm thick ac sheet for roofing everest.charminar,in postion including fixingof j hook with bituman washer and also including materials ,labour ,t&p etc required for proper comp of work, |
| 2 | s/f of ac ridge with jor u hook and bituman washer complete including supply of all material labour t&p etc required for proper comp of work |
| 3 | Cement Concrete with2cm gauge approved stone ballast, coarse sand & cement in the proportion of4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(3x87.65x11.65x5%)=153.16 |
| 4 | 12 mm thick plaster with cement and coarse sand of2.20 fineness modules in 1:4over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work.si new item 13.11 |
| 5 | Supplying and fixing rollingSHUTTERS of approved make made 80x125mm (3\"x5\") cold rolled M.S. lath inter locked throughout their entire length and joined together at the end by end locks and mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete but excluding the cost of top cover and springs |
| 6 | Oiling &greasing of rolling shutter required for proper comp of works |
| 7 | M-150 Brick Work in one cement&four c sand mortar in super sctructure including supply of all materials labour, Tools & plants etc. required for proper completion of the work.assi no 305a+309+310+310A |
| 8 | Providing and fixing 27.5cm long wire spring grade 2 for rolling shutters. |
| 9 | Dismentling of Brick work or Stonework in lime or cement mortor and including stacking of materials as directed y Engineering incharge within a dixtamnce of 60 m 200 feet Si No 692 |
| 10 | Excavation in foundation in ordinary soil includinglead upto 30 meter and lift upto 1.5 meter and including of excavated earth in to the trenches or in to the sapce of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer -in - charge upto a distance of 30 M. from the foundation trenches. S.I. No 251 (a) |
| 11 | Concrete with 4 cm. Gauge stoneballast, Fine sand of 1.25 F.M and Cement, in proportion of 12:6:1 in foundation and under floor and includingsupply of II material labour and T&P etc required for proper completion of the work. S.I. no 273 |
| 12 | R.C.C work with cement, approved coarse sand & 4 Cm. Guage approved stone grit in proportions of 1:2:4 in raft foundation & Footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and suttering etc, and supply of all materials, labour, tools & Plants etc required for proper completion of the work including cost of binding wire, the rate excluding making of drip course which shall be paid extra. Si No 287 |
| 13 | R.C.C work with cement, approved coarse sand & 2 Cm. Guage approved stone grit in proportions of 1:1.5:3 in Coloumn excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and suttering etc, and supply of all materials, labour, tools & Plants etc required for proper completion of the work including cost of binding wire. the rate excluding making of drip course which shall be paid extra. Si No 289 |
| 14 | R.C.C work with cement, approved coarse sand & 2 Cm. Guage approved stone grit in proportions of 1:2:4 in Lighter Beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and suttering etc, and supply of all materials, labour, tools & Plants etc required for proper completion of the work including cost of binding wire. the rate excluding making of drip course which shall be paid extra. Si No 285 |
| 15 | M.S (For Steel of Plainin plain work such as R.C.C. or R.B. Work including bending for proper shape and including supply of Steels & its wastage, bend, hooks and authorised overlapping shall be measured and including cost of binding wire. |
| 16 | Finishing wall with two coat of weather coat and one coat cement primer of approved quality on new surface with this paint to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. |
| 17 | Deduct old brick received from dismantling of Boundarywall |
| 18 | Brick Bats |
| 19 | Screeding over leaky roof with bituman paint at 0.49 kg/sqmincluding sweeping cleaning the roof with brushes heating of the paints upto required temp pouring it on the surface spreading the necessery quantity of approved coarse sand at 1 cft per 100 sft and including supply of all materials labour t&p required for propercomp of work Si No 543 |
| 20 | 12 mm thick plaster with cement and coarse sand of 2.20 fineness modules in 1:4over brick work minimum thickness not to be less than 1cm. incluing supply of all materials, labour, tools & plants etc. required for proper completion of the work.si new item 13.11 |
| 21 | Distempering two with oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an even shade over and including a priming coat with cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paint after thoroughly brushing the surface free from mortar dropping and other foreign matters andalso including the surface even with plaster of Paris or approved synthetic materials and sand papered smooth including supply of all materials, labour,Tools & plants etc.required for proper completion of the work |