}

Tender For Rate Contract For Handling And Fabrication Of Various Material In Divisional Stores At Narwal Under The Jurisdiction Of Jpdcl Electric Div-I, Parade, Jammu For The Financial Year 2024-25, jammu-Jammu And Kashmir

Power Development Department has published Tender For Rate Contract For Handling And Fabrication Of Various Material In Divisional Stores At Narwal Under The Jurisdiction Of Jpdcl Electric Div-I, Parade, Jammu For The Financial Year 2024-25. Submission Date for this Tender is 21-02-2024. Excavation Work Tenders in jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

41927555
Tender For Rate Contract For Handling And Fabrication Of Various Material In Divisional Stores At Narwal Under The Jurisdiction Of Jpdcl Electric Div-I, Parade, Jammu For The Financial Year 2024-25
Open Tender
Indian
Jammu And Kashmir
jammu
21-02-2024

Tender Details

Rate Contract For Handling And Fabrication Of Various Material In Divisional Stores At Narwal Under The Jurisdiction Of Jpdcl Electric Div-I, Parade, Jammu For The Financial Year 2024-25-2 Unloading of PCC 8 Mtr Pole 3 Unloading of PCC 9 Mtr Pole 4 Unloading of PCC 11 Mtr Pole 5 Unloading of ST 8 Mtr Pole 6 Unloading of ST 9 Mtr Pole 7 Unloading of ST 11 Mtr Pole 8 Unloading of ST 13 Mtr Pole 9 loading of PCC 8 Mtr Pole 10 loading of PCC 9 Mtr Pole 11 loading of PCC 11 Mtr Pole 12 loading of ST 8 Mtr Pole 13 loading of ST 9 Mtr Pole 14 loading of ST 11 Mtr Pole 15 loading of ST 13 Mtr Pole 16 Dragging of PCC 8 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking 17 Dragging of PCC 9 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking 18 Dragging of PCC 11 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking 19 Dragging of ST 8 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking 20 Dragging of ST 9 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking 21 Dragging of ST 11 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking 22 Dragging of ST 13 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking 23 loading of 25 KVA Transformer 24 loading of 63 KVA Transformer 25 loading of 100 KVA Transformer 26 loading of 250 KVA Transformer 27 loading of 300 KVA Transformer 28 loading of 400 KVA Transformer 29 loading of 500 KVA Transformer 30 loading of 630 KVA Transformer 31 Unloading of 25 KVA Transformer(New/Write BackTransformer) 32 Unloading of 63 KVA Transformer(New/Write BackTransformer) 33 Unloading of 100 KVA Transformer(New/Write BackTransformer) 34 Unloading of 250 KVA Transformer(New/Write BackTransformer) 35 Unloading of 300 KVA Transformer(New/Write BackTransformer) 36 Unloading of 400 KVA Transformer(New/Write BackTransformer) 37 Unloading of 500 KVA Transformer(New/Write BackTransformer) 38 Unloading of 630 KVA Transformer(New/Write BackTransformer) 39 Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 40 Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 41 Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly 42 Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly 43 Dragging of existing /New /Damaged 300 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly 44 Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 45 Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 46 Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 47 Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 48 Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 49 Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 50 Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking 51 Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 52 Unloading of Old /New ACSR Squirel Conductor 53 Unloading of Old /New ACSR Weasel Conductor 54 Unloading of Old /New ACSR Rabbit Conductor 55 Unloading of Old /New ACSR Dog Conductor 56 Loading of Old/New ACSR SquirelConductor 57 Loading of Old/New ACSR WeaselConductor 58 Loading of Old/New ACSR RabbitConductor 59 Loading of Old /New ACSR Dog Conductor 60 Shifting of Old/New ACSR Squirel Conductor from unloading site to stacking siteat an average distance upto 100 Mtr and its stacking 61 Shifting of Old/New ACSR WeaselConductor from unloading site to stacking siteat an average distance upto 100 Mtr and its stacking 62 Shifting of Old/New ACSR Rabbit Conductor from unloading site to stacking siteat an average distance upto 100 Mtr and its stacking 63 Shifting of Old/New ACSR Squirel Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking 64 Shifting of Old/New ACSR Weasel Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking 65 Shifting of Old/New ACSR Rabit Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking 66 Unloading of Channel/Angle/Flat Iron 67 Loading of Channel/Angle/Flat Iron 68 Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 69 Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking 70 Unloading of Link Set 71 Unloading of HG Set 72 Unloading of GO Set 73 Unloading of DO Set 74 Unloading of LA Set 75 Loading of Link Set 76 Loading of HG Set 77 Loading of GO Set 78 Loading of DO Set 79 Loading of LA Set 80 Unloading of CT/PT Unit 81 Loading of CT/PT Unit 82 Unloading or Loading of SE AL Wire of all sizes 83 Unloading or Loading of SE Cu Wire of all sizes 84 Unloading or Loading of LV Bush Rod M-12 85 Unloading or Loading of LV Bush Rod M-20 86 Unloading or Loading of LV Bush Rod M-30 87 Unloading or Loading of HV Bush 11KV 88 Unloading or Loading of HV Bush Rod 89 Unloading or Loading of LV Bush M-12 90 Unloading or Loading of LV Bush M-20 91 Unloading or Loading of LV Bush M-25/30 92 Unloading or Loading of Lethoride Paper 93 Unloading or Loading of Khakhi Paper 94 Unloading or Loading of Gutties 95 Unloading or Loading of Washers of sizes 96 Unloading or Loading of cork sheetof sizes 97 Unloading or Loading of cork stripof sizes 98 Unloading or Loading of cotton tape/bovin tapeof sizes 99 Unloading or Loading of craft paper 100 Unloading or Loading of packing sheet/pressboard 101 Unloading or Loading of Nuts and bolts of sizes 102 Unloading or Loading of wooden wedges 103 Unloading or Loading of Bakelite tubes 1 mtr 104 Unloading or Loading of Transformer oil 105 Unloading or Loading of Breather 106 Unloading or Loading of Welding Rods 107 Unloading or Loading of allied material for HT/LT Line/Substations material(i.e. Disc/Pin/Shackle/Busbar Insulators etc) 108 Unloading or Loading of allied material for HT/LT Line/Substations material like Guy wire/G.I Wire 109 Unloading or Loading of Staysets/Guy 110 Unloading or Loading of Tension/Suspension fitting/eye bolt 111 Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly 112 Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rodsetc) for making space for other store material 113 Unloading/Loading of BammbooLadder 114 Unloading/Loading of Single/Three Phase Meters 115 Unloading of PVC Cable single core 95 mmsq 116 Unloading of PVC Cable single core 120 mmsq 117 Unloading of PVC Cable single core 185 mmsq 118 Unloading of PVC Cable single core 300 mmsq 119 Unloading of PVC Cable single core 400 mmsq 120 Unloading of PVC Cable single core 630 mmsq 121 Loading of PVC Cable single core 95 mmsq 122 Loading of PVC Cable single core 120 mmsq 123 Loading of PVC Cable single core 185 mmsq 124 Loading of PVC Cable single core 300 mmsq 125 Loading of PVC Cable single core 400 mmsq 126 Loading of PVC Cable single core 630 mmsq 127 Unloadingof AB HT Cable 35 mmsq. 128 Unloading of AB HT Cable 50 mmsq. 129 Unloading of AB HT Cable 70 mmsq./95mmsq 130 Unloading of AB HT Cable 120 mmsq./185 mmsq 131 loading of AB HT Cable 35 mmsq. 132 loading of AB HT Cable 50 mmsq. 133 loading of AB HT Cable 70/95 mmsq. 134 loading of AB HT Cable 120 /185mmsq. 135 Unloading of AB LT Cable35/ 50 mmsq. 136 Unloading of AB LT Cable 70/95 mmsq./3.5 core LTcable 137 Unloading of AB LT Cable 120 /185 mmsq./3.5 core Ltcable 138 loading of AB LT Cable 35/50 mmsq. 139 loading of AB LT Cable 70/95 mmsq/.3.5 core Ltcable 140 loading of AB LT Cable 120/185 mmsq./3.5 core Ltcable 141 Unloading of HT XLPECable 35/50mmsq. 142 Unloading of HT XLPE Cable 95/120 mmsq. 143 Unloading of HT XLPE Cable 150 mmsq./ 144 Unloading of HT XLPE Cable 185 mmsq. 145 Unloading of HT XLPECable 300 mmsq. 146 loading of HT XLPECable 35/50mmsq. 147 loading of HT XLPE Cable 95/120 mmsq. 148 loading of HT XLPE Cable 150 mmsq. 149 loading of HT XLPE Cable 185 mmsq. 150 loading of HT XLPECable 300 mmsq. 151 Unloading of LT XLPE Cable 35/50 mmsq.single core 152 Unloading of LT XLPE Cable 70 mmsq.single core 153 Unloading ofLT XLPE Cable 95 mmsq.single core 154 Unloading of LT XLPE Cable 120 mmsq.single coree 155 Unloading of LT XLPE Cable 185 mmsq.single core 156 Unloading ofLT XLPE Cable 300 mmsq.siongle core 157 loading of LT XLPE Cable 35/50 mmsq.single core 158 loading of LT XLPE Cable 70 mmsq.single core 159 loading ofLT XLPE Cable 95 mmsq.single core 160 loading of LT XLPE Cable 120 mmsq.single coree 161 loading of LT XLPE Cable 185 mmsq.single core 162 loading ofLT XLPE Cable 300 mmsq.siongle core 163 Shifting of AB HT CABLE 35 mmsq from unloading site to stacking site and stacking properly 164 Shifting of AB HT CABLE 50 mmsq from unloading site to stacking site and stacking properly 165 Shifting of AB HT CABLE 70 /95 mmsq from unloading site to stacking site and stacking properly 166 Shifting of AB HT CABLE 120/185 mmsq from unloading site to stacking site and stacking properly 167 Shifting ofHT XLPE CABLE 35 mmsq from unloading site to stacking site and stacking properly 168 Shifting ofHT XLPE CABLE 50 mmsq from unloading site to stacking site and stacking properly 169 Shifting of HT XLPE CABLE 70/95 mmsq from unloading site to stacking site and stacking properly 170 Shifting of HT XLPE CABLE 120/185 mmsq from unloading site to stacking site and stacking properly 171 Shifting of AB LT CABLE 35 /50 mmsq from unloading site to stacking site and stacking properly 172 Shifting of AB LT CABLE 70 /95 mmsq from unloading site to stacking site and stacking properly 173 Shifting of AB LT CABLE 120 /185 mmsq from unloading site to stacking site and stacking properly 174 Shifting ofLT XLPE CABLE 35 /50 mmsq from unloading site to stacking site and stacking properly 175 Shifting of LT XLPE CABLE 70 mmsq from unloading site to stacking site and stacking properly 176 Shifting of LT XLPE CABLE 95 mmsq from unloading site to stacking site and stacking properly 177 Shifting of LT XLPE CABLE 120 mmsq from unloading site to stacking site and stacking properly 178 Shifting of LT XLPE CABLE 185 mmsq from unloading site to stacking site and stacking properly 179 Shifting of LT XLPE CABLE 300 mmsq from unloading site to stacking site and stacking properly 180 Fabrication of Channel Cross Armsof sorts from MS Channel of sizes 181 Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes 182 Fabrication of clamps of sizesfrom MS flat (suitable for 8 mtr 9mtr,11 mtr and 13 mtr poles) 183 Fabrication of Earthing Plates , Cable duct cover from MSplate as per REC Standards 184 Fabrication of earthing spikes from MStor steel of sorts as per REC Standards 185 Fabrication of ST polesby way of drilling of extra holes 186 Fabrication of foundation bolts from MStor steel including threading as per REC Standards 187 Fabrication of Earthing pipefrom GI pipe and welding of earthing plate as per REC Standards 188 Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines 189 Unreeling and layingof the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum 190 Unreeling and laying of theXLPE/PVC /Single core cables ofsizes from the drum 191 Measuring,Cutting of ACSR Dog/Weasel/Rabbit/Squirrel conductor of required lengths ,making rolls of conductor and binding. 192 Measuring,Cutting of XLPE/PVC Single core Cable of required lengths ,making rollsand binding. 193 Unreeling and laying of theXLPE/PVC /AB Three core /3.5 core cables ofsizes from the drum 194 Measuring,Cutting of XLPE/PVC /AB Three core/3.5 coreCable of required lengths ,making rollsand binding. 195 Carriage /Shifting of ACSR Rabbit/Weasel/Squirrel/Dog conductor from stacking site to loading site 196 Carriage /Shifting of ACSR Rabbit/Weasel/Squirrel/Dog conductor from unloading site to stacking site 197 Carriage /Shifting ofXLPE/PVC Single core Cable from unloading site to stacking site 198 Carriage /Shifting of XLPE/PVC Single core Cable from stacking site to loading site 199 Carriage/Shifting ofXLPE/PVC /AB Three core/3.5 coreCable from unloading site to stacking site 200 Carriage of XLPE/PVC /AB Three core/3.5 coreCable from unloading site to stacking site 201 Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators ,fittings, Pin insulators with pins etc 202 Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.and stacking 203 Cutting of Vegetation, Bushes , Wild Grass, treesto avoid any mishappening of untoward incidents 204 Carriage of Green Vegetation Bushes , Wild Grass, trees after cutting and dumping away from store 205 Straightening of tilted fencing posts in the store premises for repair of fecning 206 Insertion of new fencing Posts in the store for repair of fencing 207 Dismantling of existing mesh fencing 208 Fixing of mesh Fencing 209 Fixiing of CGI Sheets 210 Dismantling of CGI sheets 211 Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 25/63/100 KVA 212 Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 250/400/630KVA 213 Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking 214 Painting of Red oxide/Aluminium Paint) ofFabricated Material. 215 Unloading of old loose conductor and making bundles 216 Checking & maggeringof 11KV LA setHG set GO set CT/PT unit 217 Unloading of PVC Cable 16 mmsq. 2 core 1.1KV grade 218 loading of PVC Cable 16 mmsq. 2 core 1.1KV grade 219 Shfting/Carriage of 16 mmsq 2 core PVC Cable upto 100 mtr 220 Unloading of PVC Cable 10 mmsq. 2 core 1.1KV grade 221 loading of PVC Cable 16 mmsq. 2 core 1.1KV grade 222 Shfting/Carriage of 16 mmsq 2 core PVC Cable upto 100 mtr 223 Unloading OR Loading of PVC Cable single core 50 mmsq 224 Unloading orLoadingof PVC Cable single core 120 mmsq 225 Shfting/Carriage of 1 core PVC Cable50 mm upto 100 mtr 226 Shfting/Carriage of 1 core PVC Cable120 mm upto 100 mtr 227 Unloading/Loading of Paint 228 Unloading/Loading of IPC 229 Unloading/Loading of Mid span straight through jointing kit 230 Unloading/Loading of LT 3.5 Core jointing kit 231 Unloading/Loading of 11kv 3 core straight through jointing kit 232 Unloading/Loading of 11kv 1 core straight through jointing kit 233 Unloading/Loading of trivector meter 234 Unloading/Loading of 11KV Isolator 235 Unloading/Loading of changeover switch 236 Unloading/Loading of MCB/MCCB 237 Unloading/Loading Of Flood light 238 Drilling of holes in M.S Iron for fabrication

Key Value

Document Fees
INR 1000 /-
EMD
INR 30000.0 /-
Tender Value
Refer document

BOQ Items

Fixing of Rate Contract for handling and fabrication of various material in Divisional stores at Narwal Under the jurisdiction of JPDCL Electric Division-I, Parade, Jammu. For the financial year 2024-25.
Sl. No. Item Description
1Fixing of Rate Contract for handling and fabrication of various material in Divisional stores at Narwal Under the jurisdiction of JPDCL Electric Division-I, Parade, Jammu for the financial year 2024-25.
2Unloading of PCC 8 Mtr Pole
3Unloading of PCC 9 Mtr Pole
4Unloading of PCC 11 Mtr Pole
5Unloading of ST 8 Mtr Pole
6Unloading of ST 9 Mtr Pole
7Unloading of ST 11 Mtr Pole
8Unloading of ST 13 Mtr Pole
9loading of PCC 8 Mtr Pole
10loading of PCC 9 Mtr Pole
11loading of PCC 11 Mtr Pole
12loading of ST 8 Mtr Pole
13loading of ST 9 Mtr Pole
14loading of ST 11 Mtr Pole
15loading of ST 13 Mtr Pole
16Dragging of PCC 8 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking
17Dragging of PCC 9 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking
18Dragging of PCC 11 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking
19Dragging of ST 8 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking
20Dragging of ST 9 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking
21Dragging of ST 11 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking
22Dragging of ST 13 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking
23loading of 25 KVA Transformer
24loading of 63 KVA Transformer
25loading of 100 KVA Transformer
26loading of 250 KVA Transformer
27loading of 300 KVA Transformer
28loading of 400 KVA Transformer
29loading of 500 KVA Transformer
30loading of 630 KVA Transformer
31Unloading of 25 KVA Transformer(New/Write BackTransformer)
32Unloading of 63 KVA Transformer(New/Write BackTransformer)
33Unloading of 100 KVA Transformer(New/Write BackTransformer)
34Unloading of 250 KVA Transformer(New/Write BackTransformer)
35Unloading of 300 KVA Transformer(New/Write BackTransformer)
36Unloading of 400 KVA Transformer(New/Write BackTransformer)
37Unloading of 500 KVA Transformer(New/Write BackTransformer)
38Unloading of 630 KVA Transformer(New/Write BackTransformer)
39Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
40Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
41Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
42Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
43Dragging of existing /New /Damaged 300 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
44Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
45Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
46Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
47Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
48Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
49Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
50Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking
51Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
52Unloading of Old /New ACSR Squirel Conductor
53Unloading of Old /New ACSR Weasel Conductor
54Unloading of Old /New ACSR Rabbit Conductor
55Unloading of Old /New ACSR Dog Conductor
56Loading of Old/New ACSR SquirelConductor
57Loading of Old/New ACSR WeaselConductor
58Loading of Old/New ACSR RabbitConductor
59Loading of Old /New ACSR Dog Conductor
60Shifting of Old/New ACSR Squirel Conductor from unloading site to stacking siteat an average distance upto 100 Mtr and its stacking
61Shifting of Old/New ACSR WeaselConductor from unloading site to stacking siteat an average distance upto 100 Mtr and its stacking
62Shifting of Old/New ACSR Rabbit Conductor from unloading site to stacking siteat an average distance upto 100 Mtr and its stacking
63Shifting of Old/New ACSR Squirel Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking
64Shifting of Old/New ACSR Weasel Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking
65Shifting of Old/New ACSR Rabit Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking
66Unloading of Channel/Angle/Flat Iron
67Loading of Channel/Angle/Flat Iron
68Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
69Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking
70Unloading of Link Set
71Unloading of HG Set
72Unloading of GO Set
73Unloading of DO Set
74Unloading of LA Set
75Loading of Link Set
76Loading of HG Set
77Loading of GO Set
78Loading of DO Set
79Loading of LA Set
80Unloading of CT/PT Unit
81Loading of CT/PT Unit
82Unloading or Loading of SE AL Wire of all sizes
83Unloading or Loading of SE Cu Wire of all sizes
84Unloading or Loading of LV Bush Rod M-12
85Unloading or Loading of LV Bush Rod M-20
86Unloading or Loading of LV Bush Rod M-30
87Unloading or Loading of HV Bush 11KV
88Unloading or Loading of HV Bush Rod
89Unloading or Loading of LV Bush M-12
90Unloading or Loading of LV Bush M-20
91Unloading or Loading of LV Bush M-25/30
92Unloading or Loading of Lethoride Paper
93Unloading or Loading of Khakhi Paper
94Unloading or Loading of Gutties
95Unloading or Loading of Washers of sizes
96Unloading or Loading of cork sheetof sizes
97Unloading or Loading of cork stripof sizes
98Unloading or Loading of cotton tape/bovin tapeof sizes
99Unloading or Loading of craft paper
100Unloading or Loading of packing sheet/pressboard
101Unloading or Loading of Nuts and bolts of sizes
102Unloading or Loading of wooden wedges
103Unloading or Loading of Bakelite tubes 1 mtr
104Unloading or Loading of Transformer oil
105Unloading or Loading of Breather
106Unloading or Loading of Welding Rods
107Unloading or Loading of allied material for HT/LT Line/Substations material(i.e. Disc/Pin/Shackle/Busbar Insulators etc)
108Unloading or Loading of allied material for HT/LT Line/Substations material like Guy wire/G.I Wire
109Unloading or Loading of Staysets/Guy
110Unloading or Loading of Tension/Suspension fitting/eye bolt
111Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly
112Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rodsetc) for making space for other store material
113Unloading/Loading of BammbooLadder
114Unloading/Loading of Single/Three Phase Meters
115Unloading of PVC Cable single core 95 mmsq
116Unloading of PVC Cable single core 120 mmsq
117Unloading of PVC Cable single core 185 mmsq
118Unloading of PVC Cable single core 300 mmsq
119Unloading of PVC Cable single core 400 mmsq
120Unloading of PVC Cable single core 630 mmsq
121Loading of PVC Cable single core 95 mmsq
122Loading of PVC Cable single core 120 mmsq
123Loading of PVC Cable single core 185 mmsq
124Loading of PVC Cable single core 300 mmsq
125Loading of PVC Cable single core 400 mmsq
126Loading of PVC Cable single core 630 mmsq
127Unloadingof AB HT Cable 35 mmsq.
128Unloading of AB HT Cable 50 mmsq.
129Unloading of AB HT Cable 70 mmsq./95mmsq
130Unloading of AB HT Cable 120 mmsq./185 mmsq
131loading of AB HT Cable 35 mmsq.
132loading of AB HT Cable 50 mmsq.
133loading of AB HT Cable 70/95 mmsq.
134loading of AB HT Cable 120 /185mmsq.
135Unloading of AB LT Cable35/ 50 mmsq.
136Unloading of AB LT Cable 70/95 mmsq./3.5 core LTcable
137Unloading of AB LT Cable 120 /185 mmsq./3.5 core Ltcable
138loading of AB LT Cable 35/50 mmsq.
139loading of AB LT Cable 70/95 mmsq/.3.5 core Ltcable
140loading of AB LT Cable 120/185 mmsq./3.5 core Ltcable
141Unloading of HT XLPECable 35/50mmsq.
142Unloading of HT XLPE Cable 95/120 mmsq.
143Unloading of HT XLPE Cable 150 mmsq./
144Unloading of HT XLPE Cable 185 mmsq.
145Unloading of HT XLPECable 300 mmsq.
146loading of HT XLPECable 35/50mmsq.
147loading of HT XLPE Cable 95/120 mmsq.
148loading of HT XLPE Cable 150 mmsq.
149loading of HT XLPE Cable 185 mmsq.
150loading of HT XLPECable 300 mmsq.
151Unloading of LT XLPE Cable 35/50 mmsq.single core
152Unloading of LT XLPE Cable 70 mmsq.single core
153Unloading ofLT XLPE Cable 95 mmsq.single core
154Unloading of LT XLPE Cable 120 mmsq.single coree
155Unloading of LT XLPE Cable 185 mmsq.single core
156Unloading ofLT XLPE Cable 300 mmsq.siongle core
157loading of LT XLPE Cable 35/50 mmsq.single core
158loading of LT XLPE Cable 70 mmsq.single core
159loading ofLT XLPE Cable 95 mmsq.single core
160loading of LT XLPE Cable 120 mmsq.single coree
161loading of LT XLPE Cable 185 mmsq.single core
162loading ofLT XLPE Cable 300 mmsq.siongle core
163Shifting of AB HT CABLE 35 mmsq from unloading site to stacking site and stacking properly
164Shifting of AB HT CABLE 50 mmsq from unloading site to stacking site and stacking properly
165Shifting of AB HT CABLE 70 /95 mmsq from unloading site to stacking site and stacking properly
166Shifting of AB HT CABLE 120/185 mmsq from unloading site to stacking site and stacking properly
167Shifting ofHT XLPE CABLE 35 mmsq from unloading site to stacking site and stacking properly
168Shifting ofHT XLPE CABLE 50 mmsq from unloading site to stacking site and stacking properly
169Shifting of HT XLPE CABLE 70/95 mmsq from unloading site to stacking site and stacking properly
170Shifting of HT XLPE CABLE 120/185 mmsq from unloading site to stacking site and stacking properly
171Shifting of AB LT CABLE 35 /50 mmsq from unloading site to stacking site and stacking properly
172Shifting of AB LT CABLE 70 /95 mmsq from unloading site to stacking site and stacking properly
173Shifting of AB LT CABLE 120 /185 mmsq from unloading site to stacking site and stacking properly
174Shifting ofLT XLPE CABLE 35 /50 mmsq from unloading site to stacking site and stacking properly
175Shifting of LT XLPE CABLE 70 mmsq from unloading site to stacking site and stacking properly
176Shifting of LT XLPE CABLE 95 mmsq from unloading site to stacking site and stacking properly
177Shifting of LT XLPE CABLE 120 mmsq from unloading site to stacking site and stacking properly
178Shifting of LT XLPE CABLE 185 mmsq from unloading site to stacking site and stacking properly
179Shifting of LT XLPE CABLE 300 mmsq from unloading site to stacking site and stacking properly
180Fabrication of Channel Cross Armsof sorts from MS Channel of sizes
181Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes
182Fabrication of clamps of sizesfrom MS flat (suitable for 8 mtr 9mtr,11 mtr and 13 mtr poles)
183Fabrication of Earthing Plates , Cable duct cover from MSplate as per REC Standards
184Fabrication of earthing spikes from MStor steel of sorts as per REC Standards
185Fabrication of ST polesby way of drilling of extra holes
186Fabrication of foundation bolts from MStor steel including threading as per REC Standards
187Fabrication of Earthing pipefrom GI pipe and welding of earthing plate as per REC Standards
188Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines
189Unreeling and layingof the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum
190Unreeling and laying of theXLPE/PVC /Single core cables ofsizes from the drum
191Measuring,Cutting of ACSR Dog/Weasel/Rabbit/Squirrel conductor of required lengths ,making rolls of conductor and binding.
192Measuring,Cutting of XLPE/PVC Single core Cable of required lengths ,making rollsand binding.
193Unreeling and laying of theXLPE/PVC /AB Three core /3.5 core cables ofsizes from the drum
194Measuring,Cutting of XLPE/PVC /AB Three core/3.5 coreCable of required lengths ,making rollsand binding.
195Carriage /Shifting of ACSR Rabbit/Weasel/Squirrel/Dog conductor from stacking site to loading site
196Carriage /Shifting of ACSR Rabbit/Weasel/Squirrel/Dog conductor from unloading site to stacking site
197Carriage /Shifting ofXLPE/PVC Single core Cable from unloading site to stacking site
198Carriage /Shifting of XLPE/PVC Single core Cable from stacking site to loading site
199Carriage/Shifting ofXLPE/PVC /AB Three core/3.5 coreCable from unloading site to stacking site
200Carriage of XLPE/PVC /AB Three core/3.5 coreCable from unloading site to stacking site
201Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators ,fittings, Pin insulators with pins etc
202Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.and stacking
203Cutting of Vegetation, Bushes , Wild Grass, treesto avoid any mishappening of untoward incidents
204Carriage of Green Vegetation Bushes , Wild Grass, trees after cutting and dumping away from store
205Straightening of tilted fencing posts in the store premises for repair of fecning
206Insertion of new fencing Posts in the store for repair of fencing
207Dismantling of existing mesh fencing
208Fixing of mesh Fencing
209Fixiing of CGI Sheets
210Dismantling of CGI sheets
211Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 25/63/100 KVA
212Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 250/400/630KVA
213Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking
214Painting of Red oxide/Aluminium Paint) ofFabricated Material.
215Unloading of old loose conductor and making bundles
216Checking & maggeringof 11KV LA setHG set GO set CT/PT unit
217Unloading of PVC Cable 16 mmsq. 2 core 1.1KV grade
218loading of PVC Cable 16 mmsq. 2 core 1.1KV grade
219Shfting/Carriage of 16 mmsq 2 core PVC Cable upto 100 mtr
220Unloading of PVC Cable 10 mmsq. 2 core 1.1KV grade
221loading of PVC Cable 16 mmsq. 2 core 1.1KV grade
222Shfting/Carriage of 16 mmsq 2 core PVC Cable upto 100 mtr
223Unloading OR Loading of PVC Cable single core 50 mmsq
224Unloading orLoadingof PVC Cable single core 120 mmsq
225Shfting/Carriage of 1 core PVC Cable50 mm upto 100 mtr
226Shfting/Carriage of 1 core PVC Cable120 mm upto 100 mtr
227Unloading/Loading of Paint
228Unloading/Loading of IPC
229Unloading/Loading of Mid span straight through jointing kit
230Unloading/Loading of LT 3.5 Core jointing kit
231Unloading/Loading of 11kv 3 core straight through jointing kit
232Unloading/Loading of 11kv 1 core straight through jointing kit
233Unloading/Loading of trivector meter
234Unloading/Loading of 11KV Isolator
235Unloading/Loading of changeover switch
236Unloading/Loading of MCB/MCCB
237Unloading/Loading Of Flood light
238Drilling of holes in M.S Iron for fabrication
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail