Tender For Construction Of One Lakh Litre Capacity Sumpat Kattur - Krishna Nagar H / O Kattur. ; 2 Earthwork Excavation And Depositing On Bank With An Initial Lead & Lift In Hard Stiff Clay, Gravelly Soil, ShaleS, Murrams Earth Mixed Soil As Per Ss 20 B For Foundation First Depth Of 0 To 2 M 3 For Sdr 4 For Dmr Not Requiring Blasting 5 Cement Concrete In 1:4:8 Mix Using 40 Mm Metal Used For Foundationincluding Cost & Conveyance Of All Materials To Site And All Labour Charges For Curing, Compacting Etc., Complete. 6 Cement Concrete 1:1.5:3 Using 20Mm Iss Hbg Metal For All Rcc Item Of Works Excluding Cost Of Rein For Cement And Fabricating Charges, Centering And Shuttering But Including Curing And Providing Fixtures Like Fan Clamps In The Rcc Floor Or Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls , Sides And Bottom Of The Slabs, Beams Etc., Shall Be Finished Smooth With Cement Mortar 1:3, 12Mm Thick. And With Kraft Paper Without Claiming Extra As Directed By The Departmental Officers Complete Complying With Standard Specifications.Beyond 1.50 M & Upto 4.50 M Below Gl 7 Upto 1.50 M Below Gl 8 Upto 4.50 M Above Gl From Gl 9 Supply And Erecting Of Steel Shuttering For Rcc Works Using Ms Sheets And Angles And Strutting Up To 3.00 In Height Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc. Complete.For0.00 To 3.30 M ( Plane Surface ) 10 For0.00 To 3.30 M ( Plane Surface ) 11 For Circular Column 12 For 3.30 M- 4.3 M ( Plane Surface ) 13 Supplying And Fabricating And Placing In Position Ms Steel Or Ribbed For Steel For All Reinforced Cement Concrete Works As Per The Design Given Including Cost Of Steel And Binding Wire In All Floors Etc., Complete Complying With Standard Specification. 14 Providing Rcc ( 1:1.5:3 ) Ventilator Of 0.150 M Dia Using 20Mm Hbg Stone Including Cost Of All Materials, Centering, Shuttering, Strutting, Reinforcement, Placing Of Concrete, Finishing, Curing And Fixing In Position On The Roof Slab With Mosquito Proof Net Arrangement And Etc., 15 Supply, Delivery And Fixing Of Ci Manhole Frame With Cover Of Following Size Including Cost Of All Materials, Fixing Of Ms Clamps, Bolt And Nuts Etc., Complete And As Directed Byofficers.Size 0.60M X0.60M 16 Supplying And Fixing In Position Of Rcc ( 1:1.5:3 ) In Side Access Lader Of Following Size Using 20Mm Size Hbs Jelly Including Cost Of All Materials, Centring, Shuttering, Strutting, Fabrication And Placing In Position Of Reinforcement, Finishing, Curing Etc., Completeand As Directed By Officers. 17 Provision For Supply & Fixing Of Ms Ladder Including Painting Etc. Complete. 18 Painting Two Coats With Best Emulsion Paint Including All Cost Of Materials & Labour Charges Etc. Complete.And As Directed By Twad Board Officers. 19 Earth Work Excavation In All Strata For Laying Pipes Including Refillinig Charges Etc. Complete As Directed By Twad Bd Officers 20 Cost And Supply Of 63Mm 6Ksc Pipes Etc., 21 Laying And Jointing Of Pvc Pipes Etc., 22 Pedastal :Earthwork Excavation And Depositing On Bank 23 C.C.1:4:8Mix Using 40Mm Metal Including All Cost Etc., 24 R.R.Masonry In C.M 1:5Mixincluding All Cost Etc., 25 Supply And Filling Of Carted Earth 26 Brickworkin C.M 1:5Mixincluding All Cost Etc., 27 Plasteringin C.M 1:5Mix , 12Mm Thick Including All Cost Etc., 28 Whitewashing Two Coats With Shell Lime Including All Cost Etc., 29 Supply And Fixing Of M.S.Kiosk Of Size 0.75 X 0.45 X 0.75 M Size 30 Pipe Connetion Work To Sump Including Cost Labour, Materials , Construction Of Valve Pits Etc, . Complete Complying With Standard Specifications 31 Provision For Electrical Items 32 Provision For Nameboard Etc., 33 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd )