Metropolitan Transport Corporation [chennai] Limited has published Tender For Work Order For Reconditioning Of Certain Mechanical Assembly And Spares Through Outsourcing Labour Contract. Submission Date for this Tender is 08-12-2023. Railway Ancillaries Tenders in chennai Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Reconditioning of certain Mechanical Assembly and Spares through Outsourcing Labour contract |
2 | Brake Drum Skimming works (Ashok Leyland & TATA)- Inside MTC premises |
3 | Reconditioning of Lined Brake shoes (Ashok Leyland & TATA)- Inside MTC premises |
4 | Brake Drum Skimming works (Leyland & TATA Small bus)- Inside MTC premises |
5 | Reconditioning of Lined Brake shoes (Leyland & TATA Small bus)- Inside MTC premises |
6 | Air Compressor Cylinder boring and Re-sleeving Works (Leyland & TATA) (Re-Sleeving and Boring of Air Compressor Cylinder Block to STD Size, Sleeve Outer Dia should be 82.50mm, Inner Dia Should be 80mm)- Outside MTC premises |
7 | Re-Conditioning of Front Axle Assy. (After Completed King Pin Setting Work, Front Axle is handed over to the work contractor. After inspection of Bearing & Hub free load to be checked. Greased Bearing & Hub to be fitted in the Axle. After inspection of S-Cam Shaft ,Slack AdjusterLined Shoe, Tie Rod Assembly, Drag Link Assembly, Brake Chamber, Brake Drum to be fitted, Wheel Alignment to be carried out and if any Front Axle related work to be carried out, Paint to be coated.)-Inside MTC premises |
8 | Dismantling, Cleaning & Washing of OldFront axle Assy. (Ashok Leyland & TATA )-Inside MTC premises |
9 | Dismantling, Cleaning & Washing of Old Clutch Kit (Ashok Leyland & TATA )-Inside MTC premises |
10 | Dismantling, Cleaning & Washing of old Crown assembly (Leyland & TATA)-Inside MTC premises |
11 | Re-Conditioning of Flywheel Assy.(Ashok Leyland ) (Removing of Back plate, Surfacing the Back plate, Assembling the Back Plate with Shim to the correct measurement, Assembling the Back plate with Flywheel, Replacing defective flywheel ring, Checking and correcting the threaded holes.)-Inside MTC premises |
12 | Re-Conditioning and Conversion ofPressure Plate in to Face Plate (Two Side facing to reduce for 14 mm thickness, Turning works (OD-355mm and ID 195 mm), Drilling and tapping works of 12 holes with 8mm Dia in back side)- Outside MTC premises |
13 | Re-Conditioning of Leyland Clutch Disc (Removing of worn out Ceramic Pads, Refitting of New Ceramic Pads with 5.8mm Thickness)- Outside MTC premises |
14 | Re-Conditioning of TATA Red bus Clutch Disc (model no. LP 1515) (Removing of worn out Ceramic Pads, Refitting of New Ceramic Pads with 4.8mm Thickness)- Outside MTC premises |
15 | Re-Conditioning of Tata small bus Clutch Disc (model no. LP 712) (Removing of worn out Organic facing and refitting of new Organic facing with 4.0mm thickness)- Outside MTC premises |
16 | Re-Conditioning of Tata Small Bus Cover Assembly (Replacing Tensioner Plate, Pressure Plate Facing, Diaphragm Finger Seating Area to be Corrected).- Outside MTC premises |
17 | Re-Conditioning of TATA BS IV Clutch Disc - 330 mm Dia (model no. LP 1613) (Removing of worn out Ceramic Pads, Refitting of New Ceramic Pads with 4.8mm Thickness)- Outside MTC premises |
18 | Re-Conditioning of Leyland A/c Bus Clutch Disc (Removing of worn out Organic Pads, Refitting of New organic Pads with 4.5mm Thickness)- Outside MTC premises |
19 | Re-Conditioning of Leyland A/c BusCover Assembly (Replacing Tensioner Plate, Pressure Plate Facing, Diaphragm Finger Seating Area to be Corrected).- Outside MTC premises |
20 | Re-Conditioning work ofClutch Disc Hub & Coil Spring Shake Arresting (Leyland) (Coil Spring & coil spring plate to be changed, Bend to be removed)- Outside MTC premises |
21 | Dismantling, Cleaning and Washing of Engine Air Compressor (Leyland & Tata)-Inside MTC premises |
22 | Re-Conditioning ofClutch Pedal Assembly (Dismantling, Cleaning and Washing, Clutch Pedal Shaft Welding and Turning to 31.5mm Diameter, Steel Bush Should be replaced – 2 Nos. Cotter Bolt & Nut should be replaced, Tread Plate should be replaced, Grease Nipple should be replaced).- Outside MTC premises |
23 | Re-Conditioning of Gear Linkage (BSIII) (Dismantling, Cleaning and Washing, LH Ball Joint with Nut should be replaced-1 No., RHBall Joint with Nut should be replaced-2 Nos., Fulcrum Pin should be replaced – 1 No. Bi-Metal Bush should be replaced – 2 Nos., Connection Flange should be replaced-1 No. (If Damaged), Welding work to be carried if necessary.)- Outside MTC premises |
24 | Re-Conditioning of Gear Linkage (SLF) (Dismantling, Cleaning and Washing, LH Ball Joint with Nut should be replaced-1 No., RH Ball Joint with Nut should be replaced-2 Nos., Fulcrum Pin should be replaced – 1 No. BiMetal Bush should be replaced – 2 Nos., Connection Flange should be replaced-1 No. (If Damaged), Knuckle Ball Joint with Circlip should be replaced-1 No. Knuckle should be replaced-1 No.(If Damaged), Speed Changing Lever Bottom should be replaced – 1 No. (If Damaged), Welding work to be carried if necessary.)- Outside MTC premises |
25 | Dismantling, Cleaning & Washing of Gear box assembly (Ashok Leyland & TATA )-Inside MTC premises |
26 | Re –Conditioning Work of Leyland & Tata Spring Assembly (Front & Rear)-Inside MTC premises |
27 | Re –Conditioning Work of Tata small bus Spring Assembly (Front & Rear)-Inside MTC premises |
28 | Re –Conditioning of Jeep Leaf Spring Assembly-Inside MTC premises |
29 | Spring plate cutting-Inside MTC premises |
30 | Drilling Holes in Spring plate-Inside MTC premises |
31 | Condemned Spring Assembling (Front & Rear)-Inside MTC premises |
32 | Reconditioning work of TATA BSIV Rear Hub with Axle shaft (model no. LP 1613) (Rear Hub with Axle shaft [Crown side & Hub side] milling work)- Outside MTC premises |
33 | Reconditioning work of TATA Red bus Rear Hub with Axle shaft (model no. LP 1515) (Rear Hub with Axle shaft (Crown side & Hub side) milling work)- Outside MTC premises |
34 | Re-Conditioning of TATA BS IV A/C Head Housing –Threading & Welding- (model no. LP 1613) Outside MTC premises |
35 | Dismantling, Cleaning & Washing of DD unit (Leyland& TATA) -Inside MTC premises |
36 | Dismantling, Cleaning & Washing of Air dryer (Leyland& TATA)-Inside MTC premises |
37 | Dismantling, Cleaning & Washing of Dual Foot valve (Leyland & TATA)-Inside MTC premises |
38 | Dismantling, Cleaning & Washing of Relay valve (Leyland& TATA)-Inside MTC premises |
39 | Dismantling, Cleaning & Washing of Front brake chamber (Leyland& TATA)-Inside MTC premises |
40 | Dismantling, Cleaning & Washing of Rear brake chamber (Leyland& TATA)-Inside MTC premises |
41 | Dismantling, Cleaning & Washing of slack adjuster (Leyland& TATA)-Inside MTC premises |
42 | Dismantling & Assembling of Condemn Front Axle Assembly-Inside MTC premises |
43 | Dismantling & Assembling of Condemn Crown Assembly-Inside MTC premises |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail