Cooperative Sugar Mills Societies has published Tender For Fabrication And Erection Job Work. Submission Date for this Tender is 25-10-2023. Dismantling Work Tenders in palwal Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | M.S Pipe Line, Dismantling of pipe lines 1” to 3’’ |
2 | do- 4’’to 11’’ |
3 | do- 12” to 20” |
4 | do- 21’’ to48’’ |
5 | M.S Pipe Line, Erection of pipe line from 1” to 3” dia |
6 | do-4” to 11” |
7 | do-12to20 |
8 | do- 21 to 48 |
9 | Fabrication of pipe line from 12”above |
10 | Flanges and blind up to 48”, dismantling of flanges/blind |
11 | refitting of old/new flanges/blind |
12 | fabrication of flanges blind from M.S. plate up to 48” |
13 | Dismantling of Bends, reducersandnipples (up to 1’’ to 12’’), |
14 | Fabrication of Bends, reducersandnipples (up to 1’’ to 12’’), |
15 | Fitting of Bends, reducersandnipples (up to 1’’ to 12’’), |
16 | Dismantlingof Reducersand nipples (above 12’’) |
17 | Fabrication of Reducersand nipples (above 12’’) |
18 | Fitting of Reducersand nipples (above 12’’) |
19 | Dismantling of M.S. / G.l pipe Accessories (Tee, cross ,distance pieceup to 12’’) |
20 | Fabrication ofM.S. / G.l pipe Accessories (Tee, cross ,distance pieceup to 12’’) |
21 | Erectionof M.S. / G.l pipe Accessories (Tee, cross ,distance pieceup to 12’’ |
22 | Dismantling of M.S. / G.l pipeAccessories (Tee, cross, distance piece above 12’’) |
23 | Fabrication ofM.S. / G.l pipeAccessories (Tee, cross, distance piece above 12’’) |
24 | Erection of of M.S. / G.l pipeAccessories (Tee, cross, distance piece above 12’’) |
25 | Dismantling of M.S.tanks,/Vessels from M.S plates, angle M.S channel ‘I’ section etc ( up to 6 mm plate ) |
26 | FabricationofM.S.tanks,/Vessels from M.S plates, angle M.S channel ‘I’ section etc( up to 6 mm plate ) |
27 | Erection of M.S.tanks,/Vessels from M.S plates, angle M.S channel ‘I’ section etc ( up to 6 mm plate ) |
28 | Dismantling of M.S. plate jobs on boiler ducting boiler casing etc.( above 6mm plate) |
29 | Fabrication of M.S. plate jobs on boiler ducting boiler casing etc.(above 6mm plate) |
30 | Erectionof M.S. plate jobs on boiler ducting boiler casing etc.(above 6 mm plate) |
31 | Dismantling of railing |
32 | Fabrication of railing |
33 | Erectionof railing |
34 | Dismantlingof Valves1’’ to 6’’ |
35 | Dismantling of valves 7’’ to 12’’ |
36 | Dismantling of valves above 12’’ size |
37 | Fitting of valves 1’’ to6’’ |
38 | Fitting of valves 7’’ to 12’’ |
39 | Fitting ofvalves above 12’’ size |
40 | Dismantling of S.S Pipe Line all sizes |
41 | Erection of S.S Pipe Line all sizes |
42 | Dismantling of S.S.pipe Accessories(tee,cross, distance piece, nipples reducer and bend) up to 12 |
43 | Fabrication of S.S.pipe Accessories(tee,cross, distance piece, nipples reducer and bend) up to 12 |
44 | Erectionof S.S.pipe Accessories (tee,cross, distance piece, nipples reducer and bend) up to 12 |
45 | Patch Work on tankandpipe (M S plate cutting, fittingandwelding, 02 round welding) |
46 | Dismantling of cone, bigger size will be treated |
47 | Fabrication of cone, bigger size will be treated |
48 | Erection of cone, bigger size will be treated |
49 | Dismantling, FabricationandErection of gutter of any size by Required thickness. |
50 | Dismantling , fabricationanderection ofhoodof cutter ,chopper and leveler by 8/6 mm M.S. Plate |
51 | Dismantling , fabricationanderectionof M.S Boiler Chimney Base Dia= 3.5 M, Top Dia= 2.5m, Height=30-32m |
52 | Dismantlingof oldanderection of new I D Fan taper cone. |
53 | Dismantling , Fabricationanderection of old ducting fromI.D. fan inlet damper to I D Fan . |
54 | Dismantling , Fabricationanderection of flue gas ducting size 5’ x 5’ before ID fans |
55 | Dismantling, fabricationanderection of I.D.. fan casingfrom8 to 10mm M.S plate .Size 5’x5’ |
56 | Dismantling, fabricationanderection of I.D. Fan inlet damper |
57 | Dismantling ,fabricationandErectionof Bagasse elevator, bagasse carrierandRBC bottom and sideplate worn out portion |
58 | Dismantling , fabricationanderection of Boiler bagasse feeding Chute by 8/6 mm M.S. plate. |
59 | Dismantling, erection and fabrication of umbrella of Pan. |
60 | Dismantling, fabricationand erection of save all of Quad body. |
61 | Dismantling, FabricationandErection of save all of Pan. |
62 | Stair case( Dismantling, Fabrication & Erectionwith chequered plate/old plate and pipe line) |
63 | Dismantling and erection of pump up to 4’’ suction andup to 15 HP motor. |
64 | Dismantlinganderection of pump more than 4” suction and16 H.P motor or more |
65 | Dismantling of Ammoniaandgas coils |
66 | Fabricationof Ammoniaandgas coils |
67 | Erection of Ammoniaandgas coils |
68 | Dismantling ofnew plate form asper requirement from old M S plate 6mm to 8 mm thickness,up to 2 sqm. |
69 | Fabrication ofnew plate form asper requirement from old M S plate 6mm to 8 mm thickness,up to 2 sqm. |
70 | Erectionofnew plate form asper requirement from old M S plate 6mm to 8 mm thickness, up to 2 sqm. |
71 | Dismantling of new Plate form by M S/ chequered plate more than 2 sq.mtr |
72 | Fabrication of new Plate form by MSchequered plate more than 2 sq.mtr |
73 | Erectionof new Plate form by M S/chequered plate more than 2 sq.mtr |
74 | Dismantling of Crystallizer Coils |
75 | Fabrication of Crystallizer Coils |
76 | Erection of Crystallizer Coils |
77 | Dismantling of Old andworn out staging |
78 | Fabrication of Old andworn out staging |
79 | Erection of Old andworn out staging |
80 | Repairing of rubber seat of exhaust /vapor valveabove 16 “ |
81 | Dismantling , fabricationanderection of mill juice tray by8 mm/10 mm M.S plate |
82 | Dismantlingof existing cane carrier chute and fabricationanderection from 8 to 10 mm M.S plate |
83 | Repairing of steam jacket for sulphur furnace |
84 | Replacement of steam jacket of evaporator bodies |
85 | Strengthening of vapour line above 16” diaby innerandouter side ring of angle/pipes |
86 | Dismantling , fabricationanderection ofsupport of angle, pipe, channel at any equipment |
87 | Dismantlingof Hopper centre piece by 12 mmplate |
88 | Fabrication of Hopper centre piece by 12 mmplate |
89 | Erection of Hopper centre piece by 12 mmplate |
90 | Dismantlingof Hopper tray |
91 | Fabrication of Hopper tray |
92 | Erectionof Hopper tray |
93 | Sulphur Furnace cooler Dismantling, Fab. andErection work |
94 | Sulphur Furnace scrubber Dismantling , Fabrication andErectionwork |
95 | ‘B’ Vacuum crystallizer shell to be changed from10 MM M.S.plate |
96 | ‘C, Vacuum crystallizer shell to be changed from 10 MM M.S.plate |
97 | Strengthening of factory columns of various size by 10 mm M.S. Plate, angle, channels etc |
98 | Strengthening of factory beams of any size by M.S. plate, angle, channel,I. Section etc |
99 | Chipping, cleaning and painting of machinery columns and beams or staging of factory machinery. |
100 | Painting one coat with ready mixed paint in factory building M.S. columns (25 mtr approx. height. and 15-5 mtr height approx) and M.S trusses including rubbing down old(if required at site. All the bracing and purlins are included with this work. |
101 | Dismantling, Fabrication and erection of any sizefactory/Building, columns beams and trusses |
102 | Dismantling ,Fabrication and erection of worn out Water pipes, nozzles, drain box etc. |
103 | Dismantling, Fabrication and erection of worn out shell ofboth wet Scrubber |
104 | Dismantling, Fabrication and erection of worn out internal of both wet Scrubber |
105 | Dismantling, Fabrication and Erection of wornout flue gas ducting size 5’ x5’of both Wet Scrubber from damper to chimney |
106 | Replacement of worn out portion of supports of molasses tank roof. |
107 | Replacement of worn out portion ofroof of molasses tank. |
108 | Dismantling of Boiler exit flue gas damper. |
109 | Dismantling, and erection of Boiler I.D., F.D. Fan impeller. |
110 | Replacement of weak portion of molasses tank up to a height of10 mtr by 6 mm, 8 mm,10 mm, 12 mm plate etc. |
111 | Dismantlingandassembling of Air heater outlet ducting. |
112 | Replacement of worn out Air Heater tubes. |
113 | Dismantling, Fabrication, Erection of worn out both boilers blow down line from boiler to drain pit. |
114 | Dismantling, Fabrication, Erection of worn out of 5” long bend of feed water line header. |
115 | Removal of hanging old lagging and fixing of new glass wool, plastered by P.O.P or hasean cloth and covered with wire netting (murga jali) without material Up to 75 mm thickness |
116 | Replacement of juice heater partition plate in all respects. |
117 | Pan No.1 top cone replacement work. |
118 | Reconditioning of worn outJuice heaters 02 Nos.covers & grooves with respect to its top/bottommating outside covers |
119 | Dismantling of 6" dia C.I. cross. |
120 | Erection of 6" dia C.I. cross. |
121 | Dismantling , fabrication, erection of 10" x 20 " vacuum filter mud tray. |
122 | Dismantling of worn out body shell of Pan. |
123 | Fabricationanderection of body shell Pan. |
124 | Dismantling , Fabrication, Erection of 8" x 16 " vacuum filter mud tray. |
125 | Juice heaterboth covers to be dismantle and erection after machining work at both shafts. |
126 | Dismantling of worn out bottom and Fabrication and Erection of new bottom of H-Crystallizers. |
127 | Dismantling, Fabrication and Erection of M.S bend 12” to 20”. |
128 | Dismantling, Fabrication and Erection of M.S bend 21” to 40”. |
129 | Dismantling of new evaporator (quad) body S.S. tubes |
130 | Re-tubing of new evaporator (quad)body |
131 | Dismantling of VC-1100 m3 S.S. tubes |
132 | Re-tubing of VC-1100 m3 S.S. tubes |
133 | Increasingthe length of hydraulic grab fingers |
134 | Dismantling , fabrication, erection ofkicker drum with holder assembly |
135 | Dismantling, Erection Commission of Pan discharge valve of Pan. |
136 | Modification of mill Kush Kush Conveyor |
137 | Fabrication, Erection of new juice Dorr filtration system. |
138 | Dismantling, Fabrication, Erection offlocculating chamber topandbottom plate of Dorr. |
139 | Crystallizer spiral ribbon strip has to dismantle and again set right fitting and worn out armsandother related work also to be done. |
140 | Dismantling , Fabrication, Erection ofworn out runner of cane carrier/bagasse elevator/ RBC/MBC Cane Rake Elevator. |
141 | Dismantling, Fabrication and Erection of Agitator of vacuum filter. |
142 | Dismantling, Fabrication, Erection ofworn out portion of D.S.M. screen |
143 | Fabrication, erection ofI.D fan cone ring with flange |
144 | Erectionandcommissioning ofB- messecuite C/F machine including machine structure, leveling of machine and related work to be done in all respect of M/C |
145 | Dismantling of oldworn out and Fabrication, Erection ofnew juice sulphitor internal drum |
146 | Juice ring Fabrication by 6mm plate for mill rollers |
147 | Hinge type cover Fabrication at copper, levelerandcutter |
148 | Boilers No.26” live steam line from Boiler No.2 to main steam distributer to be modified |
149 | Boiler feed tank replacement |
150 | All Bagasse chute of both boilers to be modified |
151 | Rack and pinion to be fitted in MBC at Bagasse loading chute. |
152 | Labour supply ( per day 8 hr. basis)Turner/Machinist |
153 | Labour supply ( per day 8 hr. basis) Fitter |
154 | Labour supply ( per day 8 hr. basis)Welder |
155 | Labour supply ( per day 8 hr. basis)Helper |
156 | Labour supply ( per day 8 hr. basis) Khallasi |
157 | Dismantling, Fab. & Erection of tail end shaft, idler shaft and driving shaft with plumber blocks & driving unit etc for B.E, RBC & MBC. |
158 | Dismantling, Fab. & Erection of cane carrier & Cane Rake Elevator shaft. |