}

Maintenance Contract Of Instrumentation System And Operation & Comprehensive Maintenance Contract Of Flow Test Laboratory At Bhandup Complex For Three(03) Years, mumbai-Maharashtra

Municipal Copr Of Greater Mumbai-MCGM has published Maintenance Contract Of Instrumentation System And Operation & Comprehensive Maintenance Contract Of Flow Test Laboratory At Bhandup Complex For Three(03) Years. Submission Date for this Tender is 24-11-2023. Excavation Work Tenders in mumbai Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

40059854
Corrigendum : Maintenance Contract Of Instrumentation System And Operation & Comprehensive Maintenance Contract Of Flow Test Laboratory At Bhandup Complex For Three(03) Years
Open Tender
Indian
Maharashtra
mumbai
24-11-2023

Tender Details

Maintenance Contract Of Instrumentation System And Operation & Comprehensive Maintenance Contract Of Flow Test Laboratory At Bhandup Complex For Three ( 03 ) Years-2 Man Power 3 Nos. Engineers1st Year 3 Man Power12 Nos Helpers 1St Year 4 Vehicle Charges For 4 Vehicles1st Year 5 Cmc Smart 8 Nos Actuators Veravali Res 2. 1St Year 6 Cmc Of Automation Of 9 Tunnel & Middle Vaiterna 2Nd Year 7 Man Power 3 Nos Engineers2nd Year 8 Man Power12 Nos. Helpers2nd Year 9 Vehicle Chargesfor 4 Vehicles 2Nd Year 10 Cmc Smart Actuators 8 Nos Veravali Res 2. 2Nd Year 11 Cmc Of Automation Of 9 Tunnel & Middle Vaiterna 3Rdyear 12 Man Power 3 Nos Engineers3rdyear 13 Man Power12 Nos. Helpers3rdyear 14 Vehicle Chargesfor 4 Vehicles 3Rd Year 15 Cmc Smart Actuators 8 Nos Veravali Res 2. 3Rdyear 16 O&Cm Of Flow Test Lab 1St Year 17 Calibration Of Master Flow Meter At Flow Test Lab 18 O&Cm Of Flow Test Lab 2Nd Year 19 O&Cm Of Flow Test Lab 3Rd Year 20 Supply And Laying Of 3 C X 2.5 Mm2 Copper Armored Cable Fme 2018Item No. R2-Me-2-3-F 21 Supply And Laying Of Signal Cable 2 Pair, 1 Mm2 G. I.Wire Armoured, Individual Pair Screen, Overall Screened, Annealed Tinned Stranded Cu Conductor 22 Excavating The Trenches And Refilling, Reinstatement Of The Same After The Cable Is Laid In Approved Manner ( 750 Mm Deep, 600 Mm Wide ) , In All Types Of Soils 1 Cu. Mtr. = 2.2 Rmt.Fme 2018 Item No. R2-Me-2-8 23 Excavating The Trenches And Refilling The Same After The Cable Is Laid In Approved Manner ( Size Of Trench: 750 Mm Deep, 600 Mm Wide ) In Concrete / Masonary / Asphalt. 1 Cu. Mtr. = 2.2 Rmt. And Reinstatement.Fme 2018 Item No. R2-Me-2-9 24 Supply & Laying Of Double Wall Corrugated ( Dwc ) Pipes Of Hdpe For Underground Cable Protectionas Per Is 14930 Part Ii. ( 90 Mm Od / 76 Mm I.D. ) Fme 2018 Item No. R2-Me-2-22-D 25 Replacement Of Of Terminal Housings For Multi Path Ultrasonic Flow Meters

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-Oct-2023 Date Change Date 03-11-2023
2 01-Nov-2023 Extention of Dates Date 17-11-2023
3 16-Nov-2023 Extention of Dates for tender Date 24-11-2023

Key Value

Document Fees
Refer document
EMD
INR 491000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Maintenance contract of instrumentation system and Operation & Comprehensive maintenance contract of Flow test laboratory at Bhandup complex for three(03) years
Sl. No. Item Description
1CMC Of Automation of 9 tunnel & Middle Vaiterna 1st Year
2Man power 3 Nos. Engineers1st Year
3Man power12 Nos Helpers 1st Year
4Vehicle charges for 4 Vehicles1st Year
5CMC Smart 8 Nos Actuators Veravali Res 2. 1st year
6CMC Of Automation of 9 tunnel & Middle Vaiterna 2nd Year
7Man power 3 Nos Engineers2nd Year
8Man power12 Nos. Helpers2nd Year
9Vehicle chargesfor 4 Vehicles 2nd Year
10CMC Smart Actuators 8 Nos Veravali Res 2. 2nd year
11CMC Of Automation of 9 tunnel & Middle Vaiterna 3rdYear
12Man power 3 Nos Engineers3rdYear
13Man power12 Nos. Helpers3rdYear
14Vehicle chargesfor 4 Vehicles 3rd Year
15CMC Smart Actuators 8 Nos Veravali Res 2. 3rdyear
16O&CM of flow test lab 1st year
17Calibration of Master flow meter at Flow test lab
18O&CM of flow test lab 2nd year
19O&CM of flow test lab 3rd year
20Supply and Laying of 3 C X 2.5 mm2 Copper Armored Cable FME 2018Item No. R2-ME-2-3-f
21Supply and laying of Signal cable 2 Pair, 1 mm2 G. I.wire armoured,individual pair screen, overall screened,annealed tinned stranded Cu conductor
22Excavating the trenches and refilling,reinstatement of the same after the cable is laid in approved manner (750 mm deep, 600 mm wide),in all types of soils 1 Cu. Mtr. = 2.2 RMT.FME 2018 Item No. R2-ME-2-8
23Excavating the trenches and refilling the same after the cable is laid in approved manner (Size of trench: 750 mm deep, 600 mm wide) in concrete/ masonary / asphalt. 1 Cu. Mtr. = 2.2 RMT. And reinstatement.FME 2018 Item No. R2-ME-2-9
24Supply & Laying of double wall corrugated ( DWC) pipes of HDPE for underground cable protectionas per IS 14930 Part II. ( 90 mm OD / 76 mm I.D.) FME 2018 Item No. R2-ME-2-22-d
25Replacement of of terminal housings for multi path ultrasonic flow Meters
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail