}

Tender For Set Of Lavatory Modules Fully Assembled, rae Bareli-Uttar Pradesh

Modern Coach Factory-MCF has published Tender For Set Of Lavatory Modules Fully Assembled. Submission Date for this Tender is 26-10-2023. Railway Ancillaries Tenders in rae Bareli Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

39858192
Tender For Set Of Lavatory Modules Fully Assembled
Open Tender
Indian
Uttar Pradesh
rae Bareli
26-10-2023

Tender Details

Supply Of Set Of Lavatory Modules Fully Assembled, Lavatory Module For Lpcea ( Mdts133 Rev-05, Mdts118 Rev-01 & L.No.Md46271 Dt.12 / 11 / 03 Are Applicable ) As Per Drg.No. Mpllmlpcea Version-20 ( Note:-The Supply Of Lavatory Module Is To Be Done In Knockdown Condition Which Can Be Fully Assembled Inside The Coach ( No. Of Pieces Of Lavatory Module May Be Increased Up To 4 Maximum ) Which Can Be Fully Assembled Inside The Coach ) Bulk Supply To Be Made Only After Prototype Approval By Cde / Mcf . Packing Instruction - Pi111 Ver-1. [ Warranty Period: 78 Months After The Date Of Delivery ] , Set Of Lavatory Module For Lhb Ac2t & Ac3t Coaches ( Mdts-133 Rev-05, Mdts-118 Rev-01. Follow Drg. No. Sked-598 For Electrical Wiring, As Per Set-List No. Lavmod2t&3Tmcf Version- 07. ( Note:-The Supply Of Lavatory Module Is To Be Done In Knockdown Condition Which Can Be Fully Assembled Inside The Coach ( No. Of Pieces Of Lavatory Module May Be Increased Up To 4 Maximum ) And Height Of Lavatory Module May Be 2115+ / -10 Mm. For Achieving Height Of Lavatory Module Of 2115+ / -10 Mm, It Shall Be Minimize From Top Of The Lavatory Module Only With Reference To Applicable Lavatory Module Drawings. Bulk Supply To Be Made Only After Prototype Approval By Cde / Mcf ) . Packing Instruction:Pi111 Ver-1. [ Warranty Period: 78 Months After The Date Of Delivery ] , Frp Modular Toilet ( Pre Assembled ) For Lhb Slr Hog Coaches ( 31 Seater ) .Follow Colours Shade As Per L.No.Md46271 Dated:18.01.2021. As Per Drawing No.Mdts-214 Rev-Ii And Follow Drawing No. Mi007678 Alt- Nil For Location Of Pillow Blocks ( Note:-The Supply Of Lavatory Module Is To Be Done In Knockdown Condition Which Can Be Fully Assembled Inside The Coach ( No. Of Pieces Of Lavatory Module May Be Increased Up To 4 Maximum ) Which Can Be Fully Assembled Inside The Coach ) Bulk Supply To Be Made Only After Prototype Approval By Cde / Mcf.Packing Instruction - Pi111 Ver-1. [ Warranty Period: 78 Months After The Date Of Delivery ] , Set Of Frp Lavatory Module And Plumbing Items Mating For Lhb Ac -3 Tier Economy Coaches. Specification: Ed63001 Alt-A, Item 1 To 6 & 18 And Follow Clause 7, 9 To 12 Of Mdts 214 Rev-11. Packing Instruction:Pi111 Ver-1. ( Note:The Supply Of Lavatory Modules Is To Be Done In Knockdown Condition Which Can Be Fully Assembled Inside The Coach ( No. Of Pieces Of Lavatory Modules May Be Increased Up To 4 Maximum ) Bulk Supply To Be Made Only After Proptotype Approval By Cde / Mcf ) . [ Warranty Period: 78 Months After The Date Of Delivery ]

Key Value

Document Fees
Refer document
EMD
INR 5000000.0 /-
Tender Value
Refer document

BOQ Items

Sl. No. Item Description
1Set Of Lavatory Modules Fully Assembled
2LAVATORY MODULE FOR LPCEA (MDTS133 REV-05, MDTS118 REV-01 & L.NO.MD46271 DT.12/11/03 ARE APPLICABLE) as per Drg.No. MPLLMLPCEA Version-20 (Note:-THE SUPPLY OF LAVATORY MODULE IS TO BE DONE IN KNOCKDOWN CONDITION WHICH CAN BE FULLY ASSEMBLED INSIDE THE COACH (NO. OF PIECES OF LAVATORY MODULE MAY BE INCREASED UP TO 4 MAXIMUM)WHICH CAN BE FULLY ASSEMBLED INSIDE THE COACH) BULK SUPPLY TO BE MADE ONLY AFTER PROTOTYPE APPROVAL BY CDE/MCF . Packing Instruction - PI111 Ver-1. [ Warranty Period: 78 Months after the date of delivery ]
3 Set of Lavatory Module for LHB AC2T & AC3T Coaches(MDTS-133 REV-05, MDTS-118 REV-01. FOLLOW DRG. NO. SKED-598 FOR ELECTRICAL WIRING, AS PER SET-LIST NO. LAVMOD2T&3TMCF Version- 07. (Note:-THE SUPPLY OF LAVATORY MODULE IS TO BE DONE IN KNOCKDOWN CONDITION WHICH CAN BE FULLY ASSEMBLED INSIDE THE COACH (NO. OF PIECES OF LAVATORY MODULE MAY BE INCREASED UP TO 4 MAXIMUM) AND HEIGHT OF LAVATORY MODULE MAY BE 2115+/-10 MM. FOR ACHIEVING HEIGHT OF LAVATORY MODULE OF 2115+/-10 MM, IT SHALL BE MINIMIZE FROM TOP OF THE LAVATORY MODULE ONLY WITH REFERENCE TO APPLICABLE LAVATORY MODULE DRAWINGS. BULK SUPPLY TO BE MADE ONLY AFTER PROTOTYPE APPROVAL BY CDE/MCF) . Packing instruction:PI111 VER-1. [ Warranty Period: 78 Months after the date of delivery ]
4 FRP MODULAR TOILET (PRE ASSEMBLED) FOR LHB SLR HOG COACHES (31 SEATER).Follow colours shade as per L.No.MD46271 dated:18.01.2021. As per drawing No.MDTS-214 Rev-II and follow drawing No. MI007678 ALT- NIL for location of pillow blocks (Note:-THE SUPPLY OF LAVATORY MODULE IS TO BE DONE IN KNOCKDOWN CONDITION WHICH CAN BE FULLY ASSEMBLED INSIDE THE COACH (NO. OF PIECES OF LAVATORY MODULE MAY BE INCREASED UP TO 4 MAXIMUM) WHICH CAN BE FULLY ASSEMBLED INSIDE THE COACH) BULK SUPPLY TO BE MADE ONLY AFTER PROTOTYPE APPROVAL BY CDE/MCF.Packing Instruction - PI111 Ver-1. [ Warranty Period: 78 Months after the date of delivery ]
5 SET OF FRP LAVATORY MODULE AND PLUMBING ITEMS MATING FOR LHB AC -3 TIER ECONOMY COACHES. SPECIFICATION: ED63001 ALT-a, ITEM 1 TO 6 & 18 AND FOLLOW CLAUSE 7,9 TO 12 OF MDTS 214 REV-11. Packing instruction:PI111 VER-1. (Note:THE SUPPLY OF LAVATORY MODULES IS TO BE DONE IN KNOCKDOWN CONDITION WHICH CAN BE FULLY ASSEMBLED INSIDE THE COACH (nO. OF PIECES OF LAVATORY MODULES MAY BE INCREASED UP TO 4 MAXIMUM) BULK SUPPLY TO BE MADE ONLY AFTER PROPTOTYPE APPROVAL BY CDE/MCF). [ Warranty Period: 78 Months after the date of delivery ]
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail