SET OF FRP DOOR FRAME FOR LHB POWER CAR COACH., as per Drawing:MPLDFPLWLRRM VERSION 3, Packing Instruction: FRP CEILING SHEET/SIDE WALL PANELS/FRPCOMPONENT: SELF ADHESIVE BIODEGRADABLE PLASTIC LAMINATION SHEET TO BE PROVIDED ONEACH COMPONENT. PROJECTED METALLIC PARTS TO BE PROTECTED WITH PLASTIC/NYLON/FRPCAPS/PROPER WRAPPING OF BIODEGRADABLE BUBBLE SHEET FROM ALL THE SIDES. EACHCOMPONENT TO BE PACKED IN BIODEGRADABLE BUBBLE SHEET ALL AROUND WITH PROPERTAPPING & THEN TO BE PLACED IN CARDBOARD BOX FOLLOWED BY 3 NYLON STRIPS TIGHTENEDFROM BOTH SIDES. THEN COLLECTIVE PACKS OF COMPONENTS TO BE PACKED IN WOODENCAGE MADE FROM WOODEN STRIPS OF SIZE 100X20MM & GAP BETWEEN EACH STRIP SHOULDNOT BE MORE THAN 100MM.ON THE WOODEN CRATE BASE 3 WOODEN PEGS OFSIZE100X100MM(ALONG THE LENGTH) TO BE PROVIDED FOR EASE IN HANDLING WITH FORKLIFTER. ROOF CEILING (HAVING CURVED SURFACES) IN ADDITION TO ABOVE PACKING SHOULD BESTACKED ON A METALLIC FRAMES BEFORE PACKING IN THE WOODEN BOXES. ONE PACKAGESHOULD NOT CONTAIN MATERIAL BELONGING TO MORE THAN ONE COACH SET & GROUPINGSHOULD BE PREFERABLY OF SIMILAR SIZES. ALSO PACKING SHOULD HAVE INDICATION LIKE 1/4,2/4ETC. ( E.G. FOUR PACKINGS WILL MAKE ONE COACH SET) SO THAT ONE COMPLETE COACH SETCAN BE EASLY IDENTIFIED. THE MAXIMUM WEIGHT OF THE WOODEN CRATE SHOULD NOT BEMORE THAN 200 KGS. A LIST SHOULD BE PASTED ON EACH WOODEN CRATE SHOWING ORDER NO,PLNO, DESCRIPTION OF ITEM,DRG NO/SPEC NO/SET LIST NO. WITH VERSION,QTY,FIRMS NAME &ADDRESS,DATE OF DESPATCH ETC. [ Warranty Period: 84 Months after the date of delivery ]
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.