Mazagon Dock Limited has published Supply, Installation, Testing & Commissioning (Sitc) Of Access Control Systems (Gadgets/ Equipment) At Security Complex Building, Mdl, Mumbai. Submission Date for this Tender is 15-09-2023. Miscellaneous Finishes Tenders in mumbai Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 18-Aug-2023 | Corrigendum III | Date | 01-09-2023 |
2 | 29-Aug-2023 | Corrigendum IV | Financial Bid | 01-09-2023 |
3 | 01-Sep-2023 | Corrigendum V | Date | 15-09-2023 |
Sl. No. | Item Description |
1 | Supply and Installation of Automatic Electro HydraulicBollard System Set of 3 Bollards Zinc coated (inside out), red light mounted, K8 Rated (Refer Technical Specifications for details) Preferred Make:- GI/BGI/Gunnebo/Delta Scientific/TESCON |
2 | Testing, Commissioning of Automatic Electro HydraulicBollard System Set of 3 Bollards Zinc coated (inside out), red light mounted, K8 Rated (Refer Technical Specifications for details), along with necessary Civil Work as per OEM"s requirement |
3 | Supply and Installation of Boom Barrier upto 6 mtr, Electro - Mechanical Open/ Close,(Refer Technical Specifications for details) |
4 | Testing, Commissioning of Boom Barriers along with Necessary Civil Work as per OEM"s requirement |
5 | Supply and Installation of 3 mtr Mechanically operated Tyre-Killer (Refer Technical Specifications for details) |
6 | Testing , Commissioning of Tyre Killer along with Necessary Civil Work as per OEM"s requirement |
7 | Supply and Installation of X-ray Baggage Scanner systems, image acquisition, recording, storage and display systems (Refer Technical Specifications for details) |
8 | Testing & Commissioning ofX-ray Baggage Scanner systems, image acquisition, recording, storage and display systems (Refer Technical Specifications for details) |
9 | Supply and Installation of 9 ZONE DOOR FRAME METAL DETECTOR, Audio Visual alarm with alphanumeric LCD display (Refer Technical Specifications for details) |
10 | Testing & Commissioning of9 ZONE DOOR FRAME METAL DETECTOR, Audio Visual alarm with alphanumeric LCD display (Refer Technical Specifications for details) |
11 | Supply & Installation of Bi Directional Flap Barrier speed gates (Butterfly Wings) (Refer Technical Specifications for details) |
12 | Testing & Commissioning of Bi Directional Flap Barrier speed gates (Butterfly Wings) (Refer Technical Specifications for details) |
13 | Supply & Installation ofBiometric System -Face Recognition, Fingerprint, Contactless Card & PIN for providing multi factor authentication. (Refer Technical Specifications for details) |
14 | Testing & Commissioning ofBiometric System -Face Recognition, Fingerprint, Contactless Card & PIN for providing multi factor authentication. (Refer Technical Specifications for details) |
15 | Supply & Installation of Attendance Management, Reporting Software with Integration Capability (Refer Technical Specifications for details) |
16 | Testing & Commissioning of Attendance Management, Reporting Software with Integration Capability (Refer Technical Specifications for details) |
17 | Supply & Installation of Remote Monitoring & Management Software for Bollard, XBIS, DFMD, BOOM BARRIER (All to be integrated & Monitored remotely on Single Screen) (Refer Technical Specifications for details) |
18 | Testing & Commissioning of Remote Monitoring & Management Software for Bollard, XBIS, DFMD, BOOM BARRIER (All to be integrated & Monitored remotely on Single Screen) (Refer Technical Specifications for details) |
19 | Supply & Installation of Hot Standby Configuration. Primary Server 1Nos. Secondry Server 1Nos. With all registered licences of S/w, OS, DB, Backup S/W, Server health Management S/W, Anti-Virus S/W support. (Refer Technical Specifications for details) |
20 | Testing & Commissioning of Hot Standby Configuration. Primary Server 1Nos. Secondry Server 1Nos. With all registered licences of S/w, OS, DB, Backup S/W, Server health Management S/W, Anti-Virus S/W support. (Refer Technical Specifications for details) |
21 | Supply & Installation of Online UPS 10-KVA, along with battery for 30-min Backup(Refer Technical Specifications for details) |
22 | Testing & Commissioning of Online UPS 10-KVA, along with battery for 30-min Backup (Refer Technical Specifications for details) |
23 | Supply & Installation of Video Wall (Main Control Room) 3x3 configuration of 55" LED (Refer Technical Specifications for details) |
24 | Testing & Commissioning of Video Wall (Main Control Room) 3x3 configuration of 55" LED (Refer Technical Specifications for details) |
25 | Supply & Installation of FIXED BULLET WITH BUILT IN ON BOARD ANALYTICS CAMERA (Refer Technical Specifications for details) |
26 | Testing & Commissioning of FIXED BULLET WITH BUILT IN ON BOARD ANALYTICS CAMERA (Refer Technical Specifications for details) |
27 | Supply & Installation of IP Based 180 Degree Panoramic View Camera (Refer Technical Specifications for details) |
28 | Testing & Commissioning of IP Based 180 Degree Panoramic View Camera (Refer Technical Specifications for details) |
29 | Supply & Installation of PTZ, IP Based 30X Optical Zoom Speed Camera (Refer Technical Specifications for details) |
30 | Testing & Commissioning of PTZ, IP Based 30X Optical Zoom Speed Camera (Refer Technical Specifications for details) |
31 | Supply & Installation of Video Recording Server (Recording Parameters: 25 fps @ 2048x1536 (3 Megapixel)x 24 hours for 120 days) (Refer Technical Specifications for details) |
32 | Testing & Commissioning of Video Recording Server (Recording Parameters: 25 fps @ 2048x1536 (3 Megapixel)x 24 hours for 120 days) (Refer Technical Specifications for details) |
33 | Supply & Installation of Workstation (for client viewing) (Refer Technical Specifications for details) |
34 | Testing & Commissioning of Workstation (for client viewing) (Refer Technical Specifications for details) |
35 | Supply & Installation of Video Management & Recording Software Liscences (Refer Technical Specifications for details) |
36 | Testing & Commissioning of Video Management & Recording Software Liscences (Refer Technical Specifications for details) |
37 | Supply & Installation of Video Data Storage for Archiving - Fully Loaded with Enterprise Level HDD(Recording Parameters: 25 fps @ 2048x1536 (3 Megapixel)x 24 hours for 120 days) (Refer Technical Specifications for details) |
38 | Testing & Commissioning of Video Data Storage for Archiving - Fully Loaded with Enterprise Level HDD(Recording Parameters: 25 fps @ 2048x1536 (3 Megapixel)x 24 hours for 120 days) (Refer Technical Specifications for details) |
39 | Supply & Installation of 1 KVA Online UPS integrated Relay & battery (Refer Technical Specifications for details) |
40 | Testing & Commissioning of 1 KVA Online UPS integrated Relay & battery (Refer Technical Specifications for details) |
41 | Supply & Installation of8-port 10/100/1000T unmanaged switch with internal PSU (Refer Technical Specifications for details) |
42 | Testing & Commissioning of 8-port 10/100/1000T unmanaged switch with internal PSU (Refer Technical Specifications for details) |
43 | Supply & Installation of UTPCAT 6 cables (Refer Technical Specifications for details) |
44 | Testing & Commissioning of UTPCAT 6 cables (Refer Technical Specifications for details) |
45 | Supply & Installation of 6 core Single Mode OFC with HDPE Pipe (Refer Technical Specifications for details) |
46 | Testing & Commissioning of 6 core Single Mode OFC with HDPE Pipe (Refer Technical Specifications for details) |
47 | Supply & Installation of 8 port Fiber Switch stackable (Layer 3)(Refer Technical Specifications for details). |
48 | Testing & Commissioning of 8 port Fiber Switch stackable (Layer 3)(Refer Technical Specifications for details). |
49 | Supply & Installation of 8 port PoE Gigabit switch with additional 2 SFP ports (Layer 2) (Refer Technical Specifications for details) |
50 | Testing & Commissioning of 8 port PoE Gigabit switch with additional 2 SFP ports (Layer 2) (Refer Technical Specifications for details) |
51 | Supply & Installation of Media Converter - 10/100Mbps to 100Base-Fx Media Converter (Single Mode 20Kms) (Refer Technical Specifications for details) |
52 | Testing & Commissioning of Media Converter - 10/100Mbps to 100Base-Fx Media Converter (Single Mode 20Kms) (Refer Technical Specifications for details) |
53 | Supply & Installation of 12 port LIU Fully loaded with panels, adapters , patch cords & pigtails and other connectorisation (Refer Technical Specifications for details) |
54 | Testing & Commissioning of12 port LIU Fully loaded with panels, adapters , patch cords & pigtails and other connectorisation (Refer Technical Specifications for details) |
55 | Supply & Installation of Network Rack 12U (Refer Technical Specifications for details) |
56 | Testing & Commissioning of Network Rack 12U (Refer Technical Specifications for details) |
57 | Supply & Installation ofJUNCTION BOX METALLIC ALL WEATHER SIZE MIN 9"x9" (Refer Technical Specifications for details) |
58 | Testing & Commissioning ofJUNCTION BOX METALLIC ALL WEATHER SIZE MIN 9"x9" (Refer Technical Specifications for details) |
59 | Supply & Installation of JUNCTION BOX METALLIC ALL WEATHER SIZE MIN 24"x24"x18".(POWDER COATED) (Refer Technical Specifications for details) |
60 | Testing & Commissioning of JUNCTION BOX METALLIC ALL WEATHER SIZE MIN 24"x24"x18".(POWDER COATED) (Refer Technical Specifications for details) |
61 | Supply & Installation of PVC Piping Conduit (Refer Technical Specifications for details) |
62 | Testing & Commissioning of PVC Piping Conduit (Refer Technical Specifications for details) |
63 | Supply & Installation of 3 core 2.5 sq mm Power cable(Refer Technical Specifications for details) |
64 | Testing & Commissioning of 3 core 2.5 sq mm Power cable(Refer Technical Specifications for details) |
65 | Supply & Installation of Rack - Rack servers & switches (Refer Technical Specifications for details) |
66 | Testing & Commissioning of Rack - Rack servers & switches (Refer Technical Specifications for details) |
67 | Road cutting & Refilling– Tar/Concrete Road (Services) & Digging & Laying as per system requirement (Refer Technical Specifications for details) |
68 | 1st Year Comprehensive AMC of Gate entrance system which includes - Bollards , sliding gate , tyre killer and boom barrier. 02 Years after DLP |
69 | 2nd Year Comprehensive AMC of Gate entrance system which includes - Bollards , sliding gate , tyre killer and boom barrier. 02 Years after DLP |
70 | 1st Year Comprehensive AMC of scanning system which includes -XBIS AND DFMD.02 Years after DLP |
71 | 2nd Year Comprehensive AMC of scanning system which includes -XBIS AND DFMD.02 Years after DLP |
72 | 1st Year Comprehensive AMC of Access control system which includes -Flap Barriers, Biometric System, Attendance Management system.02 Years after DLP |
73 | 2nd Year Comprehensive AMC of Access control system which includes -Flap Barriers, Biometric System, Attendance Management system.02 Years after DLP |
74 | 1st Year Comprehensive AMC of CCTV which includes - Camera, server , switches , monitor and software.02 Years after DLP |
75 | 2nd Year Comprehensive AMC of CCTV which includes - Camera, server , switches , monitor and software.02 Years after DLP |
76 | Motarised double leaf Sliding Gate |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail