Mtps-Ii – 1X600mw – Boiler Maintenance – Loading, Transporting And Unloading Of Esp Field Material From Uppur Super Critical Thermal Power Project To Mtps-Ii Site, Dismantling Of Damaged Esp Field, Modification, Erection, Testing And Commissioning Of 1 No, Salem-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Mtps-Ii – 1X600mw – Boiler Maintenance – Loading, Transporting And Unloading Of Esp Field Material From Uppur Super Critical Thermal Power Project To Mtps-Ii Site, Dismantling Of Damaged Esp Field, Modification, Erection, Testing And Commissioning Of 1 No. Submission Date for this Tender is 17-07-2023. Dismantling Work Tenders in Salem Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

38581067
Mtps-Ii – 1X600mw – Boiler Maintenance – Loading, Transporting And Unloading Of Esp Field Material From Uppur Super Critical Thermal Power Project To Mtps-Ii Site, Dismantling Of Damaged Esp Field, Modification, Erection, Testing And Commissioning Of 1 No
Open Tender
Indian
Tamil Nadu
Salem
17-07-2023

Tender Details

Mtps-Ii – 1X600mw – Boiler Maintenance – Loading, Transporting And Unloading Of Esp Field Material From Uppur Super Critical Thermal Power Project To Mtps-Ii Site, Dismantling Of Damaged Esp Field, Modification, Erection, Testing And Commissioning Of 1 No Esp C12 Field Complete As Per The Site Condition

Key Value

Document Fees
Refer document
EMD
INR 49000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: MTPS-II – 1X600MW – Boiler Maintenance – Loading, Transporting and unloading of ESP field material from UPPUR super critical thermal power project to MTPS-II site, Dismantling of damaged ESP field, modification, Erection, Testing and commissioning of 1 No ESP C12 field complete as per the site condition. .
Sl. No. Item Description
1A) Transporting ESP Internals from USCTPP to MTPS-II site. Leading, Lifting, Shifting, Loading, Transporting and Unloading of 1.5 Nos ESP fields (all related auxiliaries) with supporting frames from Uppur/STPP to MTPS-II / Mettur Dam.
2B) Dismantling the Damaged ESP Internals. Opening ofmanhole doors in 23 mtr & 13.5mtrelevation and closing all the manhole doors after dismanling,cutting and removal ofField and internals including hire charges T&P required, consumables and all labour charges etc.,
3Mechanical cleaning and water washingin ESPpass fields, including collecting plates,emitting electrodes rapping mechanism, structuresand closing all the manhole doors including consumables, lead, lift, T&P etc.,
4Removal of damaged / eroded/wornout ESP collecting electrodes (plates) of sizes of 750mm width X 15000 mm Long from ESP fields. The electrodes are to be disconnected from shock bars by cutting the shock bar bolts, nuts, scaffolding are to be erected at required elevation for lifting the 15 m long electrode to the top of the ESP roof. Derrick arrangements are to be erected with 4 Nos of collecting electrodes
5Shifting of eroded / damaged ESP collecting electrodes from 30 mtr elevation to ESP ‘0’ mtr elevation and cutting it into 2 to 3 pieces and loading it to the vechicle and to central stores
6Cutting and removing the damagedERM, CRM shafts, emitting Electrodes, CRM & ERM ladder & supporting structures, plain bearings , etc from ESP field as per direction of Engg in charge.
7Shifting the eroded ESP shock bar guide plate & baffle plate from ESP 14 mtr to 0 mtr and loading it to vehicle, transporting and devolute at Central Stores/MTPS-II.
8Removal of damaged collecting electrode supporting frames, lifting the ESP roof, shifting from 30mtr level to "0" mtr level.
9Shifting of eroded / damaged ERM, CRM shafts, emitting Electrodes, ERM ladder, etc from to ESP ‘0’ mtr elevation and cutting it into 2 to 3 pieces and loading it to the vehicle and to central stores.
10Removal of inner and outer casing longitudinal ESP roof plate by gas cutting or using welding electrodes,insulation wool mattress and Fixing, welding the same outer and inner casing longitudinal roof plate including cost of consumables and T & P and cost of welding electrodes and renewal or putting back the same insulation wool mattress after completion of work.
11Erection of completed ESP field internals along with its accessories by transporting,lead,lifting (to the top of ESP roof at 25M elevation),fit-up levelling, inserting the 15M long collecting electrodeinto the ESP casing chamber oneby one with special tool & placing at the required place/ row and connectingthe bottom with shock bars by huck-bolt arrangements, tightening with special tools,erection of rapping mechanism, suspension & support frames for collecting & emitting electrodes, CERM & ERMmechanism, support insulators,insulation, alignment, completed welding of all supports,frames and modification of the BHEL make ESP internals such as collecting and emitting electroed supporting and suspension frame, ERM &CRM, ERM& CRM driving mechanism,Insulatorsetc., and as per direction of site Engineer all charges including cost of specialT &P "s and consumables.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail