Construction Of Design Supply & Erection Pf Auction Shed (Spider Peb System) On G. F. Of Shree A. P. M. C. Kodinar At Kodinar Taluka Dist. Gir Somnath- Excavation For Foundation Up To1.5 M Depth Including Sorting Out And Staking Of Useful Materials And Di, Kodinar-Gujarat
TDR : 38485639
Tender Notice
BOQ
Expired
Kodinar
Gujarat
Construction Of Design Supply & Erection Pf Auction Shed (Spider Peb System) On G. F. Of Shree A. P. M. C. Kodinar At Kodinar Taluka Dist. Gir Somnath- Excavation For Foundation Up To1.5 M Depth Including Sorting Out And Staking Of Useful Materials And Di
Excavation for Foundation up to1.5 m Depth including sorting out and Staking of useful materials and Disposing of the excavated stuff up to 50 m. lead (C) Hard rock (Page no.67 - item code-04001C/0
243.0000
2
Excavation for Foundation for depth of 1.5 m to 3.0 m Depth including sorting out and Staking of useful materials and Disposing of the excavated stuff up to 50 m. lead (C) Hard murrum (Page no.67 - item code-04002C/0
243.0000
3
Filling in Foundation and Plinth with brick bats / chhara in layers af 20 cm. Thicknes including Watering, Ramming and consolidating etc. complete(Page No.69-item code-4009A/0
33.0000
4
Providing and laying controlled cement concrete M-150 and curing etc.complete including the cost of formwork but excluding cost of reinforcement for R.C.C. work on (a) Foundation Footing P.C.C. (R.A.-1)
24.0000
5
Filling available excavated earth [excluding rock in trenches plinth, sides of foundations etc.] in layer not exceeding 20 cm. In depth consolidating each deposited layer by ramming and watering.(Page No.52-itemcode-4006/4.12)
389.0000
6
Providing and laying controlled cement concrete M-250 and curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (A) foundations footings base of columns and mass concrete work (Page no.78-itemcode-05025A/5.8.3)
89.0000
7
Providing and laying controlled cement concrete M-250 exposed work with curing complete including cost of formwork but excluding the cost of reinforcement for reinforced concrete work in (B) Columns, & Pedestal upto plinth.(R.A.)
17.0000
8
Providing TMT Bar FE 500/500D steel reinforcement for R.C.C. work including bending binding & placing in position complete up to floor two level (Page no.-75-item code-05014C/5.4.11)
8700.0000
9
Providing, supplying & Erection of spider PEB system etc. complete.
We takes all possible care for accurate & authentic tender information, however Users