E-Tender Forerection, Dismantling Transportation Of Poles, Distribution Transformers, Ht / Lt Lines And Other Allied Extension Works For A Period Of One Year From The Date Of Commencement Of Work In Burgur Section Of Anthiyur Sub Division In Bhavani Division. 1 Excavationofpolepitup To27 ( 8.0 M ) Pole By Using Jcb Or Manual 2 Excavationofpolepit Above8mtr Pole Psc / Rcc / Rsj Pole By Using Jcb Or Manual 3 Excavation Of Staypit4.5 To 5Depthby Using Jcb Or Manual 4 Erection Of Psc / Rccpoles / Metalpolesupto 8.00M. ( 27 ) By Using Jcb Or Manual 5 Dismantling Of Psc / Rcc / Metalpolesupto 8.00M. ( 27 ) By Using Jcb Or Manual 6 Erection Of Psc / Rcc / Metalpoles Above 8.0M. ( 27 ) By Using Jcb Or Maual 7 Dismantling Of Psc / Rccpoles / Metalpoles Above 8.0M. ( 27 ) By Using Jcb Or Maual 8 Erectionofstaysetcomplete 9 Fixing Of HtV Crossarms ( All Types ) / Channelcrossarms / Guardingcrossarms 10 Dismantling Of HtV Crossarms ( All Types ) / Channelcrossarms / Guardingcrossarms 11 Fixing Of Lt 3 Phasecrossarms 12 Dismantling Of Lt 3 Phasecrossarms 13 Fixing Of Lt Single Phase Cross Arms 14 Dismantling Of Lt Single Phase Cross Arms 15 Fixing Of Ht / Lttifittings 16 Dismantling Of Ht / Lttifittings 17 Fixingofaluminium Knob 18 Dismantling Of Aluminium Knob 19 Fixingofhtpininsulators 22 Kv 20 Dismantling Ofhtpininsulators 22 Kv 21 Fixingofht22 Kvstraindisc. 22 Dismantling Ofht22 Kvstraindisc. 23 Fixingofltpininsulator 24 Dismantlingofltpininsulator 25 Fixingofltshackle 26 Dismantlingofltshackle 27 Paving Of Conductor , Stringing Etcof Acsr 7 / 4.09 Mmraccoon Conductor 28 Dismanting Of Acsr 7 / 4.09 Mmraccoon Conductor 29 Paving Of Conductor , Stringing Etc Acsr 7 / 3.35Mm / Aaac 3.15Mm Rabbitconductor 30 Dismanting Of Acsr 7 / 3.35Mm / Aaac 3.15Mm Rabbitconductor 31 Paving Of Conductor , Stringing Etcofacsr7 / 2.59Mm / Aaac 2.50 Mm Weasel And Acsr7 / 2.11 Mm Conductor 32 Dismanting Of Acsr7 / 2.59Mm / Aaac 2.50 Mm Weasel And Acsr7 / 2.11 Mm Conductor 33 Sleeveconcreting Including Materials ( Cement 1 / 2 Bag + River Sand / M-Sand And Blue Metals And Watering ) 34 Earthing Of Pole With Coil Earthing Including Burying Looping And Binding 35 Replacement Of Earthing Of Pole With Coil Earthing Including Burying Looping Binding 36 Transporting Of Poles / Materials / Conductor And Other Materials Below 8.0 Km ( Plains ) Only One Direction Ie No Return Charge ( Excluding Loading And Unloading Charges ) 37 Above 8.0 Kms For Additional Km ( Irrespective Of Weight In Tonnage And Single Direction Ie No Return Charge ) 38 Transportingofpolesfromroadsite Topolepitincludingloadingandunloading Ofpoles By Using Jcb Or Manualup To 100 M 39 Transportingofpolesfromroadsite Topolepitincludingloadingandunloading Ofpoles By Using Jcb Or Manual Beyond 100 M 40 Loadingofpolesupto8.0 Mtr / 27 41 Un Loadingofpolesupto8.0 Mtr / 27 42 Loadingofpolesabove 8.0 M Pole 43 Un Loadingofpolesabove 8.0 M Pole 44 Loading Of Materials 45 Un Loading Of Materials 46 Leading And Stacking Of Materials 47 Loadingorunloadingoftransformer Upto100 Kvaforeach 48 Loadingorunloadingoftransformer Above 100 Kva Andupto 200 Kvaforeach 49 Erectionofnewtransformerall Capacity ( Wiht Jumbering ) 50 Drilling Of Hole In Channel Only 3 / 4 &1 51 Cutting Of Angle 52 Re-Sagging Of Acsr 7 / 3.35 Mm / Aaac 3.15 Mm Rabbit Conductor 53 Re-Sagging Acsr 7 / 2.59 Mm / Aaac 2.50 Mm Weasel And Acsr 7 / 2.11 Mm Conductor 54 Releasing Ofacsr / Aaac Conductor From Condutor Drum And Coiling 7 / 2.59, Aaac 7 / 2.50, Acsr 7 / 3.35, 7 / 3.15 Mm 55 Erection Of Street Light Including Fixure Fitting 56 Fixingof New Cfl / Led Lamp Fittings 57 Releasingofsingle Phaseserviceand Re-Fixing. 58 Releasingof3 Phaseserviceand ( Upto 50 Hp ) Re-Fixing. 59 I ) Cutting Of Coconut Leaves ( Per Tree ) 60 Ii ) Clearing Of Branches Of Trees ( Per Tree ) 61 Erection Of Transformer Strucure Complete In All Respects With Wiring, Earthing, Fixing Of Open Typefuse Units, Ht / Lt Las And Jumpeing 3 NoS. Earth Pits With Coller Including Painting Of Metal Parts, Structurepoles, Fixing Of Top Channel, Seating Channel, Belting Angle Including Concreting. ( Except Erection Of Transfomer 62 Erection Of Transformer, Strucure Complete In All Respects With Wiring, Earthing, Fixing Of Open Typefuse Units, Ht / Lt Las And Jumpeing 3 NoS. Earth Pits With Coller Including Painting Of Metal Parts, Structurepoles, Fixing Of Top Channel, Seating Channel, Belting Angle Excluding Concreting. ( Except Erection Of Transfomer 63 Erection Ofsingle Pole Strucure Complete In All Respects With Wiring, Earthing, Fixing Of Open Typefuse Units, Ht / Lt Las And Jumpeing 3 NoS. Earth Pits With Coller Including Painting Of Metal Parts, Structurepoles, Fixing Of Tapping Channel, Transformer Bed Structureincluding Concreting. ( Except Erection Of Transfomer ) 64 Erection Ofsingle Pole Strucure Complete In All Respects With Wiring, Earthing, Fixing Of Open Typefuse Units, Ht / Lt Las And Jumpeing 3 NoS. Earth Pits With Coller Including Painting Of Metal Parts, Structurepoles, Fixing Of Tapping Channel, Transformer Bed Structureexcluding Concreting. ( Except Erection Of Transfomer ) 65 Erection Of D.P.Structure With Ab Switch, Top Channel, Cross Bracing, Earthing, Painting, Providing Stay Excluding Concreing