E-Tender Forerection, Dismantling Transportation Of Poles, Distribution Transformers, Ht/Lt Lines And Other Allied Extension Works For A Period Of One Year From The Date Of Commencement Of Work In Burgur Section Of Anthiyur Sub Division In Bhavani Divisio, Erode-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published E-Tender Forerection, Dismantling Transportation Of Poles, Distribution Transformers, Ht/Lt Lines And Other Allied Extension Works For A Period Of One Year From The Date Of Commencement Of Work In Burgur Section Of Anthiyur Sub Division In Bhavani Divisio. Submission Date for this Tender is 14-07-2023. Dismantling Work Tenders in Erode Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

38466660
E-Tender Forerection, Dismantling Transportation Of Poles, Distribution Transformers, Ht/Lt Lines And Other Allied Extension Works For A Period Of One Year From The Date Of Commencement Of Work In Burgur Section Of Anthiyur Sub Division In Bhavani Divisio
Open Tender
Indian
Tamil Nadu
Erode
14-07-2023

Tender Details

E-Tender Forerection, Dismantling Transportation Of Poles, Distribution Transformers, Ht / Lt Lines And Other Allied Extension Works For A Period Of One Year From The Date Of Commencement Of Work In Burgur Section Of Anthiyur Sub Division In Bhavani Division. 1 Excavationofpolepitup To27 ( 8.0 M ) Pole By Using Jcb Or Manual 2 Excavationofpolepit Above8mtr Pole Psc / Rcc / Rsj Pole By Using Jcb Or Manual 3 Excavation Of Staypit4.5 To 5Depthby Using Jcb Or Manual 4 Erection Of Psc / Rccpoles / Metalpolesupto 8.00M. ( 27 ) By Using Jcb Or Manual 5 Dismantling Of Psc / Rcc / Metalpolesupto 8.00M. ( 27 ) By Using Jcb Or Manual 6 Erection Of Psc / Rcc / Metalpoles Above 8.0M. ( 27 ) By Using Jcb Or Maual 7 Dismantling Of Psc / Rccpoles / Metalpoles Above 8.0M. ( 27 ) By Using Jcb Or Maual 8 Erectionofstaysetcomplete 9 Fixing Of HtV Crossarms ( All Types ) / Channelcrossarms / Guardingcrossarms 10 Dismantling Of HtV Crossarms ( All Types ) / Channelcrossarms / Guardingcrossarms 11 Fixing Of Lt 3 Phasecrossarms 12 Dismantling Of Lt 3 Phasecrossarms 13 Fixing Of Lt Single Phase Cross Arms 14 Dismantling Of Lt Single Phase Cross Arms 15 Fixing Of Ht / Lttifittings 16 Dismantling Of Ht / Lttifittings 17 Fixingofaluminium Knob 18 Dismantling Of Aluminium Knob 19 Fixingofhtpininsulators 22 Kv 20 Dismantling Ofhtpininsulators 22 Kv 21 Fixingofht22 Kvstraindisc. 22 Dismantling Ofht22 Kvstraindisc. 23 Fixingofltpininsulator 24 Dismantlingofltpininsulator 25 Fixingofltshackle 26 Dismantlingofltshackle 27 Paving Of Conductor , Stringing Etcof Acsr 7 / 4.09 Mmraccoon Conductor 28 Dismanting Of Acsr 7 / 4.09 Mmraccoon Conductor 29 Paving Of Conductor , Stringing Etc Acsr 7 / 3.35Mm / Aaac 3.15Mm Rabbitconductor 30 Dismanting Of Acsr 7 / 3.35Mm / Aaac 3.15Mm Rabbitconductor 31 Paving Of Conductor , Stringing Etcofacsr7 / 2.59Mm / Aaac 2.50 Mm Weasel And Acsr7 / 2.11 Mm Conductor 32 Dismanting Of Acsr7 / 2.59Mm / Aaac 2.50 Mm Weasel And Acsr7 / 2.11 Mm Conductor 33 Sleeveconcreting Including Materials ( Cement 1 / 2 Bag + River Sand / M-Sand And Blue Metals And Watering ) 34 Earthing Of Pole With Coil Earthing Including Burying Looping And Binding 35 Replacement Of Earthing Of Pole With Coil Earthing Including Burying Looping Binding 36 Transporting Of Poles / Materials / Conductor And Other Materials Below 8.0 Km ( Plains ) Only One Direction Ie No Return Charge ( Excluding Loading And Unloading Charges ) 37 Above 8.0 Kms For Additional Km ( Irrespective Of Weight In Tonnage And Single Direction Ie No Return Charge ) 38 Transportingofpolesfromroadsite Topolepitincludingloadingandunloading Ofpoles By Using Jcb Or Manualup To 100 M 39 Transportingofpolesfromroadsite Topolepitincludingloadingandunloading Ofpoles By Using Jcb Or Manual Beyond 100 M 40 Loadingofpolesupto8.0 Mtr / 27 41 Un Loadingofpolesupto8.0 Mtr / 27 42 Loadingofpolesabove 8.0 M Pole 43 Un Loadingofpolesabove 8.0 M Pole 44 Loading Of Materials 45 Un Loading Of Materials 46 Leading And Stacking Of Materials 47 Loadingorunloadingoftransformer Upto100 Kvaforeach 48 Loadingorunloadingoftransformer Above 100 Kva Andupto 200 Kvaforeach 49 Erectionofnewtransformerall Capacity ( Wiht Jumbering ) 50 Drilling Of Hole In Channel Only 3 / 4 &1 51 Cutting Of Angle 52 Re-Sagging Of Acsr 7 / 3.35 Mm / Aaac 3.15 Mm Rabbit Conductor 53 Re-Sagging Acsr 7 / 2.59 Mm / Aaac 2.50 Mm Weasel And Acsr 7 / 2.11 Mm Conductor 54 Releasing Ofacsr / Aaac Conductor From Condutor Drum And Coiling 7 / 2.59, Aaac 7 / 2.50, Acsr 7 / 3.35, 7 / 3.15 Mm 55 Erection Of Street Light Including Fixure Fitting 56 Fixingof New Cfl / Led Lamp Fittings 57 Releasingofsingle Phaseserviceand Re-Fixing. 58 Releasingof3 Phaseserviceand ( Upto 50 Hp ) Re-Fixing. 59 I ) Cutting Of Coconut Leaves ( Per Tree ) 60 Ii ) Clearing Of Branches Of Trees ( Per Tree ) 61 Erection Of Transformer Strucure Complete In All Respects With Wiring, Earthing, Fixing Of Open Typefuse Units, Ht / Lt Las And Jumpeing 3 NoS. Earth Pits With Coller Including Painting Of Metal Parts, Structurepoles, Fixing Of Top Channel, Seating Channel, Belting Angle Including Concreting. ( Except Erection Of Transfomer 62 Erection Of Transformer, Strucure Complete In All Respects With Wiring, Earthing, Fixing Of Open Typefuse Units, Ht / Lt Las And Jumpeing 3 NoS. Earth Pits With Coller Including Painting Of Metal Parts, Structurepoles, Fixing Of Top Channel, Seating Channel, Belting Angle Excluding Concreting. ( Except Erection Of Transfomer 63 Erection Ofsingle Pole Strucure Complete In All Respects With Wiring, Earthing, Fixing Of Open Typefuse Units, Ht / Lt Las And Jumpeing 3 NoS. Earth Pits With Coller Including Painting Of Metal Parts, Structurepoles, Fixing Of Tapping Channel, Transformer Bed Structureincluding Concreting. ( Except Erection Of Transfomer ) 64 Erection Ofsingle Pole Strucure Complete In All Respects With Wiring, Earthing, Fixing Of Open Typefuse Units, Ht / Lt Las And Jumpeing 3 NoS. Earth Pits With Coller Including Painting Of Metal Parts, Structurepoles, Fixing Of Tapping Channel, Transformer Bed Structureexcluding Concreting. ( Except Erection Of Transfomer ) 65 Erection Of D.P.Structure With Ab Switch, Top Channel, Cross Bracing, Earthing, Painting, Providing Stay Excluding Concreing

Key Value

Document Fees
Refer document
EMD
INR 25000.0 /-
Tender Value
INR 25 Lakhs /-

BOQ Items

E-tender forErection, dismantling transportation of poles, distribution Transformers, HT/LT lines and other allied extension works for a period of one year from the date of commencement of work in Burgur section of Anthiyur sub division in Bhavani Division.
Sl. No. Item Description
1Excavationofpolepitup to27" (8.0 m) Pole by using JCB or manual
2Excavationofpolepit above8mtr pole PSC/RCC/RSJ pole by using JCB or manual
3Excavation of Staypit4.5" to 5"depthby using JCB or manual
4Erection of PSC/RCCpoles/Metalpolesupto 8.00m. (27") by using JCB or manual
5Dismantling of PSC/RCC /Metalpolesupto 8.00m. (27") by using JCB or manual
6Erection of PSC/RCC /Metalpoles above 8.0m.(27") by using JCB or maual
7Dismantling of PSC/RCCpoles/Metalpoles above 8.0m.(27") by using JCB or maual
8Erectionofstaysetcomplete
9Fixing of HT"V" crossarms(all types) / channelcrossarms/guardingCrossarms
10Dismantling of HT"V" crossarms(all types) / channelcrossarms/guardingCrossarms
11Fixing of LT 3 phasecrossarms
12Dismantling of LT 3 phasecrossarms
13Fixing of LT Single phase cross arms
14Dismantling of LT Single phase cross arms
15Fixing of HT/LTTIFittings
16Dismantling of HT/LTTIFittings
17FixingofAluminium Knob
18Dismantling of Aluminium Knob
19FixingofHTpinInsulators 22 KV
20Dismantling ofHTpinInsulators 22 KV
21FixingofHT22 KVstraindisc.
22Dismantling ofHT22 KVstraindisc.
23FixingofLTpinInsulator
24DismantlingofLTpinInsulator
25FixingofLTshackle
26DismantlingofLTshackle
27Paving of conductor , stringing etcof ACSR 7/4.09 mmRaccoon conductor
28Dismanting of ACSR 7/4.09 mmRaccoon conductor
29Paving of conductor , stringing etc ACSR 7/3.35mm /AAAC 3.15mm Rabbitconductor
30Dismanting of ACSR 7/3.35mm /AAAC 3.15mm Rabbitconductor
31Paving of conductor , stringing etcofACSR7/2.59mm /AAAC 2.50 mm weasel and ACSR7/2.11 mm conductor
32Dismanting of ACSR7/2.59mm /AAAC 2.50 mm weasel and ACSR7/2.11 mm conductor
33Sleeveconcreting including materials (Cement 1/2 bag + river sand/M-sand and Blue metals and watering)
34Earthing of pole with coil earthing including burying looping and binding
35Replacement of earthing of pole with coil earthing including burying looping binding
36Transporting of poles / materials / conductor and other materials below 8.0 km (plains) only one direction ie no return charge (excluding loading and unloading charges )
37Above 8.0 kms for additional km (Irrespective of weight in tonnage and single direction ie no return charge)
38Transportingofpolesfromroadsite topolepitincludingloadingandunloading ofpoles by using JCB or manualup to 100 m
39Transportingofpolesfromroadsite topolepitincludingloadingandunloading ofpoles by using JCB or manual beyond 100 m
40Loadingofpolesupto8.0 mtr / 27"
41Un Loadingofpolesupto8.0 mtr / 27"
42Loadingofpolesabove 8.0 m pole
43Un Loadingofpolesabove 8.0 m pole
44loading of materials
45Un loading of materials
46Leading and stacking of materials
47LoadingorunloadingofTransformer upto100 KVAforeach
48LoadingorunloadingofTransformer above 100 KVA andupto 200 KVAforeach
49ErectionofNewTransformerall capacity (wiht jumbering)
50Drilling of hole in Channel only 3/4" &1"
51Cutting of angle
52Re-sagging of ACSR 7/3.35 mm / AAAC 3.15 mm Rabbit conductor
53Re-sagging ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm conductor
54Releasing ofACSR /AAAC conductor from condutor drum and coiling 7/2.59, AAAC 7/2.50, ACSR 7/3.35, 7/3.15 mm
55Erection of Street light including fixure fitting
56Fixingof new CFL / LED lamp fittings
57Releasingofsingle phaseserviceand re-fixing.
58Releasingof3 phaseserviceand(upto 50 HP)re-fixing.
59i)Cutting of coconut leaves (per tree)
60ii)Clearing of branches of Trees (per Tree)
61Erection of Transformer strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of top channel, seating channel, belting angle including concreting. (Except erection of Transfomer
62Erection of Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of top channel, seating channel, belting angle excluding concreting. (Except erection of Transfomer
63Erection ofSingle pole strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel, transformer bed structureincluding concreting. (Except erection of Transfomer)
64Erection ofSingle pole strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel, transformer bed structureexcluding concreting. (Except erection of Transfomer)
65Erection of D.P.Structure with AB switch, top channel, cross bracing, earthing, painting, providing stay excluding concreing
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail