}

Tender For Boiler Retubing Work, bazpur-Uttarakhand

Bazpur Cooperative Suger Factory Limited has published Tender For Boiler Retubing Work. Submission Date for this Tender is 12-06-2023. Dismantling Work Tenders in bazpur Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

38029379
Tender For Boiler Retubing Work
Open Tender
Indian
Uttarakhand
Bazpur
12-06-2023

Tender Details

Boiler Retubing Work Boiler Retubing Work In Sugar Mill. , Replacement Of 44.45Mm. Od. X 3.66 Mm.Thick Super Heater Coil Of Wil Boiler Cap. 30 Ton/ Hr. The Work Schedule- Dismantling, Fabrication And Erection With Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Dismantling, Fabrication And Erection Of Seamless Nipple Of 44.45 Mm. Od. X 4.06 Mm. Thick. X 150 Mm. Long (With Supply) Of W.I.L./Taxmaco/Vkw Boiler. , Dismantling, Fabrication And Erection Of Seamless Nipple Of 76.2 Mm. Od. X 4.06 Mm. Thick. X 150 Mm. Long (With Supply) Of Boiler. , Dismantling, Fabrication And Erection Of Seamless Nipple Of 82.5 Mm. Od. X 3.66 Mm.Thick. X 150 Mm. Long Of Vkw. Boiler.(A) With Supply , (B) Without Supply , Dismantling, Fabrication And Fitting Of 3” Nb Schedule 40Circulation Tube Of 30 Tph Texmaco Boiler With Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler’S Uttrakhand. , Rate Of Per Welding Joint Of Boiler Tubes(A) 44.5Mm.Od , (B) 63.5Mm.Od , (C) 70.0Mm.Od , (D) 76.2Mm.Od , (D) 82.5Mm.Od , Replacement Of Old & Worn Out Fins Type Economizer Coils Of Wil Boiler 30Ton/Hr By New Supplied Coilsas Per Side Requirement Complete Ibr Norms. , Supply Of New Fins Type Economizer Coils Of Wil Boiler As Per Drawing. , Replacement Of 63.5Mm. Od X 3.66Mm.Thick Drum To Drum Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 70Mm. Od X 4.06Mm.Thick Screen Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 70Mm. Od X 4.06Mm.Thick Side Wall Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 70Mm. Od X 4.06Mm.Thick Roof Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 76.2Mm. Od X 4.06Mm.Thick Relief Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 76.2Mm. Od X 4.06Mm.Thick Circulation Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 76.2Mm. Od X 4.06Mm.Thick Front Bank Tube Of Taxmaco Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Supply Of10 Nb X Sch- 100 X 8 Meter Long Front Header With Niples Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 82.5Mm. Od X 3.66Mm.Thick Tube Of Vkw Boiler Cap.13.5Ton/Hr., 12 To 15Meter Long Each. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Supply Of Worn Out/Week 101.6Mm. O.D. X 4.06Mm. Thick X 2Meter Long Gilled Type Economizer Tube, Bend With Ms Fins & Both Side Flange Of Vkw Boiler Cap.13.5Ton/Hr. Theinclude Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , -Do- Without Supply , Supply Of New Steam Bend 101.6Mm. Od X 4.06Mm.Thick For Vkw Economizer According To Ibr Norms. , Supply Offlange 101.6Mm. Od X 4.06Mm.Thick For Vkw Economizer According To Ibr Norms. , Dismantling, Febrication & Erection Of Steam Line According To Ibr Norms , Dismantling, Febrication & Erection Of Bend Of Steam Line According To Ibr Norms , Dismantling, Febrication & Erection Of Flange Of Steam Line According As Per Ibr Norms , Replacement Of 76.2Mm. Od X 4.06Mm.Thick Riser Tube Of Taxmaco Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 82.5Mm. Od X 3.66Mm.Thick Curculation Tube Of Taxmaco Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand.

Key Value

Document Fees
INR 354 /-
EMD
INR 30000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail