Department of Cooperation has published Tender For Contract For Dismantling Fabrication Erection Job Work. Submission Date for this Tender is 01-06-2023. Dismantling Work Tenders in batala Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-May-2023 | Corrigendum01 | Date | 01-06-2023 |
Sl. No. | Item Description |
1 | MS pipeline up to 12" dia |
2 | a) Dismantling |
3 | c) Erection |
4 | MS Pipe line above 12" dia including vapour/exhaust pipe |
5 | a) Dismantling |
6 | b) Fabrication |
7 | c) Erection |
8 | Seamless pipeline up to 12" dia |
9 | a) Dismantling |
10 | c) Erection |
11 | Seamless bend upto 12" dia |
12 | a) Dismantling |
13 | c) Erection |
14 | Cross reducer, tee, Nipple upto 12" dia |
15 | a) Dismantling |
16 | b) Fabrication |
17 | c) Erection |
18 | Cross, reducer, tee Nipple above 12" dia |
19 | a) Dismantling |
20 | b) Fabrication |
21 | c) Erection |
22 | A) Valve upto 12" dia |
23 | a) Dismantling |
24 | b) Erection |
25 | B) Valve above 12" dia |
26 | a) Dismantling |
27 | c) Erection |
28 | Bend upto 12" dia |
29 | a) Dismantling |
30 | b) Fabrication |
31 | c) Erection |
32 | Bend above 12" dia |
33 | a) Dismantling |
34 | b) Fabrication |
35 | c) Erection |
36 | Flange of all size |
37 | a) Dismantling |
38 | b) Fabrication |
39 | c) Erection |
40 | Square & round tanks with flat bottom of any size |
41 | a) Dismantling |
42 | b) Fabrication |
43 | c) Erection |
44 | Round tanks withconical tank of any size |
45 | a) Dismantling |
46 | b) Fabrication |
47 | c) Erection |
48 | Cone/Saucer of any size |
49 | a) Dismantling |
50 | b) Fabrication |
51 | c) Erection |
52 | Gutters of Ms plate of any size |
53 | a) Dismantling |
54 | b) Fabrication |
55 | c) Erection |
56 | Roof gutter with 3mm thick plate & 4ft wide |
57 | a) Dismantling |
58 | b) Fabrication |
59 | b) Erection |
60 | A) Platform of any size (only Plate) |
61 | a) Dismantling |
62 | b) Fabrication& Erection |
63 | B) MS Structure |
64 | a) Dismantling |
65 | b) Fabrication & Erection |
66 | Fabrication of Ladder/Stair Case from Angle/Channel/Flat/Pipe Plate |
67 | Trouses coloumn, beam related to roof |
68 | a) Dismantling |
69 | b) Fabrication |
70 | c) Erection |
71 | Purlin |
72 | a) Dismantling |
73 | b) Fabrication |
74 | c) Erection |
75 | M.S Patch work Max. upto 20 sq.ft at individual station |
76 | Mill House |
77 | Dismantling, Fabrication and Erection of cane cutter hood. |
78 | Replacement of Runner flat of CC, RC, Intercarrier, BE, RBC Sugar, Seed elevator chain & cross carrier. |
79 | a) Dismantling |
80 | b) Fitting of New |
81 | Replacement of Angle/Channel CC, RC,Intercarrier, BE,RBC Sugar seed elevator chain & cross carrier. |
82 | a) Dismantling |
83 | b) Fitting of New |
84 | Replacement side plate of CC, RC, BE, RBC, Hopper & Cross carr |
85 | Replacement of bottom trough Hopper, BE, RC. RBC, cross carr |
86 | Dismantling, fabrication and Erection Juice tray of mill |
87 | Dismantling, Fabrication and Erection of Donnelly chute of mills |
88 | DSM screen juice recevining top& Bottom tray |
89 | a) Dismantling |
90 | b) Fabrication |
91 | Dismantling, Fabrication & Erection of any bed of motor, Pump & gear box |
92 | a) Below 50 HP |
93 | b) Above 50 HP |
94 | Replacement of Rack-Carrier Boot |
95 | Replacement of Cutter/ID Fan motor |
96 | Boiler |
97 | Replacement of worn out ducting |
98 | Replacement of worn out casing |
99 | a) ID Fan |
100 | b) FD Fan |
101 | Repair of worn out casing |
102 | a) ID Fan |
103 | b) FD Fan |
104 | Replacement of Boiler Fans |
105 | a) ID |
106 | b) FD |
107 | c) SA |
108 | Dismantling, Fabrication & Erection of Fan Plumber Block bed. Including fitting & leveling of plumber block |
109 | a) ID |
110 | b) FD |
111 | c) SA |
112 | Boiler refractory M.S plate for side wall |
113 | a) Dismantling |
114 | b) Fitting of new/Old |
115 | Dismantling, Fabrication & Erection of Boiler ID Fan |
116 | Dismantling, Repair & Erection of boiler ID fan Damper |
117 | Dismantling, fabrication and Erection of Worn out portion of wet scrubber |
118 | Replacement of worn out furnacedoor. |
119 | Boiling House |
120 | Replacement of worn out raw juice/sulphited juice pump. Strainer |
121 | Repair of worn out weight juice receiving tank |
122 | Fabrication & Erection of man hole with blind cover |
123 | Pan/Evaporator |
124 | Replacement of worn out of saveall of Evaporator bodies (including inner shell, outer shell, top plate & impeller |
125 | Replacement of worn out of saveall of Evaporator bodies (including inner shell, outer shell, top plate & impeller |
126 | Replacement of Impeller of pan & quad |
127 | Replacement of Top/bottom taper plate of pans & quad |
128 | Patching/Repair work inside boiling houe equipment like pan, quard & clarifier |
129 | Dismantling, fab.& Erect. Of vapour pipe bends |
130 | a) Full Bend |
131 | b) Half Bend |
132 | Replacement of Umbrella of Pans |
133 | Fabrication& Erection of steam coils for syrup and molasses tank |
134 | Replacement of Umbrella for Evaporator station |
135 | Dismantling Fabrication & Erection of J-pipe for saveall of any body |
136 | Dismantling Fabrication & Erection of Pan/Quad body |
137 | Dismantling Fabrication & Erection of condensate bottle of any size |
138 | Fab. & Erection of Side Glass for Pan/Quad |
139 | Dismantling fabrication & erection of condensate water receiving pocket for cylindria of pan and quad. |
140 | Replacement of brass/S.S Tubes of juice heater/vapour line juice heater |
141 | a) Dismantling |
142 | b) Fitting |
143 | Replacement of brass/S.S Tubes of quard/vapour cell & Pan Station |
144 | a) Dismantling |
145 | b) Fitting |
146 | c) Cutting of brass/S.S Tube any size |
147 | Juice Heater |
148 | a) Replacement of JH partition plate |
149 | b) Replacement of worn out groove out partition plate |
150 | Repair of Tube plate of vapour line juice heater |
151 | Clarifier |
152 | Replacement of coils in dorr |
153 | Oliver Filter |
154 | Dismantling, Fabrication & Erection of Bagacillo cyclone |
155 | Replacement of worn out bagacillo pipeline made out from GI Plain sheet |
156 | Dismantling, fabrication & erection of agitator of OC filter |
157 | M.S Screw conveyor |
158 | a) Dismantling |
159 | b) Fabrication |
160 | c) Erection |
161 | Bagacillo Screen |
162 | a) Dismantling |
163 | b) Replacement of New Screen & Erection |
164 | c) Fabrication Fram |
165 | Sulphur Furnace |
166 | Replacement of cooler of sulphur burners |
167 | Replacement of Sulphur cooler burner pipeline |
168 | Dismantling, Fabrication & Erection of Sulphur burner melter for sulphur furnance |
169 | M.S Scrubber of sulphur furnace |
170 | a) Dismantling |
171 | b) Fabrication |
172 | c) Erection along with connection valves and pipes etc |
173 | Dismantling, Fabrication & Erection of Sulphur Furnance Chamber |
174 | Crystallizer central shaft with ribbon |
175 | a) Dismantling |
176 | b) Fabrication |
177 | c) Erection |
178 | Crystallizer Arm |
179 | a) Dismantling |
180 | b) Fabrication |
181 | c) Erection |
182 | M.S ribbon in Crystallizer |
183 | a) Dismantling |
184 | b) Fabrication |
185 | c) Erection |
186 | Dismantling, Fabricaion & erection of central tube shaft with cooling coil for water cooled crystallizer 40 tonns capacity. |
187 | Worn box for crystallizer |
188 | a) Dismantling |
189 | b) Fabrication |
190 | c) Erection |
191 | Dismantling and refitting of big gear of crystallizer |
192 | Replacement of bottom plate of crystallizer |
193 | Dismantling, Fabrication & Erection of seed crystallizer shaft |
194 | Centrifugal station |
195 | Replacement of hopper trough |
196 | Impeller of Hot/cold air blower |
197 | a) Dismantling |
198 | b) Fabrication |
199 | c) Erection with drive system complete |
200 | M S casing of Hot/cold air blower |
201 | a) Dismantling |
202 | b) Fabrication |
203 | c) Erection |
204 | Fabrication of M.S bucket for sugar/Seed Elevator. |
205 | Magma/Melter/pugmill arms |
206 | a) Dismantling |
207 | b) Fabrication |
208 | c) Erection |
209 | Dismantling, Fabrication, Erection of MS Chute for Grader |
210 | Spray pond |
211 | Dismantling, fabrication and erecton of S.S Cluster including S.S Plate/Flangs/Reducer & increasing length by 1 meter |
212 | Replacement of foot valve of spray pump |
213 | Dismantling |
214 | Erection |
215 | Dismantling, Fabrication & Erection of spray pump strainer |
216 | Dismantling & Erection of Flow meter |
217 | Molasses Tank |
218 | Repair of roof and some round portion (shell) of molasses tank |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail