| 1 | MS pipeline up to 12\" dia |
| 2 | a) Dismantling |
| 3 | c) Erection |
| 4 | MS Pipe line above 12\" dia including vapour/exhaust pipe |
| 5 | a) Dismantling |
| 6 | b) Fabrication |
| 7 | c) Erection |
| 8 | Seamless pipeline up to 12\" dia |
| 9 | a) Dismantling |
| 10 | c) Erection |
| 11 | Seamless bend upto 12\" dia |
| 12 | a) Dismantling |
| 13 | c) Erection |
| 14 | Cross reducer, tee, Nipple upto 12\" dia |
| 15 | a) Dismantling |
| 16 | b) Fabrication |
| 17 | c) Erection |
| 18 | Cross, reducer, tee Nipple above 12\" dia |
| 19 | a) Dismantling |
| 20 | b) Fabrication |
| 21 | c) Erection |
| 22 | A) Valve upto 12\" dia |
| 23 | a) Dismantling |
| 24 | b) Erection |
| 25 | B) Valve above 12\" dia |
| 26 | a) Dismantling |
| 27 | c) Erection |
| 28 | Bend upto 12\" dia |
| 29 | a) Dismantling |
| 30 | b) Fabrication |
| 31 | c) Erection |
| 32 | Bend above 12\" dia |
| 33 | a) Dismantling |
| 34 | b) Fabrication |
| 35 | c) Erection |
| 36 | Flange of all size |
| 37 | a) Dismantling |
| 38 | b) Fabrication |
| 39 | c) Erection |
| 40 | Square & round tanks with flat bottom of any size |
| 41 | a) Dismantling |
| 42 | b) Fabrication |
| 43 | c) Erection |
| 44 | Round tanks withconical tank of any size |
| 45 | a) Dismantling |
| 46 | b) Fabrication |
| 47 | c) Erection |
| 48 | Cone/Saucer of any size |
| 49 | a) Dismantling |
| 50 | b) Fabrication |
| 51 | c) Erection |
| 52 | Gutters of Ms plate of any size |
| 53 | a) Dismantling |
| 54 | b) Fabrication |
| 55 | c) Erection |
| 56 | Roof gutter with 3mm thick plate & 4ft wide |
| 57 | a) Dismantling |
| 58 | b) Fabrication |
| 59 | b) Erection |
| 60 | A) Platform of any size (only Plate) |
| 61 | a) Dismantling |
| 62 | b) Fabrication& Erection |
| 63 | B) MS Structure |
| 64 | a) Dismantling |
| 65 | b) Fabrication & Erection |
| 66 | Fabrication of Ladder/Stair Case from Angle/Channel/Flat/Pipe Plate |
| 67 | Trouses coloumn, beam related to roof |
| 68 | a) Dismantling |
| 69 | b) Fabrication |
| 70 | c) Erection |
| 71 | Purlin |
| 72 | a) Dismantling |
| 73 | b) Fabrication |
| 74 | c) Erection |
| 75 | M.S Patch work Max. upto 20 sq.ft at individual station |
| 76 | Mill House |
| 77 | Dismantling, Fabrication and Erection of cane cutter hood. |
| 78 | Replacement of Runner flat of CC, RC, Intercarrier, BE, RBC Sugar, Seed elevator chain & cross carrier. |
| 79 | a) Dismantling |
| 80 | b) Fitting of New |
| 81 | Replacement of Angle/Channel CC, RC,Intercarrier, BE,RBC Sugar seed elevator chain & cross carrier. |
| 82 | a) Dismantling |
| 83 | b) Fitting of New |
| 84 | Replacement side plate of CC, RC, BE, RBC, Hopper & Cross carr |
| 85 | Replacement of bottom trough Hopper, BE, RC. RBC, cross carr |
| 86 | Dismantling, fabrication and Erection Juice tray of mill |
| 87 | Dismantling, Fabrication and Erection of Donnelly chute of mills |
| 88 | DSM screen juice recevining top& Bottom tray |
| 89 | a) Dismantling |
| 90 | b) Fabrication |
| 91 | Dismantling, Fabrication & Erection of any bed of motor, Pump & gear box |
| 92 | a) Below 50 HP |
| 93 | b) Above 50 HP |
| 94 | Replacement of Rack-Carrier Boot |
| 95 | Replacement of Cutter/ID Fan motor |
| 96 | Boiler |
| 97 | Replacement of worn out ducting |
| 98 | Replacement of worn out casing |
| 99 | a) ID Fan |
| 100 | b) FD Fan |
| 101 | Repair of worn out casing |
| 102 | a) ID Fan |
| 103 | b) FD Fan |
| 104 | Replacement of Boiler Fans |
| 105 | a) ID |
| 106 | b) FD |
| 107 | c) SA |
| 108 | Dismantling, Fabrication & Erection of Fan Plumber Block bed. Including fitting & leveling of plumber block |
| 109 | a) ID |
| 110 | b) FD |
| 111 | c) SA |
| 112 | Boiler refractory M.S plate for side wall |
| 113 | a) Dismantling |
| 114 | b) Fitting of new/Old |
| 115 | Dismantling, Fabrication & Erection of Boiler ID Fan |
| 116 | Dismantling, Repair & Erection of boiler ID fan Damper |
| 117 | Dismantling, fabrication and Erection of Worn out portion of wet scrubber |
| 118 | Replacement of worn out furnacedoor. |
| 119 | Boiling House |
| 120 | Replacement of worn out raw juice/sulphited juice pump. Strainer |
| 121 | Repair of worn out weight juice receiving tank |
| 122 | Fabrication & Erection of man hole with blind cover |
| 123 | Pan/Evaporator |
| 124 | Replacement of worn out of saveall of Evaporator bodies (including inner shell, outer shell, top plate & impeller |
| 125 | Replacement of worn out of saveall of Evaporator bodies (including inner shell, outer shell, top plate & impeller |
| 126 | Replacement of Impeller of pan & quad |
| 127 | Replacement of Top/bottom taper plate of pans & quad |
| 128 | Patching/Repair work inside boiling houe equipment like pan, quard & clarifier |
| 129 | Dismantling, fab.& Erect. Of vapour pipe bends |
| 130 | a) Full Bend |
| 131 | b) Half Bend |
| 132 | Replacement of Umbrella of Pans |
| 133 | Fabrication& Erection of steam coils for syrup and molasses tank |
| 134 | Replacement of Umbrella for Evaporator station |
| 135 | Dismantling Fabrication & Erection of J-pipe for saveall of any body |
| 136 | Dismantling Fabrication & Erection of Pan/Quad body |
| 137 | Dismantling Fabrication & Erection of condensate bottle of any size |
| 138 | Fab. & Erection of Side Glass for Pan/Quad |
| 139 | Dismantling fabrication & erection of condensate water receiving pocket for cylindria of pan and quad. |
| 140 | Replacement of brass/S.S Tubes of juice heater/vapour line juice heater |
| 141 | a) Dismantling |
| 142 | b) Fitting |
| 143 | Replacement of brass/S.S Tubes of quard/vapour cell & Pan Station |
| 144 | a) Dismantling |
| 145 | b) Fitting |
| 146 | c) Cutting of brass/S.S Tube any size |
| 147 | Juice Heater |
| 148 | a) Replacement of JH partition plate |
| 149 | b) Replacement of worn out groove out partition plate |
| 150 | Repair of Tube plate of vapour line juice heater |
| 151 | Clarifier |
| 152 | Replacement of coils in dorr |
| 153 | Oliver Filter |
| 154 | Dismantling, Fabrication & Erection of Bagacillo cyclone |
| 155 | Replacement of worn out bagacillo pipeline made out from GI Plain sheet |
| 156 | Dismantling, fabrication & erection of agitator of OC filter |
| 157 | M.S Screw conveyor |
| 158 | a) Dismantling |
| 159 | b) Fabrication |
| 160 | c) Erection |
| 161 | Bagacillo Screen |
| 162 | a) Dismantling |
| 163 | b) Replacement of New Screen & Erection |
| 164 | c) Fabrication Fram |
| 165 | Sulphur Furnace |
| 166 | Replacement of cooler of sulphur burners |
| 167 | Replacement of Sulphur cooler burner pipeline |
| 168 | Dismantling, Fabrication & Erection of Sulphur burner melter for sulphur furnance |
| 169 | M.S Scrubber of sulphur furnace |
| 170 | a) Dismantling |
| 171 | b) Fabrication |
| 172 | c) Erection along with connection valves and pipes etc |
| 173 | Dismantling, Fabrication & Erection of Sulphur Furnance Chamber |
| 174 | Crystallizer central shaft with ribbon |
| 175 | a) Dismantling |
| 176 | b) Fabrication |
| 177 | c) Erection |
| 178 | Crystallizer Arm |
| 179 | a) Dismantling |
| 180 | b) Fabrication |
| 181 | c) Erection |
| 182 | M.S ribbon in Crystallizer |
| 183 | a) Dismantling |
| 184 | b) Fabrication |
| 185 | c) Erection |
| 186 | Dismantling, Fabricaion & erection of central tube shaft with cooling coil for water cooled crystallizer 40 tonns capacity. |
| 187 | Worn box for crystallizer |
| 188 | a) Dismantling |
| 189 | b) Fabrication |
| 190 | c) Erection |
| 191 | Dismantling and refitting of big gear of crystallizer |
| 192 | Replacement of bottom plate of crystallizer |
| 193 | Dismantling, Fabrication & Erection of seed crystallizer shaft |
| 194 | Centrifugal station |
| 195 | Replacement of hopper trough |
| 196 | Impeller of Hot/cold air blower |
| 197 | a) Dismantling |
| 198 | b) Fabrication |
| 199 | c) Erection with drive system complete |
| 200 | M S casing of Hot/cold air blower |
| 201 | a) Dismantling |
| 202 | b) Fabrication |
| 203 | c) Erection |
| 204 | Fabrication of M.S bucket for sugar/Seed Elevator. |
| 205 | Magma/Melter/pugmill arms |
| 206 | a) Dismantling |
| 207 | b) Fabrication |
| 208 | c) Erection |
| 209 | Dismantling, Fabrication, Erection of MS Chute for Grader |
| 210 | Spray pond |
| 211 | Dismantling, fabrication and erecton of S.S Cluster including S.S Plate/Flangs/Reducer & increasing length by 1 meter |
| 212 | Replacement of foot valve of spray pump |
| 213 | Dismantling |
| 214 | Erection |
| 215 | Dismantling, Fabrication & Erection of spray pump strainer |
| 216 | Dismantling & Erection of Flow meter |
| 217 | Molasses Tank |
| 218 | Repair of roof and some round portion (shell) of molasses tank |