Tender For Boiler Tube Fabrication Erection And Dismantling Work For Season 2023-24, bareilly-Uttar Pradesh

Kisan Sahkari Chini Mills Limited-KHERI has published Tender For Boiler Tube Fabrication Erection And Dismantling Work For Season 2023-24. Submission Date for this Tender is 31-05-2023. Dismantling Work Tenders in bareilly Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

37858910
Tender For Boiler Tube Fabrication Erection And Dismantling Work For Season 2023-24
Open Tender
Indian
Uttar Pradesh
bareilly
31-05-2023

Tender Details

Tender For Boiler Tube Fabrication Erection And Dismantling Work For Season 2023-24-2 Dismantling, Fabrication & Erection Of 70 / 76.2Mm Od Screen Tube 21Kg / Cm.Sq. Working Pressure Buckau Wolf Make 20 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 3 Dismantling, Fabrication & Erection Of 76.2Mm Od Riser Tubes / Down Comer Tube Of 21Kg / Cm.Sq. Working Pressure Buckau Wolf Make 20 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 4 Dismantling, Fabrication & Erection Of 63.5Mm Od Drum To Drum Tube Of 21Kg / Cm.Sq. Working Pressure Buckau Wolf Make 20 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 5 Dismantling, Fabrication & Erection Of 70.0Mm Od Roof Tube ( Drum To Front Header ) Of 21Kg / Cm.Sq. Working Pressure Buckau Wolf Make 20 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 6 Dismantling, Fabrication & Erection Of Coil Type Economisersize Of Coil 44.45Mm Od X Length 37 Mtr. Buckau Wolf Make 20 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 7 Fabrication & Erection Of Coil Type Economisersize Of Coil 50.80Mm Od X Length 37Mtr. Buckau Wolf Make 20 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 8 Dismantling, Fabrication & Erection Of 63.5Mm Od Side Wall Tube Of 21Kg / Cm.Sq. Working Pressure 30 Tph Capacity Thermax Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 9 Dismantling & Erection Of 63.5Mm Od Of Air Heater Tubes Of 30Tph Capacity Thermax Make Boiler. 10 Dismantling, Fabrication & Erection Of 63.5Mm Od Screen Tube 21Kg / Cm.Sq. Working Pressure Thermax Make 30 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 11 Dismantling, Fabrication & Erection Of 63.5Mm Od Drum To Front Header 21Kg / Cm.Sq. Working Pressure Thermax Make 30 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 12 Dismantling, Fabrication & Erection Of 63.5Mm Od Top Header To Front Header 21Kg / Cm.Sq. Working Pressure Thermax Make 30 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 13 Dismantling, Fabrication & Erection Of 76.2Mm Od Riser Tube 21Kg / Cm.Sq. Working Pressure Thermax Make 30 Tph Capacity Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 14 Dismantling, Fabrication & Erection Of 44.45Mm Od X 4.06Mm Thick. Of Super Heater Coil With Proper Support Of 21Kg / Cm.Sq. Working Pressure 30 Tph Capacity Thermax Boiler With Hydraulic Testing At 36Kg / Cm. Sq.Pressure 15 Dismantling, Fabrication & Erection Of 3Schedule 40 Feed Water Pipeline. 16 Dismantling, Fabrication & Erection Of 3Schedule 40 Feed Water Pipe Line Bend. 17 Dismantling, Fabrication & Erection Of 4Schedule 40 Steam Line. 18 Dismantling, Fabrication & Erection Of 4Schedule 40 Steam Line Bend. 19 Dismantling, Fabrication & Erection Of 5Schedule 40 Feed Water Pipe Line / Steam Line. 20 Dismantling, Fabrication & Erection Of 5Schedule 40 Feed Water Pipe Line / Steam Line Bend. 21 Dismantling, Fabrication & Erection Of 6Schedule 40 Steam Line. 22 Dismantling & Erection Of Steam Line Schedule 40 Bend Size 6 23 Dismantling, Fabrication & Erection Of 8 Schedule 40 Steam Line. 24 Dismantling & Erection Of Steam Line Schedule 40 Bend Size 8 25 Dismantling, Fabrication & Erection Of Steam Line Nipple / Reducer Size 6 26 Dismantling, Fabrication & Erection Of Steam Line Nipple / Reducer Size 8

Key Value

Document Fees
INR 300 /-
EMD
INR 20000.0 /-
Tender Value
INR 10 Lakhs /-

BOQ Items

Name of Work: BOILER TUBE FABRICATION ERRECTION AND DISMENTLING JOB WORK FOR THE SEASON 2023-24
Sl. No. Item Description
1BOILER TUBE FABRICATION ERRECTION AND DISMENTLING JOBWORK
2Dismantling, Fabrication & Erection of 70/76.2mm OD Screen Tube 21kg/cm.sq. Working pressure buckau wolf make 20 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
3Dismantling, Fabrication & Erection of 76.2mm OD Riser Tubes/Down Comer Tube of 21kg/cm.sq. Working pressure buckau wolf make 20 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
4Dismantling, Fabrication & Erection of 63.5mm OD Drum to Drum Tube of 21kg/cm.sq. Working pressure buckau wolf make 20 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
5Dismantling, Fabrication & Erection of 70.0mm OD Roof Tube (Drum to Front Header) of 21kg/cm.sq. Working pressure buckau wolf make 20 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
6Dismantling, Fabrication & Erection of Coil type Economisersize of Coil 44.45mm OD X Length 37 mtr. buckau wolf make 20 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
7Fabrication & Erection of Coil type Economisersize of Coil 50.80mm OD X Length 37mtr. buckau wolf make 20 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
8Dismantling, Fabrication & Erection of 63.5mm OD Side Wall tube of 21kg/cm.sq. Working pressure 30 TPH Capacity Thermax Boiler with hydraulic testing at 36kg/cm. Sq.pressure
9Dismantling & Erection of 63.5mm OD of air heater tubes of 30TPH Capacity Thermax make Boiler.
10Dismantling, Fabrication & Erection of 63.5mm OD Screen Tube 21kg/cm.sq. Working pressure Thermax make 30 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
11Dismantling, Fabrication & Erection of 63.5mm OD Drum to front Header 21kg/cm.sq. Working pressure Thermax make 30 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
12Dismantling, Fabrication & Erection of 63.5mm OD Top Header to front Header 21kg/cm.sq. Working pressure Thermax make 30 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
13Dismantling, Fabrication & Erection of 76.2mm OD Riser tube 21kg/cm.sq. Working pressure Thermax make 30 TPH Capacity Boiler with hydraulic testing at 36kg/cm. Sq.pressure
14Dismantling, Fabrication & Erection of 44.45mm OD x 4.06mm Thick. Of Super Heater Coil with proper support of 21kg/cm.sq. Working pressure 30 TPH Capacity Thermax Boiler with hydraulic testing at 36kg/cm. Sq.pressure
15Dismantling, Fabrication & Erection of 3"Schedule 40 Feed Water pipeLine.
16Dismantling, Fabrication & Erection of 3"Schedule 40 Feed Water pipe Line Bend.
17Dismantling, Fabrication & Erection of 4"Schedule 40 Steam line.
18Dismantling, Fabrication & Erection of 4"Schedule 40 Steam line Bend.
19Dismantling, Fabrication & Erection of 5"Schedule 40 Feed Water pipe Line/Steam Line.
20Dismantling, Fabrication & Erection of 5"Schedule 40 Feed Water pipe Line/Steam Line Bend.
21Dismantling, Fabrication & Erection of 6"Schedule 40 steam line.
22Dismantling & Erection of steam line Schedule 40 bend size 6"
23Dismantling, Fabrication & Erection of 8" Schedule 40 steam line.
24Dismantling & Erection of steam line Schedule 40 bend size 8"
25Dismantling, Fabrication & Erection of steam line nipple/reducer size 6"
26Dismantling, Fabrication & Erection of steam line nipple/reducer size 8"
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail