(1) Material Supply for RA modification of existing HOG compliance Power car to RCFSpec.No.EDTS-103, Rev-D, Amd-7 (ICF annexure-C) with RDSO modification sheet RDSO/PE/MS/AC-0051-2011,Rev-2 The materialsrequired per set is given below: 1. Feeder contactor bypass enable rotary switch andHOG contactor (HOG-A & HOG-B) bypass enable rotary switches -4nos 2. HOG contactor (HOG-A & HOG-B)bypass ON-OFF switch-2nos. 3. 3RH2122, 24V DC control contactor-2nos, 4. Cables for wiring (1.5sq.mm E-beam cables)-100mtrs. 5. Lugs, Cable tie & Hardwares (1.5sq.mm U lugs-50 Nos,cable tie 100mm&150mm-50Nos., each, 4x25mm bolts & nuts, spring washers & flats-10sets, cable jacket 25mm dia -2mtrs)-1set Make :RAMYAA or similar (2) CHARGES FOR installation, testing and commissioning of By-pass arrangement inPower Car for extending supply to RA/OMS coaches at non-vestibule ends as per RDSO lr.No.EL.1.6.9.22/HOGmain dt.29.04.2019 and ICF schematic Diagram No. LWLRRM 7-0-010 for power and control circuit SBC S2 [forLHB AC power car with HOG compliance drawing] Make:- SELF as per Spec/drg (RA Mode switch for powercar) [ Warranty Period: 30 Months after the date of delivery ]
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.