Replacement Of Damaged Rcc Precast Slab (Nmi Jobs) In Plant Areas Of Refinery-Iii Premises At Cpcl Manali , Ok , Providing And Filling Fine Aggregate (M-Sand) Of Approved Quality In Floor, Foundation Etc. In Layer Of 15 Cm Thickness Including, Watering, Ramming, Consolidating Etc. Complete. , Dismantling Rcc Work By (Taking All Necessary Safety Precautions) Manually/ By Mechanical Means For All Depth And Height, Below And Above Plinth Level Including Supply Of Tools & Tackles, Necessary Scaffolding, Propping, Cutting Reinforcement Bars, Breaking Into Pieces, All Labor, Etc., Cleaning And Disposal Of Unserviceablematerial To The Designated Place And Returning The Scrap Reinforcements To Scrap Yard Within The Refinery Premises As Per Instruction Of Engineer In Charge, All Complete. , Supply Of Unskilled Class Labourto Carry Out Petty Works Not Assessable For Measurements/Minor Repair Works, On Day-To-Day Basis During The Cpcl General Shift Hours (0730 - 1600 Hours) On All Regular Working Days From Monday To Saturday. The Rates Shall Include Esi, Pf, Payroll Cost And Allowances, Fringe Benefits, Overhead Supervision, Profits And Hand Tools. Payment For Part Of The Day Will Be Made On Prorata Basis. , Supply And Placing In Position Ms Reinforcement (Plain Round Bars) And/Or Tor Steel For Rcc Work Including Transporting The Steel To Site Of Work, Straightening, Cleaning & Removing Oil Grease If Any, Cutting, Bending To Required Shapes & Lengths As Per Details, Binding With Contractors Own 16 Swg Black Soft Annealed Binding Wire At Every Inter-Section, Supplying & Placing With Proper Cover Blocks, Supports, Chairs, Overlaps, Welding, Spacers Fan Hooks Etc. For All Heights & Depths Etc. All Complete As Directed. , Providing And Fixing Precast Slabs Beams Of M-35 Grade Rmcincluding Cleaning, Fixing, Lifting And Placing In Position, Necessary Shuttering, Finishing, Curing But Excluding Cost Of Reinforcement. , Providing 12Mm Thick Plaster In Cement Mortar 1:4 (1 Cement :4Fine Aggregate) On Walls / Concrete Surfaces Including Cleaning, Hacking Of Concrete Surfaces, Scaffolding, Finishing, Curing Etc., For All Heights. => Limited