Tender For Construction Of Entry-Gate At I.A. Deoria., deoria-Uttar Pradesh

Uttar Pradesh State Industrial Development Corporation Limited-UPSIDC has published Tender For Construction Of Entry-Gate At I.A. Deoria.. Submission Date for this Tender is 24-04-2023. Excavation Work Tenders in deoria Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

37178615
Tender For Construction Of Entry-Gate At I.A. Deoria.
Open Tender
Indian
Uttar Pradesh
deoria
24-04-2023

Tender Details

Construction Of Entry-Gate At I.A. Deoria. 1 Excavation In Foundation In Ordinary Soil ( Loam, Clayor Sand ) Including Lift Upto 1.50 M And Lead Upto 30M And Including Filling Watering And Ramming Of Excavated Earth Into The Trenches Or Into The Space Between The Building And The Sides Of Foundation Trenches Or Into The Plinth And Removal And Disposal Of Surplus Earth As Directed By The Engineer In-Charge Upto A Distance Of 30M From The Foundation Trenches. 2 Providing And Laying Cement Concrete In 1:2:4 ( 1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 20 Mm Nominal Size ) And Curing Complete, Including Cost Of Form Work. 3 Rcc Work Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete In Raft Foundation, Including The Cost Of Centering, Shuttering, Finishing And Excluding Reinforcement - All Work Up To Plinth Level In :1:1.5:3 ( 1 Cement : 1.5 Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size ) 4 Mild Steel Or Iron Work In Plain Work Such As Reinforced Concrete Or Reinforced Brick Work ( When Not Included In And An Over All Rates ) Brought To Required Shape As Necessary Including Bending For Proper Completion Of The Work And Excluding The Supply Of Steel And Its Wastage Bend, Hooks And Authorized Over Lapping Shall Be Measured Upto Floor To Level. 5 Sand Filling In Plinth Including Supply Of Necessary Quantity Of Local Sand From A Distance Not Exceeding 8 Kms From The Site Of Work And Including Watering Dressing Etc. Required For Proper Completion Of Work 6 Rcc Work Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete In Raft Foundation, Including The Cost Of Centering, Shuttering, Finishing And Excluding Reinforcement - All Work Up To Plinth Level In :1:1.5:3 ( 1 Cement : 1.5 Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size ) 7 Antitermite Treatment Of Along External Wall Where The Apron Is Not Provided Using Chemical Emulsion @ 7.5 Litres / Sqm Of The Vertical Surface Of The Substructureto A Depth Of 300 Mm Including Excavation Channel Along The Wall & Rodding Etc. Complete: With Chlorpyriphos / Lindane E.C. 20% With 1 % Concentration As Per Is6313:2001 8 2.50 Cm Thick D, .P.C With Cement And Approved Coarse Sand 1:2 And Including Water Proofing Materials As Approved By The Engineer In Charge In The Proprortion As Specified But The Manufacture Including Supply Of All Material, Labore T&P For Proper Completion Of He Work. Including Proper Curing And Shuttering As Necessary. 9 Rcc Work Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete In Raft Foundation, Including The Cost Of Centering, Shuttering, Finishing And Excluding Reinforcement - All Work Up To Plinth Level In :1:1.5:3 ( 1 Cement : 1.5 Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size ) 10 Rcc Work Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete In Raft Foundation, Including The Cost Of Centering, Shuttering, Finishing And Excluding Reinforcement - All Work Up To Plinth Level In :1:1.5:3 ( 1 Cement : 1.5 Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size ) 11 Supply And Fixing Of 35Mm Thick Flush Doors, Commercial Quality Conforming Of I.S. 2202 Part-1 ( 1983 ) Including Isi Marked Oxidized Iron Fitting With Screws, Bolt Hinges, Handles, Siliding Bolt, Door Stopper And Tower Bolt Etc. 12 Providing And Fixing Glass Panes With Putty And Glazing Clips In Steel Doors, Windows, Clerestory Windows All Complete With : 4.0 Mm Thick Panes. 13 Supply And Fixing Galvanized Mosquitos Proof Heavy Quality Iron Wire Gauge Or Expended Metal Heavy Quality Over Windows And Including Supply Of C.P. Teakwood Batten 8Cmx1cm ( 3X3 / 8 ) / Flat Iron 25Mmx4mm And Including Supply Of Necessary Screws All Materials, Labour, T&P Etc. Required For Proper Completion Of Work. 14 P / F Of Doors And Window Sal Wood Chowkhat As Per Design Prescribed By Engineer In Charge. 15 ProvidingandlayingBrickcoba12Mmthicklaidwithm-150 Class Brick Bat Coba 7.50Cm Thick With Gap Of 15Mm To Each Other, Over 20Mm Thick Base Of Cement Mortar 1:4 Cement And Coarse Sand Mixed With Water Proofing Compound Spreding Cement Slurry Mixed With Acrelic Cement Concrete Water Proofing Compound Filled Gaps Of Coba & Top Of Coba Mortar Mixed With Water Proofing Compound In 1:4 Cement And Coarse Sand Mortar Finished Smooth & Top Mashed False Square 30Cmx30cm And Side Wall Parapet Shall Be Mono Tythic Plaster Wall Upto 30Cm Higher And Junction And Corner Shall Be Rounded By Brick Ballast Cement And Coarse Sand Masonary Coba With Top Finished Plaster Mixed With Acetic Water Proofing Compound @ 2% By Weight & Including Supply Of All Material, Labour, T&P Etc Complete For Proper Completion Of Work. 16 Kota Stone Slab Flooring Over 20 Mm ( Average ) Thick Base Laid Over And Jointed With Grey Cement Slurry Mixed With Pigment To Match The Shade Of The Slab, Including Rubbing And Polishing Complete With Base Of Cement Mortar 1 : 4 ( 1 Cement : 4 Coarse Sand ) :25 Mm Thick 17 Finishing Walls With Water Proofing Cement Paint Of Approved Make Such As Super Snowcem, Durocem, Robiance, Guttucem, Supercem Quality And Of Required Shade On Under Coated Wall Surface ( One Coat ) Over And Including One Coat White Cement Primer To Give And Even Shade After Thoroughly After Brushing The Surface 18 Destempering With Oil Bound Distemper On Undercoated Wall Surfaces ( Two Coat ) To Give An Even Shade Including Thoroughly Brooming The Surface To Remove All Dirt, Dust Mortar Drop And Loose Scales Of Lime Wash And Other Foreign Matter. 19 Providing And Fixing False Ceiling As Per Is : 277 Andis: 2095- ( Part I ) 12.45.1: 2011 ( Board With Bis Certification Marks ) 20 Providing And Fixing 18 Mm Thick Granite ( Gang Saw Cut ) Mirror Polished, Premoulded And Prepolished, Machine Cut For Kitchen Platforms, Vanity Counters, Window Sills, Facias And Similar Locations, Of Required Size, Approved Shade, Colour And Texture Laid Over 20 Mm Thick Base Cement Mortar 1:4 ( 1 Cement : 4 Coarsesand ) , Joints Treated With White Cement, Mixed With Matching Pigment, Epoxy Touch Ups, Including Rubbing, Curing, Moulding And Polishing To Edges To Give High Gloss Finish Etc. Complete At All Levels. ( Slab Area Above 0.50 Sq.M. ) 21 P / L Factory Made Kerb Stone Of M-25 Grade As Per Dsr 16.69 Item 22 Paver Block , Providing And Laying Of Factory Made 80 Mm Thick Rubber Moulded Interlocking Cement Concrete Tiles ( 30 Mpa ) Including 25 Mm Thick Compacted Bed Of Fine Sand Compacting And Proper Embedding / Laying Of Interlocking Tiles Levelling And Derssing Of Surface To Required Level And Slope, Filling Loints With Fine Sand Including The Cost Of Material, Labour T & P Etc. Required For Proper Completion Of The Work Complete. 23 Providind & Laying Slection No. 1 Doob Grass Turf & Plantingwith Earth 50Mm To 60Mm Thickness Of Existing Ground Prepared With Proper Level And Ramming With Required Tools Wooden And Than Rolling The Surface With Light Roller Make The Surface Smoothen And Light Watering The Same Maintenance For 30 Days Or More Till The Grass Establish Properly , As Per Direction Of Officer In Charge. 24 Providind & Laying Fast Growth Summer Glow Plant, For Garden & Plantingproperly , As Per Direction Of Officer In Charge. 25 Providind & Layingjasmine Plants, For Garden & Plantingproperly , As Per Direction Of Officer In Charge. 26 Providind & Laying Plumeria Plant ( Champa ) , For Garden & Plantingproperly , As Per Direction Of Officer In Charge. 27 Providind & Layingfragrant Rosy Gardenia , For Garden & Plantingproperly , As Per Direction Of Officer In Charge. 28 Providind & Layinggulmohar – Delonix Regia Plant , For Garden & Plantingproperly , As Per Direction Of Officer In Charge. 29 Supply And Fixing Of Ss Grillincluding The Cost Of All Material, Labour T & P Etc. Required For Proper Completion Of The Work Complete. As Direction Of The Engineer-In-Charge. 30 Supply And Installation Ofelectro Mechanical Equipments-Cp Plus Cctv Camera ( Camera Range: 10 To 20 M ) Including The Cost Of All Material, Labour T & P Etc. Required For Proper Completion Of The Work Complete. As Direction Of The Engineer-In-Charge. 31 Supply And Installation Ofthree Seater Visitor Chair, Jhe-Wc094 ( Steel ) Including The Cost Of All Material, Labour T & P Etc. Required For Proper Completion Of The Work Complete. As Direction Of The Engineer-In-Charge. 32 Supply And Installation Of A.C. Cooler Including The Cost Of All Material, Labour T & P Etc. Required For Proper Completion Of The Work Complete. As Direction Of The Engineer-In-Charge. 33 Supply And Installation Oftv Screen & Server ( Storage ) Including The Cost Of All Material, Labour T & P Etc. Required For Proper Completion Of The Work Complete. As Direction Of The Engineer-In-Charge. 34 Supply And Installation Ofautomatic Boom Barriers ( Boom Length Upto 5 Mtr ) Including The Cost Of All Material, Labour T & P Etc. Required For Proper Completion Of The Work Complete. As Direction Of The Engineer-In-Charge. 35 Supply And Installation Ofelectrical Fixture ( Tube Lights, Fans, Fancy Lights ) As Per Type Design Including The Cost Of All Material, Labour T & P Etc. Required For Proper Completion Of The Work Complete. As Direction Of The Engineer-In-Charge. 36 P / Fixing Ofplumbing Items , Rain Water Drop Pipe Etc As Per Type Design Including The Cost Of All Material, Labour T & P Etc. Required For Proper Completion Of The Work Complete. As Direction Of The Engineer-In-Charge.

Key Value

Document Fees
INR 2850 /-
EMD
INR 80500.0 /-
Tender Value
INR 40.21 Lakhs /-

BOQ Items

Name of Work: Construction of Entry-Gate at I.A. Deoria
Sl. No. Item Description
1Excavation in foundation in ordinary soil (Loam,Clayor Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches.
2Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work.
3RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its wastage Bend, hooks and authorized over lapping shall be measured upto floor to level.
5Sand filling in plinth including supply of necessary quantity of local sand from a distance not exceeding 8 Kms from the site of work and including watering dressing etc. required for proper completion of work
6RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
7Antitermite treatment of along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructureto a depth of 300 mm including excavation channel along the wall & rodding etc. complete: With Chlorpyriphos / Lindane E.C. 20% with 1 % concentration As per IS 6313:2001
82.50 Cm thick D,.P.C with Cement and approved coarse sand 1:2 and including water proofing materials as approved by the Engineer in Charge in the proprortion as specified but the manufacture including supply of all material, labore T&P for proper completion of he work. Including proper curing and shuttering as necessary.
9RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
10RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
11Supply and fixing of 35mm thick flush doors, commercial quality conforming of I.S. 2202 part-1 (1983) including ISI marked oxidized iron fitting with screws, Bolt Hinges,Handles,Siliding bolt, Door Stopper and tower bolt etc.
12Providing and fixing glass panes with putty and glazing clips in steel doors, windows,clerestory windows all complete with : 4.0 mm thick panes.
13Supply and fixing galvanized mosquitos proof heavy quality iron wire gauge or expended metal heavy quality over windows and including supply of C.P. Teakwood batten 8cmX1cm (3"X3/8")/flat iron 25mmX4mm and including supply of necessary screws all materials, labour, t&P etc. required for proper completion of work.
14P/F OF DOORS AND WINDOW SAL WOOD CHOWKHAT as per design prescribed by Engineer in charge.
15Providingandlaying"brickcoba"12mmthicklaidwithM-150 class brick bat coba 7.50cm thick with gap of 15mm to each other, over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreding cement slurry mixed with acrelic cement concrete water proofing compound filled gaps of coba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed false square 30cmX30cm and side wall parapet shall be mono tythic plaster wall upto 30cm higher and junction and corner shall be rounded by brick ballast cement and coarse sand masonary coba with top finished plaster mixed with acetic water proofing compound @ 2% by weight & including supply of all material, labour, T&P etc complete for proper completion of work.
16Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :25 mm thick
17Finishing walls with water proofing cement paint of approved make such as Super snowcem, Durocem, Robiance, Guttucem, Supercem quality and of required shade on under coated wall surface (One coat) over and including one coat white cement primer to give and even shade after thoroughly after brushing the surface
18Destempering with Oil Bound Distemper on undercoated wall surfaces (Two coat) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drop and loose scales of lime wash and other foreign matter.
19Providing and fixing false ceiling as per IS : 277 andIS: 2095- (Part I) 12.45.1: 2011 (Board with BIS Certification marks)
20Providing and fixing 18 mm thick Granite (gang saw cut) mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. (Slab area above 0.50 Sq.M.)
21P/L factory made kerb stone of M-25 grade as per DSR 16.69 ITEM
22PAVER BLOCK ,Providing and laying of Factory made 80 mm thick rubber moulded interlocking cement concrete tiles ( 30 mpa) including 25 mm thick compacted bed of fine sand compacting and proper embedding / laying of interlocking tiles levelling and derssing of surface to required level and slope, filling loints with fine sand including the cost of material,labour T & P etc. required for proper completion of the work complete.
23Providind & laying Slection no. 1 doob grass turf & plantingwith earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly ,as per direction of officer in charge.
24Providind & laying Fast Growth Summer Glow Plant, For Garden & plantingproperly ,as per direction of officer in charge.
25Providind & layingJasmine plants, For Garden & plantingproperly ,as per direction of officer in charge.
26Providind & laying Plumeria Plant (Champa), For Garden & plantingproperly ,as per direction of officer in charge.
27Providind & layingFragrant Rosy Gardenia , For Garden & plantingproperly ,as per direction of officer in charge.
28Providind & layingGulmohar – Delonix Regia plant , For Garden & plantingproperly ,as per direction of officer in charge.
29Supply and fixing of SS GRILLincluding the cost of all material,labour T & P etc. required for proper completion of the work complete. As direction of the Engineer-In-Charge.
30Supply and Installation ofElectro Mechanical Equipments-CP PLUS CCTV CAMERA (Camera Range: 10 to 20 m) including the cost of all material,labour T & P etc. required for proper completion of the work complete. As direction of the Engineer-In-Charge.
31Supply and Installation ofThree Seater Visitor Chair, JHE-WC094 (STEEL) including the cost of all material,labour T & P etc. required for proper completion of the work complete. As direction of the Engineer-In-Charge.
32Supply and Installation of A.C. COOLER including the cost of all material,labour T & P etc. required for proper completion of the work complete. As direction of the Engineer-In-Charge.
33Supply and Installation ofTV SCREEN & SERVER (STORAGE) including the cost of all material,labour T & P etc. required for proper completion of the work complete. As direction of the Engineer-In-Charge.
34Supply and Installation ofAutomatic Boom Barriers (Boom length upto 5 mtr) including the cost of all material,labour T & P etc. required for proper completion of the work complete. As direction of the Engineer-In-Charge.
35Supply and Installation ofElectrical Fixture (Tube lights, Fans, Fancy lights) as per type design including the cost of all material,labour T & P etc. required for proper completion of the work complete. As direction of the Engineer-In-Charge.
36P/Fixing ofPLUMBING items , RAIN WATER DROP PIPE ETC as per type design including the cost of all material,labour T & P etc. required for proper completion of the work complete. As direction of the Engineer-In-Charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail