Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Work Contract For Dismantling Of The 110Kv Structures And Equipments At Eht Sc No 379 Synergy Sakthi Renewable Energy Limited At Olaipatti Village In Kodamandapatti Section In Pochampally Division Work Contract For Dismantling Of . Submission Date for this Tender is 12-09-2022. Dismantling Work Tenders in Krishnagiri Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Labour for dismantling of 110 KV LAS of multi stage including monitor (Line side LAS 6 No"s) |
2 | Labour for dismantling of 110 KV measurement transformer including consumables and with own crane arrangement (9 No"s C.T"s +12 No"s P.T"s) |
3 | Labour for dismantling of 110 KV with earth isolator including MOM and BOM boxes andinsulators |
4 | Labour for dismantling of 110 KV SF6 breaker including consumables and with own crane arrangement (For LILO Feeders) |
5 | Labour for dismantling of 110 KV insulator including underhang |
6 | Labour for dismantling of 110 KV strung bus with single zebra conductor( 1 Span 3 Runs) |
7 | Labour for dismantling of busbar including power connectors |
8 | a. 75 mm IPS aluminium with bends |
9 | b. 75 mm IPS aluminium without bends |
10 | Labour for dismantling of jumpers and droppers |
11 | Labour for removing cables from Cable duct/trench/structure |
12 | Upto 8 core |
13 | above 8 core |
14 | Labour for dismantling of Duplex Panel |
15 | Labour for loading or unloading or shifting of fragile material without using board crane (one operation) for devalution to the stores |
16 | Labour for loading or unloading or shifting of non fragile material without using board crane (one operation) for devolution to the stores |
17 | Labour for loading, or unloading, or shifting of 110KV and above breakers, CT, PT & Etc., by own crane arrangement.(One operation) |
18 | Labour for loading,or unloading, or shifting of panels by own crane arrangement. (Oneoperation) |
19 | G.S.T. @18% for Labour |
20 | E.P.F. @ 13% should be Entered by the Bidder |
21 | E.S.I. @ 3.25 % should be Entered by the Bidder |