}

Dismantling And Stacking Of Existing Facilities In Cpcls Cbr At Nagapattinam , Tamilnadu Dismantling And Stacking Of Existing Facilities In Cpcls Cauvery Basin Refinery At Nagapattinam , Tamilnadu, CPCL, Panangudi, Nagapattinam, Tamilnadu-Tamil Nadu

Chennai Petroleum Corporation Limited-CPCL has published Dismantling And Stacking Of Existing Facilities In Cpcls Cbr At Nagapattinam , Tamilnadu Dismantling And Stacking Of Existing Facilities In Cpcls Cauvery Basin Refinery At Nagapattinam , Tamilnadu. Submission Date for this Tender is 14-06-2021. Dismantling Work Tenders in CPCL, Panangudi, Nagapattinam, Tamilnadu Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

27821118
Corrigendum : Dismantling And Stacking Of Existing Facilities In Cpcls Cbr At Nagapattinam , Tamilnadu Dismantling And Stacking Of Existing Facilities In Cpcls Cauvery Basin Refinery At Nagapattinam , Tamilnadu
Open Tender
Indian
Tamil Nadu
CPCL, Panangudi, Nagapattinam, Tamilnadu
14-06-2021

Tender Details

Dismantling And Stacking Of Existing Facilities In Cpcls Cbr At Nagapattinam , Tamilnadu Dismantling And Stacking Of Existing Facilities In Cpcls Cauvery Basin Refinery At Nagapattinam , Tamilnadu , Dismantling Of Existing Static & Rotary Equipments - Columns , Tanks , Vessels , Flare , Sphere , Bullets , Pumps , Compressors , Turbines & Other Rotary Equipments , Etc . , Of Cbr Plant . Disconnecting The Equipment From The Connected Piping , Removal Of Anchor Bolts , Dismantling Of Equipment From The Existing Elevations / Location ( Along With The Insulation , If Any ) , As Per The Instructions Of Engineer-In-Charge . Providing Scaffolding ( Wherever Required ) , All Tools , Tackles , Machinery , Consumables , Transportation Of Equipments , Lifting Of Equipments , Instruments , Labour , Ancillary , Etc . , To Complete The Dismantling Work In As Per The Specification & Hse Guidelines As Provided In Tender & Engineer-In-Charge . Stacking Or Storing Material Category Wise And Tagging The Dismantled Facilities At Designated Place As Per Eic Instructions . , Dismantling Of All Columns And Its Allied Facilities , Segregation , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Storage Tanks And Its Allied Facilities , Segregation , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Vessels , Filters , Packge Items And Its Allied Facilities , Segregation , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Heat Exchangers , Coolers , Heaters , Condensers And Its Allied Facilities , Segregation , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of Furnace Including Suppoprts And Its Allied Facilities , Segregation Of Refractory From Steel Structures , Segregation , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of Facilities At Dm , Ro , Boiler , Stg , Cooling Tower Plants Package Items And Its Allied Facilities , Segregation Of Refractory From Steel Structures , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of Ro Plant Hdpe Package Items And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of Whole Flare System And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of Sphere And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Bullets And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Rotary Equipments And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Pipes , Pipe Fittings , Valves , Flanges , Gaskets , Pipe Supports , Nut-Bolts , Supports , Removal Of Insulation From Pipes Etc . As Is Condition At Cbr Plant At All The Existing Elevations . Providing Scaffolding , All Tools , Tackles , Machinery , Consumables , Transportation , Lifting , Instruments , Labour , Ancillary , Etc . To Complete The Dismantling Work In All Respects As Per The Specifications & Hse Guidelines As Provided In Tender & Engineer-In-Charge . Stacking Or Storing Material Category Wise And Tagging The Dismantled Facilities At Designated Place As Per Eic Instructions . , Dismantling Of All Staineless Steel Pipe Lines And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Carbon Steel Pipe Lines And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Pipe Lines Structural Steel Supports And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Removal Of Insulation From Pipelines & Equipments , Segregation Of Cladding Materials Separately , Dm Plant Hazardous Resin & Packings ( Cation , Anion And Activated Charcoal & Alumina Etc ) , Collecting Gaskets & Stacking At Desgnated Place And Disposing All The Hazardous Materials At The Risk And Cost Of Contractor And As Per The Instructions Of Eic . , Dismantling Of Electrical Panels ( Pmcc , Mcc , Ldb , Dbs , Lighting , Power Panels , Distribution And Lighting Transformers , All Junction Boxes , Earthing Stripes , Wire Ropes , Earth Pits Materials , Location Control Stations , All Electrical Cables Hv/Lv/Power/Control/ Lighting , Etc . ) , Lighting Fixtures , Lighting Poles , Cable Trays , All Welding Receptacles , All Bus Ducts , Etc . , Stacking / Storing / Placing And Tagging As Per The Instruction Of Eic . Providing Required Scaffolding , All Tools , Tackles , Machinery , Consumables , Transportation Of Equipments , Lifting Equipments , Instruments , Labour , Ancillary , Etc . To Complete The Dismantling Work In All Respects As Per The Specifications & Hse Guidelines As Provided In Tender & Engineer-In-Charge . , Dismantling Of All Electrical Panels ( Pmcc / Mcc ) And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Electrical Panels ( Ldb , Db , Lighting Panels , Power Panels ) And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Distribution & Lighting Transformers And Its Allied Facilities , Segregation , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Junction Boxes And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Earthing Stripes / Wire Ropes & Earth Pits And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling Of All Local Control Stations ( Lcs ) And Its Allied Facilities , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . , Dismantling / Removal Of All Electrical Cables ( Hv / Lv Power / Control / Lighting ) Of Aluminium Conductor And Its Allied Facilities , Rolling , Segregation Of Materials , Tagging And Placing / Stacking Metallurty Wise At Designated Place At Cbr Plant As Per Scope Of Work And Instrucions Of Eic . ,

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 12-May-2021 Corrigendum No.1 - Postponement of Site Visit and Pre-bid Meeting Other 03-06-2021
2 24-May-2021 Corrigendum No.2 Other 03-06-2021
3 31-May-2021 Corrigendum No.3 Date 14-06-2021
4 04-Jun-2021 Corrigendum No.4 Other 14-06-2021
5 10-Jun-2021 Corrigendum No Other 14-06-2021

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

NAME OF WORK : Dismantling & Stacking of Existing Facilities in CPCL’s Cauvery Basin Refinery at Nagapattinam, Tamilnadu
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Dismantling of Existing Static & Rotary Equipments - Columns, Tanks, Vessels, Flare, Sphere, Bullets, Pumps, Compressors, Turbines & Other Rotary equipments, etc., of CBR Plant. Disconnecting the equipment from the connected piping, removal of anchor bolts, dismantling of equipment from the existing elevations / location (along with the insulation, if any), as per the instructions of Engineer-in-Charge. Providing scaffolding (wherever required), all tools, tackles, machinery, consumables, transportation of equipments, lifting of equipments, instruments, labour, ancillary, etc., to complete the dismantling work in as per the specification & HSE guidelines as provided in tender & Engineer-in-Charge. Stacking or storing material category wise and tagging the dismantled facilities at designated place as per EIC instructions.
2 2 Dismantling of all columns and its allied facilities, segregation, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 200 MT
3 3 Dismantling of all storage tanks and its allied facilities, segregation, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 2176 MT
4 4 Dismantling of all vessels, filters, packge items and its allied facilities, segregation, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 509 MT
5 5 Dismantling of all Heat exchangers, coolers, heaters, condensers and its allied facilities, segregation, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 476 MT
6 6 Dismantling of Furnace including suppoprts and its allied facilities, segregation of refractory from steel structures, segregation, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 67 MT
7 7 Dismantling of facilities at DM, RO, Boiler, STG, Cooling Tower Plants package items and its allied facilities, segregation of refractory from steel structures, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 300 MT
8 8 Dismantling of RO Plant HDPE package items and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 17 MT
9 9 Dismantling of whole flare system and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 48 MT
10 10 Dismantling of Sphere and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 515 MT
11 11 Dismantling of all Bullets and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 317 MT
12 12 Dismantling of all Rotary Equipments and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 150 MT
13 13 Dismantling of all pipes, pipe fittings, valves, Flanges, Gaskets, pipe supports, Nut-Bolts, supports, removal of insulation from pipes etc. as is condition at CBR Plant at all the existing elevations. Providing scaffolding, all tools, tackles, machinery, Consumables, transportation, lifting, instruments, labour, ancillary, etc. to complete the dismantling work in all respects as per the specifications & HSE guidelines as provided in Tender & Engineer-in-Charge. Stacking or storing material category wise and tagging the dismantled facilities at designated place as per EIC instructions.
14 14 Dismantling of all Staineless Steel pipe lines and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 39 MT
15 15 Dismantling of all Carbon Steel pipe lines and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 2821 MT
16 16 Dismantling of all pipe lines structural steel supports and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 146 MT
17 17 Removal of insulation from pipelines & equipments, segregation of cladding materials separately, DM plant hazardous resin & packings (cation, anion and activated charcoal & alumina etc), Collecting gaskets & stacking at desgnated place and disposing all the hazardous materials at the risk and cost of contractor and as per the instructions of EIC. 101 MT
18 18 Dismantling of Electrical panels (PMCC, MCC, LDB, DB's, Lighting, Power Panels, Distribution and Lighting Transformers, all Junction Boxes, Earthing Stripes, Wire Ropes, Earth Pits materials, Location Control Stations, All electrical Cables HV/LV/Power/Control/ Lighting, etc.), Lighting Fixtures, Lighting Poles, Cable Trays, all Welding Receptacles, all Bus ducts, etc., stacking / storing / placing and tagging as per the instruction of EIC. Providing required scaffolding, all tools, tackles, machinery, Consumables, transportation of equipments, lifting equipments, instruments, labour, ancillary, etc. to complete the dismantling work in all respects as per the specifications & HSE guidelines as provided in Tender & Engineer-in-Charge.
19 19 Dismantling of all electrical panels (PMCC / MCC) and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 58 MT
20 20 Dismantling of all electrical panels (LDB, DB, Lighting Panels, Power Panels) and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 23 MT
21 21 Dismantling of all distribution & lighting transformers and its allied facilities, segregation, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 52 MT
22 22 Dismantling of all junction boxes and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 4 MT
23 23 Dismantling of all earthing stripes / wire ropes & earth pits and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 73 MT
24 24 Dismantling of all Local control stations (LCS) and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 2 MT
25 25 Dismantling / removal of all electrical cables (HV / LV power / control / lighting) of Aluminium Conductor and its allied facilities, rolling, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 216 MT
26 26 Dismantling / removal of all electrical cables (HV / LV power / control / lighting) of Copper Conductor and its allied facilities, rolling, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 33 MT
27 27 Dismantling all lighting poles / fixtures except street lighting and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 24 MT
28 28 Dismantling all cable trays, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 108 MT
29 29 Dismantling all welding receptable (Sockets), segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 1 MT
30 30 Dismantling Busduct of Aluminium, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 1 MT
31 31 Dismantling UPS (with ACDB & Batteries) segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 1.5 MT
32 32 Dismantling of all Instruments including supports for Transmitters, Gauges, Indicators, Switches, Junction boxes, Impulse pipes & Tubes, fittings, Cables & cable trays, etc., Stacking or storing material category wise and tagging the dismantled facilities at designated place as per EIC instructions. Providing required scaffolding, all tools, tackles, machinery, Consumables, transportation of equipments, lifting equipments, instruments, labour, ancillary, etc. to complete the dismantling work in all respects as per the specifications & HSE guidelines as provided in Tender & Engineer-in-Charge.
33 33 Dismantling of all instruments including structural steel supports (Transmitters, Gauges, Indicators, Switches etc) and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 9 MT
34 34 Dismantling of all Junction Boxes including structural steel supports and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 6 MT
35 35 Dismantling / removal of all instrumentation cables of Copper Conductor and its allied facilities, rolling, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 24 MT
36 36 Dismantling of all impulse pipes, tubes & fittings including structural steel supports and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 16 MT
37 37 Dismantling all instrumentation cable trays segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 51 MT
38 38 Dismantling all instrumentation DCS/PLC system with all other panels, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 14 MT
39 39 Demolition of all concrete Buildings, Equipment & Structural Foundations, Tanks Pads / Foundations, etc., loading and unloading, Transportation of all debris like concrete, tiles, bricks, sand and gravel, etc., as per the instructions of the Engineer-in-Charge at designated place at CBR Plant. Providing required scaffolding, all tools, tackles, machinery, Consumables, transportation of equipments, lifting equipments, instruments, labour, ancillary, etc. to complete the dismantling work in all respects as per the specifications & HSE guidelines as provided in Tender & Engineer-in-Charge.
40 40 Dismantling / demolition of all concrete buildings, foundations, fire proof materials, refractory and its allied facilities, stacking / storing at desgnated place at CBR plant as per scope of work and instrucions of EIC. 4865 MT
41 41 Dismantling / demolition of all steel structural columns, beams, bars, nut-bolts including supports and its allied facilities, segregation of materials, tagging and placing / stacking metallurty wise at designated place at CBR plant as per scope of work and instrucions of EIC. 1791 MT
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail