South Eastern Coalfields Limited-SECL has published Hiring Of Hemm For Excavating Ob , In Situ , Loading , Transportation , Unloading , Dumping , Dozing , Maintenance Of Haul Road And All Other Activities As Detailed In The Nit , Quantity-3 , 23 , 98 , 912 . 00 Cum , Period-730 Days At Gevra Ocm ,. Submission Date for this Tender is 16-09-2019. Excavation Work Tenders in Gevra OCM, Gevra area, Tehsil- Kathghora Korba, CG Chhattisgarh. Bidders can get complete Tender details and download the document.
Name of Work: Hiring of HEMM for excavating all kinds of strata /overburden/ in situ, loading in to tippers, transportation and unloading of excavated materials & silt, dumping, dozing, scrapping /removal of all bands, preparation/ maintenance of haul road, water sprinkling and spreading of material at the site shown and as per directives of the Management / Engineer–in-Charge at Gevra OCM, Gevra Area". Total quantity of 3,23,98,912.00 Cum(32.398 MCuM)(Top soil +Hard Strata), for a period of 730Days @ 44383 Cum per day at Gevra OCM, Gevra Area. NIT No SECL/BSP/CMC/e-Tender/344 dtd.24.08.2019. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Hiring of HEMM for excavating all kinds of strata /overburden/ in situ, loading in to tippers, transportation and unloading of excavated materials & silt, dumping, dozing, scrapping /removal of all bands, preparation/ maintenance of haul road, water sprinkling and spreading of material at the site shown and as per directives of the Management / Engineer–in-Charge at Gevra OCM , Gevra Area". Total quantity of 3,23,98,912.00 Cum(32.398 MCuM)(Top soil +Hard Strata), for a period of 730Days @ 44383 Cum per day at Gevra OCM, Gevra Area.\n\n | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | (a) Top soil (Not requiring Drilling) above E&F seam Total Quantity 31,84,249.00 Cum | |||
3 | 1.02 | (a)(i)Lead Slab:- 0-1KM, Total Quantity :- 2,83,486.00 Cum\nRoute No. 1- Quantity - 275541Cum, Dump - A\nRoute No. 2- Quantity- 7945 Cum, Dump - A \n | BI01010001010000000000000515BI0100001114 | 283486 | Cum |
4 | 1.03 | a)(ii) Lead Slab:-1-2 KM, Total Quantity :- 390172.00 Cum\nRoute No. 2 - Quantity -390172 Cum, Dump - A \n | BI01010001010000000000000515BI0100001118 | 390172 | Cum |
5 | 1.04 | (a)(iii)Lead Slab:- 2-3 KM, Total Quantity:- 714388.00 Cum\n Route No.-2- Quantity -181845 Cum, Dump - A \n Route No.-3- Quantity - 532543 Cum, Dump - B \n | BI01010001010000000000000515BI0100001119 | 714388 | Cum |
6 | 1.05 | (a)(iv) Lead Slab :- 3-4 KM, Total Quantity :- 1338879Cum\n Route No.-3 Quantity -1338879 Cum, Dump - B\n | BI01010001010000000000000515BI0100001120 | 1.33888e+06 | Cum |
7 | 1.06 | (a)(v) Lead Slab :- 4-5 KM, Total Quantity :- 457324.00 Cum\n Route No-3, Quantity - 457324 Cum, Dump - B\n | BI01010001010000000000000515BI0100001123 | 457324 | Cum |
8 | 2 | b) Hard Strata (Requiring Drilling in all kind of strata / OB) above E&F Seam & UK Seam for a quantity of with Drilling - 2,92,14,663.00 Cum. Total Quantity- 29214663.00 Cum (29.214 MCum) | |||
9 | 2.01 | (b)(i)Lead Slab: 0-1KM , Total Quantity: 1003975 Cum \nRoute No. 1: Quantity- 992431 Cum, Dump - A\nRoute no. 2: Quantity- 11544 Cum, Dump - A \n \n | BI01010001010000000000000515BI0100001126 | 1.00398e+06 | Cum |
10 | 2.02 | (b)(ii) Lead Slab: 1-2 KM, Total Quantity:- 4606574.00 Cum\nRoute No. 1: Quantity -217147 Cum, Dump - A\nRoute No. 2: Quantity - 588727 Cum, Dump - A \nRoute No. 4: Quantity: 3800700 Cum, Dump - C \n | BI01010001010000000000000515BI0100001128 | 4.60657e+06 | Cum |
11 | 2.03 | (b)(iii) Lead Slab: 2-3 KM, Total Quantity :- 9897654.00 Cum\nRoute No. 2: Quantity: 380941.00 Cum, Dump - A\nRoute No. 3: Quantity: 9516713.00 Cum, Dump - C\n\n | BI01010001010000000000000515BI0100001120 | 9.89765e+06 | Cum |
12 | 2.04 | (b)(iv)Lead Slab :- 3-4 KM, Total Quantity :- 9516712.00 Cum\nRoute No 4 : Quantity: 9516712 Cum, Dump - C \n\n\n | BI01010001010000000000000515BI0100001123 | 9.51671e+06 | Cum |
13 | 2.05 | b)(v)Lead Slab :- 4-5 KM Total Quantity :- 4189748.00 CUM \nRoute No 4 : Quantity: 4189748 Cum, Dump - C\n\n\n | BI01010001010000000000000515BI0100001125 | 4.18975e+06 | Cum |
14 | 3 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001129 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail