| 1 | 1 | Speaker ( Part-A ) | | | |
| 2 | 1.1 | Supply, installation, testing &Comissioningof Left& Right Line Array Clusters Speakers. (Each Set ? Min 3 Array Modules)The work shall be completed in all respect as per sound engineering practice & Direction of EIC. | item1 | 2 | Set |
| 3 | 1.2 | Supply, installation, testing and commissioning of Subwoofer for Right & Left ArraysThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item2 | 4 | Nos |
| 4 | 1.3 | Supplly, installation, testing and commissioning of Compact High SPL Front Fill Loudspeaker SystemThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item3 | 4 | Nos |
| 5 | 1.4 | Supply , Installation, Testing and commissioning of small-format delay-fill Under Balcony LoudspeakerThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item4 | 2 | Nos |
| 6 | 1.5 | Supply , Installation, Testing and commissioning of small-format delay fill upper balcony LoudspeakerThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item5 | 4 | Nos |
| 7 | 1.6 | Supply, Installation, Testing and Commissioning of Stage MonitorThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item6 | 4 | Nos |
| 8 | 1.7 | Supply, installation, testing and commissioning of control Room loudspeaker The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item7 | 2 | Nos |
| 9 | 1.8 | Supplly, installation, testing and commissioning of Green Room & VIP Room Loudspeaker The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item8 | 4 | Nos |
| 10 | 1.9 | Supply, Installation, testing and commissioning of Analog Volume Controller for Control Room & VIP RoomThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item9 | 3 | Nos |
| 11 | 2 | Speaker Mounting Bracket | | | |
| 12 | 2.1 | Supply , Installatation, Testing & Commissioning of the Original Array Speaker OEM Rigging Frame & hanging arrangement for Right & Left Line Array Speaker System including subwoofers The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item10 | 2 | Nos |
| 13 | 2.2 | Supply, Installation, Testing and Commissioning of Original OEM suspension hardware for suspension of the Subwoofer as part of main Array System .The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item11 | 4 | Nos |
| 14 | 3 | Amplification | | | |
| 15 | 3.1 | Supply, installation, testing &Comissioning of 8 channel class D Power amplifierThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item12 | 5 | Nos |
| 16 | 3.2 | Supply, Installation, testing and commissioning of intregrated low impedence Class D AmplifierThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item13 | 3 | Nos |
| 17 | 3.3 | Supply, Installation, testing and commissioning of Rack Mount Kit for the Class D AmplifierThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item14 | 3 | Nos |
| 18 | 4 | Processing | | | |
| 19 | 4.1 | Supply , installation , testing and comissioning of Digital Sound Processor The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item15 | 1 | Nos |
| 20 | 4.2 | Supply, Installation, Testing & Commissioning of Digital Mixing Console The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item16 | 1 | Set |
| 21 | 4.3 | Supply, Installation, Testing & Commissioning of Dante Input Card for Console The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item17 | 1 | Nos |
| 22 | 4.4 | Supply, Installation, Testing & Commissioning of Stage Box The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item18 | 1 | Nos |
| 23 | 5 | Microphones | | | |
| 24 | 5.1 | Supply, Installation, Testing & Commissioning of Wireless Handheld MicrophoneThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item19 | 2 | Set |
| 25 | 5.2 | Wireless Lapel Microphone The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item20 | 1 | Set |
| 26 | 5.3 | Supply, Installation, Testing & Commissioning of Gooseneck Microphone with Shock MountThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item21 | 2 | Set |
| 27 | 5.4 | Supply, Installation, Testing & Commissioning of Microphone Stands with Clamp The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item22 | 6 | Nos |
| 28 | 5.5 | Supply, Installation, Testing & Commissioning of Wired Microphones with ON/OFF switchThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item23 | 4 | Nos |
| 29 | 5.6 | Supply, Installation, Testing & Commissioning of Dynamic Instrument Microphone The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item24 | 2 | Nos |
| 30 | 5.7 | Supply, Installation, Testing & Commissioning of Dynamic Drum Kit Microphone The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item25 | 2 | Nos |
| 31 | 5.8 | Supply, Installation, Testing & Commissioning of Active Direct BoxThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item26 | 2 | Nos |
| 32 | 5.9 | Supply, Installation, Testing & Commissioning of Monitor Headphones The work shall be completed in all respect as per sound engineering practice & Direction of EIC. | item27 | 1 | Nos |
| 33 | 6 | Supply, Installation, Testing & Commissioning of 6-way Wideband Antenna SplitterThe work shall be completed in all respect as per sound engineering practice & Direction of EIC. | item28 | 1 | Nos |
| 34 | 6.1 | Supply, Installation, Testing & Commissioning of Antena Power SupplyThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item29 | 1 | Nos |
| 35 | 6.2 | Supply, Installation, Testing & Commissioning of Omnidirectional Wideband Antenna and Wideband Antenna AmplifierThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item30 | 2 | Set |
| 36 | 6.3 | Supply, Installation, Testing & Commissioning of Antenna Mount Kit The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item31 | 2 | Set |
| 37 | 6.4 | Supply, Installation, Testing & Commissioning of Antenna CableThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item32 | 2 | Set |
| 38 | 7 | Installation & Commissioning | | | |
| 39 | 7.1 | Supply, Installation, Testing & Commissioning of Equipment Rack 32U The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item33 | 1 | Nos |
| 40 | 8 | (PART-B) Video | | | |
| 41 | 8.1 | Supply, Intallation, Testing & Commissioning of 3 Chip DLP, Dual-lamp, digital projector with Long Throw LenseThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item34 | 1 | Nos. |
| 42 | 8.2 | Supply, Intallation, Testing & Commissioning of Suitable projector cage and structure from balcony edge The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item35 | 1 | Nos. |
| 43 | 8.3 | Supply, Intallation, Testing & Commissioning of 324 inch Diagonal , Matt White Fixed Screen, 16:9 Aspect RatioThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item36 | 1 | Nos. |
| 44 | 8.4 | Supply, Intallation, Testing & Commissioning of 43\" LED Professional with Universal Low Level Trolley for Stage DisplayThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item37 | 2 | Set |
| 45 | 8.5 | Supply, Intallation, Testing & Commissioning of 43\" LED display for Control Room & VIP Room with Wall Mount with tilt and swivel The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item38 | 2 | Set |
| 46 | 8.6 | Supply, Intallation, Testing & Commissioning of 43\" LED display for Green Room with Wall Mount with tilt and swivel The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item39 | 2 | Set |
| 47 | 8.7 | Supply, Intallation, Testing & Commissioning of Wireless Presentation GatewayThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item40 | 1 | Nos. |
| 48 | 8.8 | Supply, Intallation, Testing & Commissioning of 19'' Interactive Touch display/Panel with CPU of latest configuration desktop PC systemThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item41 | 1 | Nos. |
| 49 | 8.9 | Supply, Intallation, Testing & Commissioning of Document VisualizerThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item42 | 1 | Nos. |
| 50 | 9 | Supply, Intallation, Testing & Commissioning of 20x optical Zoom PTZ camera with Mounting Shelf The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item43 | 2 | Nos. |
| 51 | 9.1 | Supply, Intallation, Testing & Commissioning of Blu Ray Player The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item44 | 1 | Nos. |
| 52 | 9.2 | Supply, Intallation, Testing & Commissioning of 8 x 8 Matrix Switcher with redundant power supplyThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item45 | 1 | Nos. |
| 53 | 9.3 | Supply, Intallation, Testing & Commissioning of Twsited Pair HDMI Reciever The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item46 | 9 | Nos. |
| 54 | 9.4 | Supply, Intallation, Testing & Commissioning of Twsited Pair HDMI Transmitter The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item47 | 1 | Nos. |
| 55 | 9.5 | Supply, Intallation, Testing & Commissioning of RS-232 extenders for JoystickThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item48 | 1 | Nos. |
| 56 | 9.6 | Supply, Intallation, Testing & Commissioning of RS-232 extenders for camerasThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item49 | 2 | Nos. |
| 57 | 9.7 | Supply, Installation, Testing & Commissioning of Active Wall Plate with VGA, Audio and HDMI with Cover plate The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item50 | 2 | Nos. |
| 58 | 9.8 | Supply, Installation, Testing & Commissioning of Control Processor with control port expansionThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item51 | 1 | Nos. |
| 59 | 9.9 | Supply, Installation, Testing & Commissioning of Multi-channel RecorderThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item52 | 1 | Nos. |
| 60 | 10 | Supply, Installation, Testing & Commissioning of Wireless Touch Panel , Wifi , 32 GB , white/silver with Application SoftwareThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item53 | 1 | Nos. |
| 61 | 10.1 | Supply, Installation, Testing & Commissioning of Docking Station for iPad , White , Smooth The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item54 | 1 | Nos. |
| 62 | 10.2 | Supply, Installation, Testing & Commissioning of Wireless RouterThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item55 | 1 | Nos. |
| 63 | 10.3 | Supply, Installation, Testing & Commissioning of 16 Port managed gigabit LAN SwitchThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item56 | 1 | Nos. |
| 64 | 10.4 | Supply, Installation, Testing & Commissioning of Joystick Controller for cameraThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item57 | 1 | Nos. |
| 65 | 10.5 | Supply, Installation, Testing & Commissioning of Smart Sequencing Power ConditionerThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item58 | 2 | Nos. |
| 66 | 10.6 | Supply, Installation, Testing & Commissioning of Standard AV rack with 600mm Width, 600 mm Outer Depth and 42U HeightThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item59 | 1 | Nos. |
| 67 | 10.7 | Supply and laying of 1 Mtrs. HDMI-HDMI CableThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item60 | 25 | Nos. |
| 68 | 10.8 | Supply and laying of 5 Mtrs. HDMI-HDMI CableThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item61 | 4 | Nos. |
| 69 | 10.9 | Supply and laying of 10 Mtrs. HDMI-HDMI CableThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item62 | 2 | Nos. |
| 70 | 11 | Supply and laying of 5 Mtrs. VGA & Audio-VGA & AudioThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item63 | 2 | Nos. |
| 71 | 11.1 | Supply, Intallation, Testing & Commissioning of HDMI patch cable - 30ftThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item64 | 2 | Nos. |
| 72 | 11.2 | Supply, Intallation, Testing & Commissioning of HDMI to DVI cable - 6ft The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item65 | 2 | Nos. |
| 73 | 11.3 | Supply, Intallation, Testing & Commissioning of Floor Box and Interface PlatesThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item66 | 2 | Nos. |
| 74 | 12 | ( C ) - Bulk Cables, Connectors and Accessories | | | |
| 75 | 12.1 | Supply, Installation, testing and commissioning of Bulk accessories, Wire rope slings, Swaged assemblies etc. The work shall be completed in all respect as per sound engineering practice & Direction of EIC | item67 | 1 | LOT |
| 76 | 12.2 | Supply ,Installation, Testing & Commissioning of XLR Male / Female, 1/4\" Phono, Speakon RCA, EP ConnectorsThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item68 | 1 | LOT |
| 77 | 12.3 | Supply , Installation, Testing, Commissioning of 6mm Microphone Audio Signal CableThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item69 | 400 | Mtr |
| 78 | 12.4 | Supply , Installation, Testing & Commissioning of Twinaxial 2×2.5 Sqmm Speakers CableThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item70 | 200 | Mtr |
| 79 | 12.5 | Supply , Installation, Testing & Commissioning of Twinaxial 2×4 Sqmm Speakers CableThe work shall be completed in all respect as per sound engineering practice & Direction of EIC. | item71 | 300 | Mtr |
| 80 | 12.6 | Supply , Installation, Testing & Commissioning of Twinaxial 8×2.5 Sqmm Speakers CableThe work shall be completed in all respect as per sound engineering practice & Direction of EIC | item72 | 200 | Mtr |
| 81 | 12.7 | Supply, Installation, testing and commissioning of Bulk Cables, Patch Cord and ConnectorsThe work shall be completed in all respect as per sound engineering practice & Direction of EIC. | item73 | 1 | Lot |
| 82 | 13 | PART-(D) | | | |
| 83 | 13.1 | 1st Year Comprehensive Annual Maintenance Cost | item74 | 1 | LS |
| 84 | 13.2 | 2nd Year Comprehensive Annual Maintenance Cost | item75 | 1 | LS |
| 85 | 13.3 | 3rd Year Comprehensive Annual Maintenance Cost | item76 | 1 | LS |