}

Vehicles and Accessories, Railway Machinery, Railway Ancillaries, Electrical Industry, Battery and Cell, Dry Cell Batteries, Electrical Work, Electrification Work, Machinery and Tools, Bearings Bushings And Gears, Bearings, Bushings, Gear Product, Hardwar-Maharashtra

Rashtriya Chemicals And Fertilizers Limited has published Vehicles and Accessories, Railway Machinery, Railway Ancillaries, Electrical Industry, Battery and Cell, Dry Cell Batteries, Electrical Work, Electrification Work, Machinery and Tools, Bearings Bushings And Gears, Bearings, Bushings, Gear Product, Hardwar. Submission Date for this Tender is 11-11-2016. Railway Ancillaries Tenders in Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

10898061
Vehicles and Accessories, Railway Machinery, Railway Ancillaries, Electrical Industry, Battery and Cell, Dry Cell Batteries, Electrical Work, Electrification Work, Machinery and Tools, Bearings Bushings And Gears, Bearings, Bushings, Gear Product, Hardwar
Tender
Indian
Maharashtra
11-11-2016

Tender Details

1 Hydraulic / Air Jacks Removal / Fitting Jobs For Dozers / Pay Loaders / Cranes. 1 Removal Of Hoses & Foundation Bolts Of Jacks. 2 Removal Of Pin By ( Heating / Cutting ) 3 Removal Of Jack With The Help Of Crane. 4 Replace The Jack Bearing. 5 Fitting Of Jack & Pin On Position & Tighten The Foundation Bolts 6 Fitting Of Hoses. 2 High Pressure Jet Cleaning Of Dozers / Pay Loaders / Cranes. 1 Connect The Hp Jet Machine. 2 Fitting The Hose Connection & Nozzle Pipe. 3 Cleaning The Heavy Equipment With Safety Precautions. 4 Remove The Hose Connection & Nozzle Pipe. 5 Disconnect The Hp Jet Machine. 3 In Dozer / Pay Loader / Crane A ) Overhauling Of Transmission Assembly 1 Remove All Covers & Levers Of Transmission Assembly 2 Remove All Shaft Assemblies With Gear & Brgs. 3 Cleaning Of All Spares Of Transmission Assembly 4 Shaft Assemblies With New Gears & Brgs. 5 Assembly Of All Covers & Levers Of Transmission Assembly B ) Replacement Of Fip, 1 Remove All Piping Of Fip. 2 Removal Of Fip By Opening Foundation & Timing Plate. 3 Fitting The New Fip & Timing Plate On Position. 4 Fitting All Piping Of Fip On Position. 5 C ) Overhauling Of Engine Cyl. Head 1 Cleaning Of Engine Cyl. Head. 2 Dismantling Of Engine Cyl. Head 3 Cleaning Of All Spares Of Engine Cyl. Head ( Spares Like Valves & Springs ) 4 Lapping The Valve Seats 5 Assembly Of Valves In Cyl. Head D ) Overhauling Of Idler Of Dozer 1 Remove The Idler Shaft & Yoke Assembly. 2 Remove The Bushing From Idler. 3 Assembly Of The Bush & Shaft In Idler. 4 Assembly Of Idler Shaft & Yoke. E ) Jobs Related To Engine Cooling / Steering System, 1 Radiator Flushing By Water. 2 Replacement Of Strainer / Filter Of Steering System 3 Replacement Of Hoses Of Cooling / Steering System F ) Replacement Of Oil Cooler For ( Engine / Steering / Clutch System ) 1 Remove Of Hoses / Piping Of Oil Cooler. 2 Remove Oil Cooler By Opening Foundation Bolts. 3 Assemble The New Cooler By Tightening The Foundation Bolts. 4 Fitting The Hoses / Piping Of Oil Cooler. G ) Overhauling Of Guide / Track Roller Of Dozer 1 Remove The End Covers & Lock Of Guide / Track Roller 2 Dismantling Of Guide / Track Roller. 3 Assembly Of Guide / Track Roller With New Bearings & Shaft. 4 Assembly Of End Covers & Lock Of Guide / Track Roller H ) Replacement Of Universal Joint Of Dozer 1 Removal Of Dozer Seat, Paddle Cross, Clutch Cross & Booster. 2 Removal Of Universal Joint. 3 Assembly Of New Universal Joint. 4 Assembly Of Clutch Booster, Clutch Cross, Paddle Cross & Driver Seat. I ) Replacement Of Lube Oil / Fuel / Air Cleaner / Transmission Filters 1 Remove Cover Of Lube Oil / Fuel / Air Cleaner / Transmission Filters 2 Replace The Filter Element. 3 Fitting Cover Of Lube Oil / Fuel / Air Cleaner / Transmission Filters With New O-Ring J ) Replacement Of Batteries / Starter. 1 Remove The Battery / Starter Wiring Connection 2 Replace The New Battery / Starter. 3 Connect The Battery / Starter Wirings. K ) Replacement Of Hydraulic Pumps. 1 Drain The Hydraulic Oil From Tank. 2 Remove The Hoses & Metallic Piping. 3 Remove Hydraulic Pump Assy. By Opening Foundation Bolts. 4 Assemble The New Hydraulic Pump Assy By Tightening The Foundation Bolts. 5 Fitting The Hoses / Piping Of Hydraulic Pump Assy. 6 Remove Air Lock From System L ) Replacement Of Pins For Steering Jack / Lifting Jack / Tilting Jack For Pay Loader. 1 Remove The Pin Locks Bolts. 2 Remove The Pin By Heating / Cutting. 3 Assembly Of New Pin.

Key Value

Document Fees
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail