BRR : 9965391
Tender Brief : Tender for Earth Work In Ordinary Soil Within 50 M Initial Lead And 1.50 M Initial Lift Including Rough Dressing And Bricking Clods To Maximum 5 Cm To 7C M And Laying In Layers Not Exceeding 0.30M In Depth And As Per The Direction Of The Eic. 14. , Filling In Foundation And Plinth With Sand Watered And Rammed As Per Opwd Specification Including All Cost Of Materials, Labour, Conveyance, Royalty, Cess, Tools And Plants Etc. All Complete Required For The Work To Finished Items. 18 , Cement Concrete (1:4:8) With 40 Mm Size Hand Broken Hard Granite Metal Including All Cost Of Materials, Labour, C... Read More
Tender Value
₹
3,86,800
Contract Value
₹ 3,90,661
Saving / Difference
₹ -3,861
▼
Submission Date
12-12-2025
Contract Date
10-04-2026
Completion Date
30 days
Participated Bidder List
29 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 2 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 4 | cnet-technologies | Bid Analytics | 3,90,661 | L2 | |||
| 5 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 6 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 7 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 8 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 9 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 10 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 11 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 12 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 13 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 14 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 15 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 16 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 17 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 18 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 19 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 20 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 21 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 22 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 23 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 24 | cnet-technologies | Bid Analytics | 3,90,661 | L1 | |||
| 25 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 26 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 27 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 28 | cnet-technologies | Bid Analytics | 3,90,661 | L3 | |||
| 29 | cnet-technologies | Bid Analytics | 3,90,661 | L3 |
Work Detail
tender for earth work in ordinary soil within 50 m initial lead and 1.50 m initial lift including rough dressing and bricking clods to maximum 5 cm to 7c m and laying in layers not exceeding 0.30m in depth and as per the direction of the eic. 14. , filling in foundation and plinth with sand watered and rammed as per opwd specification including all cost of materials, labour, conveyance, royalty, cess, tools and plants etc. all complete required for the work to finished items. 18 , cement concrete (1:4:8) with 40 mm size hand broken hard granite metal including all cost of materials, labour, conveyance, royalty, cess, t&p water for curing etc. all complete as per opwd specification required for the work to finished items. 38 , cement concrete m-20 with 20 mm and down graded size crusher broken hard granite chips including hosting and laying all cost of materials, labour, royalty, conveyance, cess, tools and plants water for curing etc. all complete as per opwd specification required for the work to finished items of work. 54 , requirement of hysd/ ms rod & labour for cutting, bending, binding, straighten and laying the grills and placing in position including cost of rod & binding weir 18-to-20-gauge, cess. 62 , rigid and smooth cantering and shuttering for cc/ reinforced cement concrete works in foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc including false work and dismantling then after casting including cost of materials, cess complete in ground floor. 67
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000