BRR : 9956650
Tender Brief : Tender for Earth Work In Ordinarysoil Within 50 M Initial Lead And 1.50 M Initial Lift Including Rough Dressing And Bricking Clods To Maximum 5 Cm To 7C M And Laying In Layers Not Exceeding 0.30M In Depth And As Per The Direction Of The Eic. 14 , Earth Work Excavation In Foundation In Ordinarysoil Within 50 M Initial Lead And 1.50 M Initial Lift Including Rough Dressing And Bricking Clods To Maximum 5 Cm To 7C M And Laying In Layers Not Exceeding 0.30M In Depth And As Per The Direction Of The Eic. 15 , Filling In Foundation And Plinth With Sand Watered And Rammed As Per Opwd Specification Inc... Read More
Tender Value
₹
3,84,100
Contract Value
₹ 3,87,961
Saving / Difference
₹ -3,861
▼
Submission Date
12-12-2025
Contract Date
07-04-2026
Completion Date
30 days
Participated Bidder List
29 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 2 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 4 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 5 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 6 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 7 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 8 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 9 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 10 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 11 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 12 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 13 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 14 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 15 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 16 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 17 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 18 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 19 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 20 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 21 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 22 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 23 | cnet-technologies | Bid Analytics | 3,87,961 | L1 | |||
| 24 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 25 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 26 | cnet-technologies | Bid Analytics | 3,87,961 | L2 | |||
| 27 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 28 | cnet-technologies | Bid Analytics | 3,87,961 | L3 | |||
| 29 | cnet-technologies | Bid Analytics | 3,87,961 | L3 |
Work Detail
tender for earth work in ordinarysoil within 50 m initial lead and 1.50 m initial lift including rough dressing and bricking clods to maximum 5 cm to 7c m and laying in layers not exceeding 0.30m in depth and as per the direction of the eic. 14 , earth work excavation in foundation in ordinarysoil within 50 m initial lead and 1.50 m initial lift including rough dressing and bricking clods to maximum 5 cm to 7c m and laying in layers not exceeding 0.30m in depth and as per the direction of the eic. 15 , filling in foundation and plinth with sand watered and rammed as per opwd specification including all cost of materials, labour, conveyance, royalty, cess, tools and plants etc. all complete required for the work to finished items. 18 , cement concrete (1:4:8) with 40 mm size hand broken hard granite metal including all cost of materials, labour, conveyance, royalty, cess, t&p water for curing etc. all complete as per opwd specification required for the work to finished items. 38 , cement concrete with m20 grade including hosting and laying all cost of materials, labour, royalty, conveyance, cess, tools and plants water for curing etc. all complete as per opwd specification required for the work to finished items of work. 54 , cement concrete (1:3:6) with 40 mm size crusher broken hard granite metal including all cost of materials, labour, conveyance, royalty, cess, t&p water for curing etc. all complete as per opwd specification required for the work to finished items. 38 , fly ash bricks 23cm x 11 cm x 8 cm size having crushing strength not less than 13 kg/cm2 in cement mortar (1:6) in foundation and plinth including cost of materials, labour, royality, conveyance, tolls and plants, water for curing etc. all complete as per opwd specification required for the work to finished item of work. 95 , rigid and smooth cantering and shuttering for cc/ reinforced cement concrete works in foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc i
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results