BRR : 973916
Tender Brief : Strengthening For Ht Abc 9Km At Arattupuzha Strengthening For Reconductoring Of 9Km 11Kv Oh Line Along The Coastal Line From Pmply To Tkpzha Bus Stand ( Kallikad To Kottemuri ) At Electrical Section , Arattupuzha , Labour Portion , Loading Ht Psc Pole To Hand Cart From The Stacking Place And Unloading The Same At Work Site . , Transporting One Ht Psc Pole By Hand Cart ( Limited To 4Km ) . , Fitting And Erecting One Ht Psc Pole In Position Incl . Fitting Cross Arm , Digging & Back Filling Pit , Drawing Earth Leads . , Fitting And Erecting One Ht Dp Using Psc Pole In Position ... Read More
Tender Value
₹
17,28,159
Contract Value
₹ 16,77,100
Saving / Difference
₹ 51,059
▲
Submission Date
01-01-2020
Contract Date
13-05-2020
Completion Date
60 days
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 17,36,128 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 16,77,100 | L1 |
Work Detail
strengthening for ht abc 9km at arattupuzha strengthening for reconductoring of 9km 11kv oh line along the coastal line from pmply to tkpzha bus stand ( kallikad to kottemuri ) at electrical section , arattupuzha , labour portion , loading ht psc pole to hand cart from the stacking place and unloading the same at work site . , transporting one ht psc pole by hand cart ( limited to 4km ) . , fitting and erecting one ht psc pole in position incl . fitting cross arm , digging & back filling pit , drawing earth leads . , fitting and erecting one ht dp using psc pole in position incl . fitting 2 channel cross arms , digging & back filling pit , drawing earth leads . , fitting and providing one ht stay for 11kv pole incl . digging & back filling pit . , fitting and providing one strut using ht psc pole incl . digging & back filling pit . , fitting and providing one ht fly stay for 11kv pole using ht psc pole incl . digging & back filling pits . , insertion of one ht psc pole in existing line incl . digging & backfilling pit , fitting cross arm , insulators , binding etc . , providing one earth using earth pipe incl . digging separate pit at standard distance away from the pole/structure & backfilling . , providing one coil earth using gi earth wire , digging separate pit at standard distance away from the pole/structure & backfilling . , fitting one set ab switch and giving connection , fitting one additional 2 . 4m/3m channel cross arm ( 75x40x6mm ) , in existing 11kv dp incl . conveyance of materials . , fitting one lt 2 line cross arm on ht or lt existing poles incl . fitting insulators and binding the same with lt line . , fitting one lt 4 line cross arm on ht or lt existing poles incl . fitting insulators and binding the same with lt line . , insertion of one ht psc pole in existing ht/lt line incl . digging & back filling pit , fitting cross arm , insulator , binding etc . , providing strut using lt psc pole incl . digging & back filling pit . , insertion of one lt psc pole in existing sph oh line incl . digging & back filling pit , fitting cross arm , insulator , binding etc . , renewal of existing damaged/old 11kv tw/rsj/rail pole with new psc pole in place and refitting of all items incl . conveyance ( except pole ) . , transferring lt sph 2/3 wire oh line to newly erected ht/lt pole and refitting all items to the new pole . , transferring lt 3ph 4/5 wire oh line to newly erected ht/lt pole and refitting all items to the new pole . , dismantling and reconnecting sph service connection from the oh line incl . lowering down the wp portion . , dismantling and reconnecting 3ph service connection from the oh line incl . lowering down the wp portion . , dismantling one section fuse , fitting one no . section fuse on lt line with dropping cables , crimping sockets , connecting with bolt&nut etc . , renewal of existing damaged/broken old 11kv stay to the existing stay rod . , straightening one slanted 11kv pole after unbinding the line and rebinding the line after work . , additional rate for refitting/redoing one shackle set and reshackling one span while renewing any type of pole . , dismantling one ordinary street light/cfl/led fitting from existing pole and refitting the same on newly erected pole and reconnecting . , dismantling one damaged lt psc/rcc pole after disconnecting stays , strut etc . and stacking the same . , dismantling ( without damage ) one lt psc/rcc pole after disconnecting stays , strut etc . and stacking the same . , dismantling one damaged lt psc/rcc strut pole incl . removal of clamps and stacking . , cutting trees beyond 30cm but upto and incl . 60cm girth , cutting branches , removing root completely and stacking ( where space for falling trees is not enough ) . , cutting trees beyond 60cm but upto and incl . 120cm girth , cutting branches , removing root completely and stacking ( where space for falling trees is not enough ) . , loading ht psc pole from the stacking place and unloading the same at work site ( transport by vehicle ) . , transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading .
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | Generalconditionsoftender9Km | Tender Documents - General conditions of tender |
| Download | Tendernotice_1 | Tender Documents - Notice Inviting Tender |
| Download | F20EF314-1A43-48DC-90C2-B581A9DE5614 | Tender Documents - Tender Notice |
| Download | NIT9Km | Tender Documents - NIT revised |
| Download | BOQ_462018 | Tender Documents - Schedule |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000