BRR : 922724
Click Here To View Tendering Authority. Aoc City/State :  Arattupuzha, Kerala
Tender Brief : Strengthening For Ht Abc 5 . 5Km At Arattupuzha Strengthening For Reconductoring Of 5 . 5Km 11Kv Oh Line Using Abc , Along The Coastal Line From Kallikad Tr To Kochiyudejetty Under Electrical Section , Arattupuzha , Labour Portion , Loading Ht Psc Pole To Hand Cart From The Stacking Place And Unloading The Same At Work Site . , Transporting One Ht Psc Pole By Hand Cart ( Limited To 4Km ) . , Fitting And Erecting One Ht Psc Pole In Position Incl . Fitting Cross Arm , Digging & Back Filling Pit , Drawing Earth Leads . , Fitting And Erecting One Ht Dp Using Psc Pole In Positio... Read More
Tender Value
9,52,373
Contract Value
₹ 9,11,421
Saving / Difference
₹ 40,952 ▲
Submission Date
01-01-2020
Contract Date
13-05-2020
Completion Date
60 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 9,52,373 L2
2 cnet-technologies Bid Analytics 9,11,421 L1
Work Detail
strengthening for ht abc 5 . 5km at arattupuzha strengthening for reconductoring of 5 . 5km 11kv oh line using abc , along the coastal line from kallikad tr to kochiyudejetty under electrical section , arattupuzha , labour portion , loading ht psc pole to hand cart from the stacking place and unloading the same at work site . , transporting one ht psc pole by hand cart ( limited to 4km ) . , fitting and erecting one ht psc pole in position incl . fitting cross arm , digging & back filling pit , drawing earth leads . , fitting and erecting one ht dp using psc pole in position incl . fitting 2 channel cross arms , digging & back filling pit , drawing earth leads . , fitting and providing one ht stay for 11kv pole incl . digging & back filling pit . , fitting and providing one strut using ht psc pole incl . digging & back filling pit . , insertion of one ht psc pole in existing line incl . digging & backfilling pit , fitting cross arm , insulators , binding etc . , providing one earth using earth pipe incl . digging separate pit at standard distance away from the pole/structure & backfilling . , providing one coil earth using gi earth wire , digging separate pit at standard distance away from the pole/structure & backfilling . , fitting one set ab switch and giving connection , fitting one additional 75x40mm , 1 . 8m channel cross arm in existing single pole incl . conveyance of materials . , fitting one additional 2 . 4m/3m channel cross arm ( 75x40x6mm ) , in existing 11kv dp incl . conveyance of materials . , fitting one lt 2 line cross arm on ht or lt existing poles incl . fitting insulators and binding the same with lt line . , fitting one lt 4 line cross arm on ht or lt existing poles incl . fitting insulators and binding the same with lt line . , renewal of existing damaged/old 11kv tw/rsj/rail pole with new psc pole in place and refitting of all items incl . conveyance ( except pole ) . , renewal of existing damaged/old 11kv psc/rcc pole with new psc pole in place and refitting of all items incl . conveyance ( except pole ) . , renewal of existing damaged/old 11kv stay with new stay in place incl . excavation & backfilling of pit and conveyance . , transferring lt sph 2/3 wire oh line to newly erected ht/lt pole and refitting all items to the new pole . , transferring lt 3ph 4/5 wire oh line to newly erected ht/lt pole and refitting all items to the new pole . , dismantling and reconnecting sph service connection from the oh line incl . lowering down the wp portion . , dismantling and reconnecting 3ph service connection from the oh line incl . lowering down the wp portion . , dismantling ( without damage ) lt stay incl . digging pit in all classes of soil and backfilling , dismantling one section fuse from distribution box , fitting one no . section fuse on lt line with dropping cables , crimping sockets , connecting with bolt&nut etc . , renewal of existing damaged/old 11kv stay with new stay in place incl . excavation & backfilling of pit and conveyance . , renewal of existing damaged/broken old 11kv stay to the existing stay rod . , straightening one slanted 11kv pole after unbinding the line and rebinding the line after work . , additional rate for refitting/redoing one shackle set and reshackling one span while renewing any type of pole . , dismantling one ordinary street light/cfl/led fitting from existing pole and refitting the same on newly erected pole and reconnecting . , dismantling one damaged lt psc/rcc pole after disconnecting stays , strut etc . and stacking the same . , dismantling ( without damage ) one lt psc/rcc pole after disconnecting stays , strut etc . and stacking the same . , loading ht psc pole from the stacking place and unloading the same at work site ( transport by vehicle ) . , transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading . , providing concrete muffing ( 0 . 45x0 . 45x1 . 5m ) inclusive of cost of all material ( as per specification ) .
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 8ff1feb3-bdbb-417d-af24-d5bebe8f3a38
Download boqcomparativechart
Download WO_141
Download File Name File Description
Download NIT5_5Km Tender Documents - Revised NIT
Download BOQ_461863 Tender Documents - Schedule
Download F7E981F7-1292-40AB-A3E7-DAFBEEE83F4D Tender Documents - Tender Notice
Download Generalconditionsoftender5_5km Tender Documents - General conditions of tender
Download Tendernotice_1 Tender Documents - Notice Inviting tender
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000