BRR : 9329293
Click Here To View Tendering Authority. Technical Bid City/State :  Thiruvallur, Tamil Nadu
Tender Brief : Tender For Nctps Ii Mi Circle Bm Iii Unit Ii Aoh 2025 26 Of Id Fan 2A And 2B; 1 Charges for opening of fan casing inspection manual doors, water washing of ID fan internals from fan suction to discharge (from fan suction gate to discharge gate) and complete inspection of fan internals such as shaft, impeller with liner assembly and fan inner casing and attending minor repair as directed by Engineer in chargework including the cost of the consumables and T&Ps. 2 Charges for arresting of shaft assembly, loosening of fan DE/NDE Brg housing bolts and tapper locking pins. Dimantling of bearing ... Read More
Tender Value
Ref. Document
Submission Date
26-06-2025
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
Work Detail
tender for nctps ii mi circle bm iii unit ii aoh 2025 26 of id fan 2a and 2b; 1 charges for opening of fan casing inspection manual doors, water washing of id fan internals from fan suction to discharge (from fan suction gate to discharge gate) and complete inspection of fan internals such as shaft, impeller with liner assembly and fan inner casing and attending minor repair as directed by engineer in chargework including the cost of the consumables and t&ps. 2 charges for arresting of shaft assembly, loosening of fan de/nde brg housing bolts and tapper locking pins. dimantling of bearing outer top housing assembly, brg housing cooling water inlet & outletflexible hoses and cleaning of bearing inner housing. taking initial radial and axial clearance readings to record, lifting of journal brgs and releasing of oil control rings. complete inpection of journal bearings, bearing inner & outer housings, shaft, bearing mounting area, brg housing acw flexible hoses & its assembly, oil control rings and sealing collars. take the final radial clearance of fan brg to brg housing and axial clearance to record. remounting of fan bearings, oil control ring, acw flexible inlet/outlet hoses, brg outer top housing.refixing & tightening of housing bolts and tapper locking pin, boxing up of fan de/nde brg housings and normalizing as directed by engineer in charge including the cost of consumables and t&p’s. 3 charges for releasing of fan & motor coupling guard, decouple the motor from fan, fixing of chain block for rotating/locking the fan shaft assembly, taking the pre-alignment readings of fan & motor for initial reference. align the fan and motor by axially and radially and checking the final readings are within the allowable limits.checking the radial and axial clearances for de & nde radial seal assembly and attending minor repair work. checking the tightness of fan conical cover plate bolts, impeller mounting bolts and impeller liner assembly & its countersunk bolts. couple the motor with fan and refixing of motor/fan coupling guard for normalizing the system as directed by the engineer in charge including consumables and t&p’s. 4 charges for disconnecting the igv drive shaft from actuator and disconnecting all the link rod assembly from connecting rod. complete cleaning and inspection of igv actuator gear box by removal of existing lubricant and cleaning of links & flaps by using service air, made freeness of all link rod assembly by frequent opening and closingof each flaps using chain block. lubricating the gear box, drive shaft, links & flaps and reassembling to complete and ensure the freeness of igv operation by manually and electrically including consumables and t&p’s. 5 charges for dismantling of lube oil lines, suction strainers, line filters, lub oil pumps, motor & pump couplings & its spiders and draining of lub oil tank. cleaning of lube oil coolers, checkingthe condition of oil cooler ‘o’ rings & gaskets and lub oil line & acw valve fittings. attending oil/acw leaks and reassembling of cooler assembly. complete cleaning & inspection of lube oil tank, connecting the lube oil line & its fittings to fan bearing housings, filling of new/old lube oil upto the adequate level and boxing up the lube oil tank. conducting pumps trial run and normalizing the lub oil system as directed by the engineer in charge including the cost of transportation, consumables and t&p’s.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download techsummary_682526 aoc document
Download ad5a859b-df78-40fc-8e13-45f1f449a53d technicalevaluation notice
Download File Name File Description
Download 7117b105-bd98-4692-9f76-088fbdf87e15 Tender Documents
Download BOQ_682526 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Technical Evaluation In Progress

Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.

TechnicalBid
Similar Tenders Results
TenderDetail
Loading tenders