BRR : 9274998
Tender Brief : Maintenance Work Daiviya Apda Work Edsd- Jainpur-1 Work By Loading 8.5 Meter Long Pcc Pole From Power Storage Center Panki / Jainpur On Own Vehicle. Transporting To The Site And Keeping It Safely Off ( By Unpaved Road ) . 2 From Power Storage Center Panki / Jainpur, Line Materials Such As Conductors, Cos Arm Insulators Etc. Are Transported To The Work Site By Loading On Own Vehicle And Safely Unloaded ( By Unpaved Road ) . 3 Pcc Poles With All Accessories Like Cross Arm By Digging Pit In Place Of Broken / Damaged Poles. Installing Earthing Rod By Tying Disc Pin Insulator Etc. 45... Read More
Tender Value
₹
Ref. Document
Submission Date
30-03-2023
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics |
Work Detail
maintenance work daiviya apda work edsd- jainpur-1 work by loading 8.5 meter long pcc pole from power storage center panki / jainpur on own vehicle. transporting to the site and keeping it safely off ( by unpaved road ) . 2 from power storage center panki / jainpur, line materials such as conductors, cos arm insulators etc. are transported to the work site by loading on own vehicle and safely unloaded ( by unpaved road ) . 3 pcc poles with all accessories like cross arm by digging pit in place of broken / damaged poles. installing earthing rod by tying disc pin insulator etc. 45 installation of new section double pole in place of broken / damaged double pole. , repair work of secban double pole. 6 tightening the damaged stay by renosing. 7 , tightening of loose wires ( each wire ) of 33 kv line. tightening of loose wires of lt and 11 kv line ( each wire ) 8 straighten the slanted poles of 33 / 11 kv line / lt line as per respo standard. 9 stand erect while tying accessories. 10 giving clearance while pruning the trees of 33 / 11 kv and lt line. ac in 33 / 11 kv line s. r. striking and sagging in all three phases by stretching the weasel conductor 11 jumpering and earthing by tying insulators ( each wire ) . replacement of damaged cross arm. 12
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results