BRR : 9145673
Click Here To View Tendering Authority. Technical Bid City/State :  Kanpur Nagar, Uttar Pradesh
Tender Brief : Giving Connection To Kem Hall Releasing 50 Kw And Kotwali Building Releasing 17 Kw Load Use For Commercial In Single Point And Replacement Of L.T. Line To L.T. Abc Under Eudd-Phoolbagh Div.- 1 Loading Unloading & Carriage Of Material From Store Kesco To Work Site. 2 Ab Conductor 3X120+1 / 16+1X95 3 25 & 100 Kva. T / F 11 / 0.433Kv. 4 S.T. Poleforh.T. & L.T.Line As Per Respo Lucknow. Stock Issue Rate 2021-22 5 H.T. Xlpe Cable 3X70sqmm. 6 Other Item Etc. 7 Supply By Contractor 8 Stone Pad 300×300×75Mm. 9 Danger Board With Clamp 10 Earthing Complete 11 Number Plate 12 11 K... Read More
Tender Value
8,51,852
Submission Date
25-07-2022
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics
Work Detail
giving connection to kem hall releasing 50 kw and kotwali building releasing 17 kw load use for commercial in single point and replacement of l.t. line to l.t. abc under eudd-phoolbagh div.- 1 loading unloading & carriage of material from store kesco to work site. 2 ab conductor 3x120+1 / 16+1x95 3 25 & 100 kva. t / f 11 / 0.433kv. 4 s.t. poleforh.t. & l.t.line as per respo lucknow. stock issue rate 2021-22 5 h.t. xlpe cable 3x70sqmm. 6 other item etc. 7 supply by contractor 8 stone pad 300×300×75mm. 9 danger board with clamp 10 earthing complete 11 number plate 12 11 kv disc insulater with fitting for h.t. line taping 13 dead & clamp with eye hook and holding clamp 14 dead & clamp with eye hook 15 dead in sealing cap 16 alu. lug 3×70 sqmm. 17 l.t.d.b. c type box 18 g.i. pipe / hdpe pipe 6 dia 19 errection of material 20 errection of ht double pole structure fitting of all channelsbrackets, insulators and other hardware fittings etc. 21 errection of lt. single pole structure fitting of all brackets, insulators and other hardware fittings etc. 22 grouting of ht & lt pole ith cement, brick ballast and coarse sand as per standard specification. 23 making of pole plinth as per standard specification. 24 painting of ht and lt pole one coat with red oxide and 2 coats with isi mark enamel paint. 25 earthing of supports as per standard specification 26 fixing of stay rod and its errection and grouting by fitting of straight line stay wire and its proper binding and tighting etc. 27 opening of h.t. jumpher from the existing 3 phase 3 wire h.t. overhead line for errection work 28 opening of l.t. jumpher from the existing 3 phase 3 wire l.t. overhead line for errection work 29 digging of cable trunch pakka as per norms for laying 11 kv xlpe cable 30 laying of g.i. pipe in digging trunch 31 laying of 11 kv xlpe cable in above digging trunch covering with brick and back filling and proper rmming 32 laying of 11 kv xlpe cable through g.i. pipe in digging trunch 33 making o / d joints of 11 kv xlpe cable 34 making and mounting l.t. distribution box 35 errection of distribution t / f on plinth / double pole structure 36 errection of h.t. jumpher from few set to h.t. bushing of the transformer 37 making of h.t. section points by brackets clamps and insulators tighting of line binding of conductor and proper connection 38 making of h.t. jumpher with 3 phase 3 wire h.t. overhead line after errection 39 newly network system ( old systom to new systom encrgyes ) 40 panting of m.s. structure fitting on pole such as channel single bracket 41 supply of 60 mm. dia classb g.i. pipe 40 long including m.s. flat 50×6mm. along with all related materials required for distribution t / f earthing work. 42 boring 60 deep & connection of neutral busing with g.i. pipe through m.s. flat / earth wire with proper connection arrangement. 43 fabrication and ercetion of distribution t / f fencing of frame size 3×2.4 mtr. including cost of m.s. angle size 40×40×5 and m.s. flat size 35×5, fixing of welded steel wire fabric on steel frams by welding of 10 swg wire fabric, including painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including evening of oil & dust. 44 laying stringing, tensioning and binding of dog conductor for h.t. / l.t. o.h. 45 laying stringing, tensioning and binding of earth g.i. wire. 46 erection of distribution t / f on plinth / d / pole structure. 47 fitting of l.t.d.b. by brackets & clamps on double pole structure & l.t. cable connection from t / f cable to l.t.d.b. 48 making of ht / lt shackelpoint 49 opening of ht / lt jumphering. 50 making of ht / lt jumphering 51 road restroration charges for pakka roads will be paid nagar nigam / pwd 52 newly network system ( old systom to new systom encrgyes ) 53 loading unloading & carriage of material fromwork site to store kesco . 54 old and use conductor 55 old and used pole
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download technical_1148721 aoc document
Download techsummary_1148721 aoc document
Download 44fd953f-682b-4e43-b5d6-d7fc7ed9fb8a technicalevaluation notice
Download File Name File Description
Download 5cd6524a-06c7-48b0-98ee-e2d3256044f4 Tender Documents
Download BOQ_1148721 Tender Documents
Download tenderdocument6 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Technical Evaluation In Progress

Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.

TechnicalBid
Similar Tenders Results
TenderDetail
Loading tenders