BRR : 8733049
Tender Brief : Uprating Of 132Kv S/C Jhunjhunu-Bissau Line From 132 Kv Gss Jhunjhunu To 132 Kv Malsisar Line Crossing Uprating Of 132Kv S/C Jhunjhunu-Bissau Line From 132 Kv Gss Jhunjhunu To 132 Kv Malsisar Line Crossing ( With Dismantling Of Existing 132 Kv H Pole Line ) , Detail Survey As Per Tentative Route Of Line Which Includes:- , Pegging Of Line Route , Providing Of Survey Pillar At An Interval Of 3-4 Km In The Line Route With Required Jungle Clearance For Survey , Profile Prepration Of Approved Route On Graph Sheet And Marking Of Offset On Either Side Of Line , Marking Of Side Clearance Fo... Read More
Tender Value
₹
56,96,882
Submission Date
17-03-2020
Participated Bidder List
5 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics |
Work Detail
uprating of 132kv s/c jhunjhunu-bissau line from 132 kv gss jhunjhunu to 132 kv malsisar line crossing uprating of 132kv s/c jhunjhunu-bissau line from 132 kv gss jhunjhunu to 132 kv malsisar line crossing ( with dismantling of existing 132 kv h pole line ) , detail survey as per tentative route of line which includes:- , pegging of line route , providing of survey pillar at an interval of 3-4 km in the line route with required jungle clearance for survey , profile prepration of approved route on graph sheet and marking of offset on either side of line , marking of side clearance for hills , sand dunes etc . as per specification and tower scheduling . , checked survey as per approved route of line which includes:- , re-checklng of the line route as per approved profile , chainage , tower center marking , pit marking , bisection of angle tower as required at site . , excavation excavation , excluding back filling , including shoring , shuttering , dewatering etc up to the required depth as per foundation specification/drawings , normal soil , setting of template & stub/anchor bolt: setting of template & stub/anchor bolt & removal after concreting , excluding cost of excavation and concreting but including back filling with excavated/borrowed earth ( with lead & lift ) in layers with ramming and watering as per specifications . , 132 kv s/c tower up to +6m extension , tower including extension upto 9 meters , concreting providing and laying cement concrete for all types of foundation as per latest iss:456 including cement , sand , stone aggregate 20mm nominal size , water etc . , preparing surfaces , shuttering , mixing , placing , ramming , curing , finishing as per specification and drawings . , 1:3:6 mix , 1:2:4 mix , 1:1 . 5:3 mix , steel reinforcement , cutting , bending , welding of joints if required , fixing and placing of steel reinforcement as per specification and drawings including material , earthing earthing of towers with pipe type earthing excluding the supply of pipes , wires , flats & connectors , but including coke/charcoal , etc . , excavation , augering and backfilling in all types of soil . , erection of towers erection of super structures including d-shackles , acd , hangers , u-bolts , step bolts , danger plate , phase plate , number plate etc . also including tack welding of bolts & nuts upto bottom cross arm/beam level including application of zinc rich paint , 132 kv s/c tower , erection of towers including extension upto 09 meters , conductor stringing :- stringing of acsr panther including hoisting of insulator string , laying , jointing & tensioning of conductor , clamping with armour rods and fixing of vibration damper per route km of the line . , 132 kv , single conductor , earth wire stringing :- stringing of galvanised steel stranded wire including laying , jointing & tensioning , clamping , clipping and fixing vibration damper and earth bond etc . , 132 kv , one no 7/3 . 15 galvanised wire , dismantling of towers:- dismantling of super structures including extensions , having tag welded bolts & nuts including d shackles , hangers , u bolts , acd . danger plate , phase & number plate of tower including transportation form site t our store and stacking of all material , ( a ) 132kv and 220kv s/cand d/c all types . , destringing of conductor / earthwire:-destringing of acsr panther conductor : dismantling of vibration dampers and armour rods , removal of conductor from clamps and fitting in rollers , detensioning , dehoisting of insulator string as required and collecting the material & depositing the same in our store and stacking . , single conductor , destricting of earthwire:- dismantling or earth bonds , vibration dampers , declipping & fitting in rollers , detensioning and collecting the material & depositing the same in our store and stacking . , one no . 7/3 . 15 mm galvanized wire
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 9716634_8486_15022020 | Tender Documents |
| Download | 36354AF6-47EE-4151-80FA-3EEA5586B04E | Tender Documents - Tender Notice |
| Download | Tendernotice_1 | Tender Documents - Uprating of 132KV S/C Jhunjhunu-Bissau Line from 132 KV GSS Jhunjhunu to 132 KV Malsisar line Crossing (With dismantling of existing 132 KV H pole |
| Download | BOQ_312801 | Tender Documents - BOQ of uprating work of existing 132KV Jhunjhunu-Bissau line into conventional line |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.