BRR : 8224127
Tender Brief : Transportation Of Different Items And Daily Maintenance Of Of Belt Conveyor (60Days)Of Xviseam At Moonidih Colliery, W.J. Area Transportation Of Different Items And Daily Maintenance Of Of Belt Conveyor (60Days)Of Xviseam At Moonidih Colliery, W.J. Area-Transportation of different items and Daily maintenance of of belt conveyor (60days)of XVIseam at Moonidih Colliery, W.J. Area 2 Manual Transportation of one burnt 110kw motor from D-17 B/G jn. of 6th D/R to surface in XVI(T) seami.e. 80m manual transportation upto 7th D/R and then by Track & Haulages. Analysis: (1)manshift required/20m of ma... Read More
Tender Value
₹
10,91,482
Contract Value
₹ 15,34,262
Saving / Difference
₹ -4,42,780
▼
Submission Date
12-09-2025
Contract Date
08-11-2025
Completion Date
60 days
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 15,34,262 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 11,46,055.64 | L2 |
Work Detail
transportation of different items and daily maintenance of of belt conveyor (60days)of xviseam at moonidih colliery, w.j. area transportation of different items and daily maintenance of of belt conveyor (60days)of xviseam at moonidih colliery, w.j. area-transportation of different items and daily maintenance of of belt conveyor (60days)of xviseam at moonidih colliery, w.j. area 2 manual transportation of one burnt 110kw motor from d-17 b/g jn. of 6th d/r to surface in xvi(t) seami.e. 80m manual transportation upto 7th d/r and then by track & haulages. analysis: (1)manshift required/20m of manual transport=8 unskilled (2) arm trolleys required=1, manshift/trolley=8 unskilled cost involved/mt=(1367.6.6x8)/20=rs.547.04/m 3 transportation ofburnt 110kw motor from d-17 b/g jn. of 7th d/r to surfaceby track & haulages.analysis:arm trolleys required=1trolleymanshift required /arm trolley=8 unskilled (including loading) cost involved=(1367.6.6x8)=rs.10940.8/trolley 4 loading,transportation & unloading of 400mt pvc belt from d-17 t/g,7th d/r jn. to d-18 b/g,10th d/r jn. via track & haulage and laying thereof on 10th d/r conveyor belt .manshift required for loading=12 unskiled/200m belting manshift required for transporting upto 10th d/r via track & haulage=6 unskilled/trolley laying,fitting at 10th d/r conveyor.manshift required=14unskilled /200m beltingtotal =12+6+14=32manshift./200m belting total manshift required for 400m belting=64 unskilled cost involved @rs1367.6/unskilled manshift. 5 manual transportation of 170 m(50 sq.mm) power cable from d-17 b/g,6th d/r jn. to d-18 b/g,6th d/r jn.and hanging it in 6th d/r gallery . analysis:manshift required/shift = 10 unskilled/shiftcost involved=(1367.6x10)=rs.13676.00/shift 6 transportationof a standby belt starter from e-9 t/g(4th d/r jn.) to d-17 b/g via track & haulage and manual transportation analysis: manshift required for transportation of starter = 8 unskilled manshift/shift cost/mt= 8*1367.60 =rs.10940.8 7 manual transportation of one burnt 37kw motor from e-9 t/g jn. of 6th d/r to surface by track & haulageanalysis:arm trolleys required=1,manshift/trolley=6 unskilled for 2 shiftscost involved=(1367.6.6x6)=rs8205.6/shift 8 transportation of different items such as units of starters,input shafts & bevel of gear boxes,jointer machines,chain pulleys from various locations in xvi(t) seam.cost involved @ rs1367.6.6/unskilled manshift 9 dismantling of pony belt d/h at e-9 b/g analysis:total unskilled manshift requred/shift=8.cost/shift=(8*1367.60)=rs10940.8/shift 10 manual transportationof motor,gear box,gib drum,pony frames,snub pulley,starter of pony drivehead 50m outby .analysis: manshift required for manual transportation of items/50m =10 unskilled manshift/shift/item cost/item= 10*1367.60/item =rs.13676/item 11 manual transportation of 200 no. of top rollers and 30 no. of bottom rollers(1000mm) from d-18 b/g to 6th d/r bunker belt and replacing the wornout rollers & cleaning below the bottom belt.analysis:unskilled manshift required/shift=8 unskilled.cost/shift=(8*1367.60)=rs10940.8/shift 12 regular maintenance of 5 no.of conveyor belt at xvi(t) seam including cleaning along driveheads,alignment of belt structure, joint making,drain management,assisting the fitters in other related jobs etc.analysis: unskilled manshift required=6/shift cost involved=(1367.6 x 6)=rs.8205.6/day 13 add cp 15% as per clause 4.17.1 of civil eng. manual & bccl sor 14 cmpf 15 cmpf, pension and admin. charge of employee un skilled 16 total impact of gst for the purpose of ctc
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results