BRR : 5207089
Click Here To View Tendering Authority. Aoc City/State :  moonidih, Jharkhand
Tender Brief : Transportation Of Damaged Belt Materials From Different Location & Time From Xvi ( T ) Seam To Surface Work Shop & Transportation Of Repaired Belt Meterials From Surface Work Shop To Same Locations In Xvi ( T ) Seam, 500 Mh At Moonidih Colliery, W. J. Area-Transportation Of Damaged Belt Materials From Different Location & Time From Xvi ( T ) Seam To Surface Work Shop & Transportation Of Repaired Belt Meterials From Surface Work Shop To Same Locations In Xvi ( T ) Seam, 500 Mh At Moonidih Colliery, W. J. Area 2 Manual Transportation Of Belt Metrials From Different... Read More
Tender Value
6,95,957
Contract Value
₹ 9,99,601
Saving / Difference
₹ -3,03,644 ▼
Submission Date
29-01-2024
Contract Date
07-08-2024
Completion Date
40 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 9,99,601 L1
2 cnet-technologies Bid Analytics 7,58,593.57 L2
Work Detail
transportation of damaged belt materials from different location & time from xvi ( t ) seam to surface work shop & transportation of repaired belt meterials from surface work shop to same locations in xvi ( t ) seam, 500 mh at moonidih colliery, w. j. area-transportation of damaged belt materials from different location & time from xvi ( t ) seam to surface work shop & transportation of repaired belt meterials from surface work shop to same locations in xvi ( t ) seam, 500 mh at moonidih colliery, w. j. area 2 manual transportation of belt metrials from different location & required manshift mentioned as below:a. fromd-17 bg / 6dip jn ( near bunker ) to d-17 bg / 7th rise jni ) 2no. 110kw motor = 6unskilled x 5shift =30x 2 no=60unskilled manshift.b. from d-18 bg / 10th rise jn to 5th rise / 400mh main line jn. ii ) 3no. kg-8 motor = 3unskilled x 6shift =18x 3 no=54 unskilled manshift. iii ) 2no.kg-8 gear box = 3unskilled x 6shift =18x 2 no=36 unskilled manshift. iv ) 6no.drive driven pulley ( 2no n pulley / 8 unskilled ) =8 x6 / 2 =24unskilled manshift. v ) 2no.tail end drum =8 unskilled manshift. vi ) 1 no.kg-8 base frame=10 x2 shift=20unskilled manshift. vii ) 1 no kg-8 p-70 switch =8unskilled manshift.total manshift=210 unskilled manshift 3 transportation of belt metrials through track / haulages from different location mentioned as below: a. from 7th rise / d-17 bg to 500mh main line & up to pit bottomi ) 2no. 110kw motor = 6unskilled x 2 no=12unskilled manshift.b. from5th rise / 400mh main line to pit bottom by loco 3no. kg-8 motor , 2no.kg-8 gear box , 6no.drive driven pulley , 2no.tail end drum, 1 no.kg-8 base frame, 1 no kg-8 p-70 switch total manshift=12 unskilled 4 lifting from pit bottom to surface work shop: 2no. 110kw motor=6x2=12unskilled 1motor+ 2d / driven=6unskilled 1motor+ 2tail end drum=6unskilled2gear box+ 4d / driven=6x2=12unskilled 1motor+ 1p-70switch=6unskilled1base frame=6unskilled total=48unskilled manshift 5 transportation of repaired belt metrials from work shop at surface to pit bottom :2no. 110kw motor=6x2=12unskilled 1motor+ 2d / driven=6unskilled 1motor+ 2tail end drum=6unskilled 2gear box+ 4d / driven=6x2=12unskilled 1motor+ 1p-70switch=6unskilled1base frame=6unskilled total=48unskilled manshift 6 transportation of repaired belt metrials through track / haulages mentioned as below: a.from pit bottom to7th rise / d-17 bg jn. via 500mh main line i ) 2no. 110kw motor = 6unskilled x 2 no=12unskilled manshift. b. frompit bottom to 5th rise / 400mh main line by loco3no. kg-8 motor , 2no.kg-8 gear box , 6no.drive driven pulley , 2no.tail end drum, 1 no.kg-8 base frame, 1 no kg-8 p-70 switch total manshift=12 unskilled 7 transportation of repaired belt metrials manually as below: a. from 7th rise / d-17 bg to 6th rise / d-17 bg i ) 2no. 110kw motor = 6unskilled x 5shift =30x 2 no=60unskilled manshift.b.from 5th rise / 400mh main line jn.to d-18 bg / 10th rise jn.: ii ) 3no. kg-8 motor = 3unskilled x 6shift =18x 3 no=54 unskilled manshift. iii ) 2no.kg-8 gear box = 3unskilled x 6shift =18x 2 no=36 unskilled manshift.iv ) 6no.drive driven pulley ( 2no n pulley / 8 unskilled ) =8 x6 / 2 =24unskilled manshift.v ) 2no.tail end drum =8 unskilled manshift. vi ) 1 no.kg-8 base frame =10 x2 shift=20unskilled manshift. vii ) 1 no kg-8 p-70 switch.=8unskilled manshift.total manshift=210 unskilled manshift 8 cmpf 9 cmpf, pension and admin. charge of employee un skilled 10 total impact of gst for the purpose of ctc
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 7e4816a3-c204-4fdf-8a4e-f5386fa257ee
Download AOC49
Download boqcomparativechart
Download finsummary_308617
Download techsummary_308617
Download File Name File Description
Download 34af9167-3823-4cfd-b770-ca741f85edd6 Tender Documents
Download BOQ_308617 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000