BRR : 8212107
Tender Brief : Replacement Of Defective Spares By New One To Suit In The Extg. V.T. Pump No-1 Including Reassembling And Alignment At Llps Under Grww.- 1 DISMANTLING OF MOTOR FROM THE EXISTING SOLE PLATE BY REMOVAL OF POWER CABLE COUPLING BOLTS AND FOUNDATION BOLTS AND AS PER SPECIFICATION & DIRECTION OF EIC. (FAIR RATE APPROVED BY DG (W.S.) DATED 06/05/2019) 2 REMOVAL OF THE MOTOR STOOD AND TBH UNIT AND STACKING THEM IN REPAIRING BAY AS PER DIRECTION OF THE EIC. (FAIR RATE APPROVED BY DG (W.S.) DATED 07/03/2019) 3 REMOVAL OF THE GLAND PACKING BOX ASSEMBLY AND STACKING THE SAME ON THE SUITABLE PLACE AS PE... Read More
Tender Value
₹
2,49,496
Contract Value
₹ 2,48,249
Saving / Difference
₹ 1,247
▲
Submission Date
14-06-2025
Contract Date
06-11-2025
Completion Date
7 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 2,53,862 | L3 | |||
| 2 | cnet-technologies | Bid Analytics | 2,48,249 | L1 | |||
| 3 | cnet-technologies | Bid Analytics | 2,51,991 | L2 |
Work Detail
replacement of defective spares by new one to suit in the extg. v.t. pump no-1 including reassembling and alignment at llps under grww.- 1 dismantling of motor from the existing sole plate by removal of power cable coupling bolts and foundation bolts and as per specification & direction of eic. (fair rate approved by dg (w.s.) dated 06/05/2019) 2 removal of the motor stood and tbh unit and stacking them in repairing bay as per direction of the eic. (fair rate approved by dg (w.s.) dated 07/03/2019) 3 removal of the gland packing box assembly and stacking the same on the suitable place as per direction of the eic. (fair rate approved by dg (w.s.) dated 07/03/2019) 4 disconnection of the pump discharge branch from the delivery line and lifting the total pump assembly after removing top screw between a v discharge head and sole plate by removing top column. discharge elbow assembly including all shaft, coupling and sleeve & the base assembly stage by stage resting the pump assembly on proper support (required ms channels to provide support to pump assembly and all mechanical tools and tackles e.g. 2nos. 10 ton hydraulic jacks, gas cutter etc. as needed to execute this work are has been provided by the contractor) as per direction of eic. (fair rate approved by dg (w.s.) dated 07/03/2019 5 dismantling of the spares with refitting by new one with the arrangement of proper tools & tackles.i) ratchet pin 8 nos. (fair rate approved by dg (w.s.) dated 07/03/2019) 6 dismantling of the spares with refitting by new one with the arrangement of proper tools & tackles.i) tbh o ring 1 set. (fair rate approved by dg (w.s.) dated 07/03/2019) 7 dismantling of the spares with refitting by new one with the arrangement of proper tools & tackles.i) line shaft sleeve -4 nos. (fair rate approved by dg (w.s.) dated 07/03/2019) 8 dismantling of the spares with refitting by new one with the arrangement of proper tools & tackles.i) line shaft bearing - 4 nos. (fair rate approved by dg (w.s.) dated 07/03/2019) 9 dismantling of the spares with refitting by new one with the arrangement of proper tools & tackles.i) gland packing set -1 set. (fair rate approved by dg (w.s.) dated 07/03/2019) 10 dismantling of the spares with refitting by new one with the arrangement of proper tools & tackles.i) gasket for column pipe-1 set (fair rate approved by dg (w.s.) dated 07/03/2019) 11 dismantling of the spares with refitting by new one with the arrangement of proper tools & tackles. i) caps screw, column pipe- 1 set (fair rate approved by dg (w.s.) dated 07/03/2019) 12 supply of tbh oil (servo 68 ), make-iocl (fair rate approved by dg (w.s.) dated 07/03/2019) 13 reinstallation of the motor stool with proper alignment with line shaft and making connection of the cooling pipe, pressure gauge (contractors supplied) etc. all complete as per direction of the eic. (fair rate approved by dg (w.s.) dated 07/03/2019) 14 ttrial run of the pump for 30 hrs and executing necessary rectification/aduustment as per direction of the eic. (fair rate approved by dg (w.s.) dated 07/03/2019) 15 estimated amount 16 add: 9%sgst 17 add: 9%cgst 18 1% lwc
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results