BRR : 7487742
Tender Brief : Tender for protection work under special repair of Ahraura Chakia to Talra road, 1 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (Including all taxes, labour cess, T&P and material but Excluding GST) 2 Plain Cement Concrete (PCC) M-10(1:3:6 Nominal Mix) in open foundation complete as... Read More
Tender Value
₹
37,13,000
Contract Value
₹ 25,46,614
Saving / Difference
₹ 11,66,386
▲
Submission Date
31-12-2024
Contract Date
21-02-2025
Completion Date
60 days
Participated Bidder List
4 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | 29,87,871.98 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 29,83,124.68 | L2 | |||
| 4 | cnet-technologies | Bid Analytics | 25,46,614 | L1 |
Work Detail
tender for protection work under special repair of ahraura chakia to talra road, 1 excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3 (including all taxes, labour cess, t&p and material but excluding gst) 2 plain cement concrete (pcc) m-10(1:3:6 nominal mix) in open foundation complete as per drawing and techanical specification clause 802.(including all taxes, labour cess, t&p and material but excluding gst) 3 stone masonery work(1:4 cement mortar) in cement mortar in foundation complete excepting pointing and plastering, as per drawing and technical specification clause 702, 704, 1201 & 1203(including all taxes, labour cess, t&p and material but excluding gst) 4 providing and laying filter media with granular crushed aggregatea as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wingwall return wall to the full height compacted specification clause 1204(including all taxes, labour cess, t&p and material but excluding gst) 5 providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification clause 1302 (including all taxes, labour cess, t&p and material but excluding gst) 6 construction ofsubgrade and earthen shoulders with approved material obtained from borrow pits with all lift and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 303.1 (including all taxes, labour cess, t&p and material but excluding gst) 7 part bmaintainance cost :- maintainance cost will be paid year wise as pergovernment order no. 17/2024/sa.-113/23-1-2024-23-1099/113/2023 date 16.01.2024 and hq uppwd,lucknoworder no. 3689coprmc/mul-23-24 date 17.02.2024 . maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 1 to 6) 8 1st year- maintainance cost 0%cc &drain work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 9 2nd year- maintainance cost 0.25 % cc &drain work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 10 3rd year- maintainance cost 0.5 %cc &drain work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 11 4th year- maintainance cost 0.75 % cc &drain work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 12 5th year- maintainance cost 1 % cc &drain work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst)
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results