BRR : 6748253
Tender Brief : Special repair work of damaged part of Sh 97 Kam 67 to Semriya road - Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405.(Including labour Material T&P etc. complete as per direction of... Read More
Tender Value
₹
13,59,000
Contract Value
₹ 8,85,198
Saving / Difference
₹ 4,73,802
▲
Submission Date
26-11-2024
Contract Date
23-01-2025
Completion Date
60 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 13,46,197.7 | L3 | |||
| 2 | cnet-technologies | Bid Analytics | 13,29,370.23 | L2 | |||
| 3 | cnet-technologies | Bid Analytics | 8,85,198 | L1 |
Work Detail
special repair work of damaged part of sh 97 kam 67 to semriya road - providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kn in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density grading-3 as per technical specification clause 405.(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 2 providing and applying primer coat with bitumen emulsion (ss-ii) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means as per technical specification clause 502.(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 3 providing and applying tack coat with bitumen (vg-10) usingbitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom and air compresser as per technical specification clause 503..(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 4 providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm -11.2 mm aggregates using penetration grade bitumen vg-10to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with three wheel static roller80-100 kn capacity ,finished to required level and grades to be follwed by seal coat of type -c as per technical specification clause 508.(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 5 providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall usingtype c as per technical specification clause 510(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 6 construction ofsubgrade and earthen shoulders with approved material obtained from borrow pits with all lift and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 303.1 (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 7 part bmaintainance cost :- maintainance cost will be paid year wise as pergovernment order no. 17/2024/sa.-113/23-1-2024-23-1099/113/2023 date 16.01.2024 and hq uppwd,lucknoworder no. 3689coprmc/mul-23-24 date 17.02.2024 . maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 1 to 6 ) 8 1st year- maintainance cost 0%on bituminous work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 9 2nd year- maintainance cost 1.5% on bituminous work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 10 3rd year- maintainance cost 3 %on bituminous work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 11 4th year- maintainance cost 4.50% on bituminous work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 12 5th year- maintainance cost 6 % on bituminous work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 13 excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 14 plain cement concrete (pcc) m-10(1:3:6 nominal mix) in open foundation complete as per drawing and techanical specification clause 802,803,1202 & 1203. (including all taxes, labour cess, t&p and material but excluding gst) 15 r.c.r with cement and coarse sand mortar in proportion of 1 and 4 respectively in foundation complete as per drawing and technical specifications clause 600, 1202 & 1203 (including all taxes, labour cess, t&p and material but excluding gst) 16 struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 fm including supply of all material , labour t&p etc required for proper completion of work.as per sor si no-574. (including all taxes, labour cess, t&p and material but excluding gst) 17 providing and laying 600 mm dia n.p-3 h.p. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work.but excluding cost of collor (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 18 part bmaintainance cost :- maintainance cost will be paid year wise as pergovernment order no. 17/2024/sa.-113/23-1-2024-23-1099/113/2023 date 16.01.2024. maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 08 to 12) 19 1st year- maintainance cost 0%cc &drain work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 20 2nd year- maintainance cost 0.25 % cc &drain work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 21 3rd year- maintainance cost 0.5 %cc &drain work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 22 4th year- maintainance cost 0.75 % cc &drain work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 23 5th year- maintainance cost 1 % cc &drain work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst)
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000