BRR : 7288742
Tender Brief : Construction Of V.R.B. At Km. 16.900 Of Maina Dy. - E/W excavation of foundation including backfilling in all type of soil with all lead,lift,dressing & manual compaction etc. complete. 2 Laying C.C. 1:3:6 in foundation with coarse sand & stoneaggregate 20 to 40 mm. including cost of all material, labour and T&P etc. complete for completion of work. 3 1st class Brick work in 1:4 C.M. with Hamirpur coarse sand including cost of bricks. labour and T&P etc. complete for completion of work. 4 Centering and shuttering for R.C.C. work including cost of all materials.(a) Bridge slab above 3.00 m.... Read More
Tender Value
₹
9,50,000
Contract Value
₹ 4,69,569.77
Saving / Difference
₹ 4,80,430
▲
Submission Date
17-02-2025
Contract Date
26-04-2025
Completion Date
90 days
Participated Bidder List
9 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | 6,53,858.76 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | 7,20,586.23 | L7 | |||
| 5 | cnet-technologies | Bid Analytics | 6,02,115.42 | L2 | |||
| 6 | cnet-technologies | Bid Analytics | 6,82,619.79 | L5 | |||
| 7 | cnet-technologies | Bid Analytics | 4,69,569.77 | L1 | |||
| 8 | cnet-technologies | Bid Analytics | 7,13,064.77 | L6 | |||
| 9 | cnet-technologies | Bid Analytics | 6,71,046.67 | L4 |
Work Detail
construction of v.r.b. at km. 16.900 of maina dy. - e/w excavation of foundation including backfilling in all type of soil with all lead,lift,dressing & manual compaction etc. complete. 2 laying c.c. 1:3:6 in foundation with coarse sand & stoneaggregate 20 to 40 mm. including cost of all material, labour and t&p etc. complete for completion of work. 3 1st class brick work in 1:4 c.m. with hamirpur coarse sand including cost of bricks. labour and t&p etc. complete for completion of work. 4 centering and shuttering for r.c.c. work including cost of all materials.(a) bridge slab above 3.00 m. span. 5 supplying and fixing joint filler board 25 mm thick for expanssion joints gap including cost of all material, labour and t&p etc. complete for completion of work. 6 cutting, bending, binding and placing of steel reinforcement including cost of binding wire, and steel, labour and t&p etc complete. 7 r.c.c.1:1.5:3 (1cement:1.5 hamirpur coarse sand :3 coarse agrreegate 4.75 to 20 mm. size.) including cost of all material, labour and t&p etc. 8 struck deep cement pointing with 1:2 (1part of cement and 2 part of coarse sand) cement mortar, including cost of all material, labour and t&p etc. 9 laying c.c. 1:1.5:3 with hamirpur coarse sand & crushed coarse aggregate 4.75 to 40 mm. in bearing coat including cost of all material, labour and t&p etc. complete for completion of work. 10 boring with 15 cm.casing pipe including lowering of assembly and extracting casing pipe with contractors t&pand equipment upto 30 m. 11 hiring charges of 5h.p.diesel pump including operator and p.o.l.for running hours 12 supply and laying of sand fillingincluding cost of all material labour t&p etc
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000