BRR : 10555073
Click Here To View Tendering Authority. Price Bid City/State :  siddharthnagar, Uttar Pradesh
Tender Brief : Construction Of Tail Wall. At Km. 6.000 Of Parsa Mr. - W excavation of foundation including backfilling in all type of soil with all lead,lift,dressing & manual compaction etc. complete. 2 Laying C.C. 1:3:6 in foundation with coarse sand & stoneaggregate 20 to 40 mm. including cost of all material, labour and T&P etc. complete for completion of work. 3 1st class Brick work in 1:4 C.M. with Hamirpur coarse sand including cost of bricks. labour and T&P etc. complete for completion of work. 4 Centering and shuttering for C.C. work including cost of all materials.(a) Bridge slab above 3.00 m. ... Read More
Tender Value
7,00,000
Submission Date
03-12-2024
Participated Bidder List
7 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 5,34,860.2 L4
2 cnet-technologies Bid Analytics 5,84,804.9 L5
3 cnet-technologies Bid Analytics
4 cnet-technologies Bid Analytics 4,84,682.2 L2
5 cnet-technologies Bid Analytics 4,42,503.5 L1
6 cnet-technologies Bid Analytics 5,05,885 L3
7 cnet-technologies Bid Analytics
Work Detail
construction of tail wall. at km. 6.000 of parsa mr. - w excavation of foundation including backfilling in all type of soil with all lead,lift,dressing & manual compaction etc. complete. 2 laying c.c. 1:3:6 in foundation with coarse sand & stoneaggregate 20 to 40 mm. including cost of all material, labour and t&p etc. complete for completion of work. 3 1st class brick work in 1:4 c.m. with hamirpur coarse sand including cost of bricks. labour and t&p etc. complete for completion of work. 4 centering and shuttering for c.c. work including cost of all materials.(a) bridge slab above 3.00 m. span. 5 struck deep cement pointing with 1:2 (1part of cement and 2 part of coarse sand) cement mortar, including cost of all material, labour and t&p etc. 6 laying c.c. 1:1.5:3 with hamirpur coarse sand & crushed coarse aggregate 4.75 to 40 mm. in bearing coat including cost of all material, labour and t&p etc. complete for completion of work. 7 boring with 15 cm casing pipe including lowering of assembly and extracting casing pipe with contractors t&p and equipment upto to 30m 8 hiring charges of 5hp diesal pump including operator and pol for running hours 9 sand fillingincluding cost of all material labour t&p etc
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 73e6a28d-865a-46de-a36d-50bedb4bd889 financialevaluation notice
Download boqcomparativechart boq document
Download finsummary_1716871 aoc document
Download File Name File Description
Download f6c1ea90-79b0-45c5-bdfe-27dbce3d0106 Tender Documents
Download biddoc Tender Documents
Download BOQ_1716871 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders