BRR : 6934034
Tender Brief : Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1001 Hoist the boat making sure that bearing surfaces are adequately cushioned Docking duration 07 days; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1002 Clean the marine growth with wooden scrapper; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1003 Wash the underwater area with fresh water rub with grade 220 emery papers and smoothen the surfaces; Service ... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 20,71,400
Submission Date
08-02-2025
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 20,71,400 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 28,44,765 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 23,96,205 | L2 |
Work Detail
bids are invited for repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1001 hoist the boat making sure that bearing surfaces are adequately cushioned docking duration 07 days; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1002 clean the marine growth with wooden scrapper; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1003 wash the underwater area with fresh water rub with grade 220 emery papers and smoothen the surfaces; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1004 clean with mild detergent in fresh water inspect for cracks and peeling of gel coat repair if necessary; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1005 touch up the antifouling paint as per paint scheme paint yard supply; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1006 clean all sea suction scoops and inspect for cracks; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1007 clean the marine growth of shaft propeller and rudder; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1008 measure and record the clearance of stern tube and p bracket bushes rudder and rudder jumping collar; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1009 overhauling and pressure testing of the underwater valves and cocks including painting of valvesall material and spares yard supply i gs pump underwat.. , repair maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1010 clean the bilges and thoroughly inspect the structure to main engine foundation supports for distortion cracks and delamination; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1011 check the tightness of foundation bolts of all auxiliary machineries; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1012 marine toilet remove and clean all flexible pipes and refit with new clipshand pumpsuction and discharge valve to be overhauledmake jabscomodelcmpct 24vdia.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; hb1013 dfender crack and deterioration observed at dfenders at various places to be renewed as per samplelegth approx10 mtrebd type rubber fender 75x75x40 mm; se.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb1014 cleaning and painting of bilges of following compartment to be carried out as per paint schemepaint yard supply i engine room 148 sqm approx ii pum.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb 1015 wheel house sofa rexine is deteriorated and tear off at various places to be renewed as per samplelength 03 mtr height and breadth 05 mtr each; service pr.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb 1016 wheel house sofa and sitting area seat cover to be changed as per sample length03 mtrheight and breadth 05 mtr eachqty02; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb 1017 wheel house sofa and sitting area floor mat is damaged to be renewed as per sample area 12 sqm mat pvc vinyl; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb1018 wheel house wash basin tap leaking drain pipe choked pipe to be chemically clean and tap to be reneweddia of pipe40mmmaterial ms tap materialss; service pr.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb1019 wheel house rear window sun light protection film shading screen tear off at amny places to be replaced as per sample area20 sqm; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb1020 a wooden locker at crew cabin broken hinges securing holes inlarge locker to be repaired and sunmica sheet to be renewed size1mtrx1mtrx05 mtr; service prov.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb1021 ingress of rain water observed in bridge crew cabin engine room and pump room through window beeding wire gland and securing bolt of stanchion beeding to b.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb1022 anchor and chain cable to be chip and clean and paint with two coats of anti corosive paint make sea links weight50 kg cable length10 mtr dia10mm paint and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; ea3001 gear oil cooler to be chemically claeneed and pressure tested in way job include renewal of gasketo rings and 02 nos sacrificial anode tp 15 barqty02; serv.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; ea3002 ac sea water pump to be overhauled and proved for satisfactory operation jobs include renewal of bearings mechanicalseal and impeller makecrompton greaves .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; ea3003 checks all cooling coils for cleaniness and corrosion if the coils are dirty clean with water sparay soap solution and nylon brush and carryout pressure te.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; ea3004 fire fighting system modelnovec 1230 following jobs to be undertaken in yearly routine a check manual operation b calibrate all pressure device .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; ea3005 following sewa water syatem valve to be removed overhaulked and pressure tested all material and spares yard supply a bilge syatem valve 40 nb typesdn.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; ea3006 fresh water tank to be cleaned with liquid detergent renew man hole cover gasket; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; ea3007 fuel oil tank to be cleaned inspect and paint the as per paint scheme paint yard supply renew manhole cover gasket; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; ea3008 fire pump ot be overhauled and proved for satisfactory operation all spares and material yard supply make cem model am 512a; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; ea3009 bilge pump to be overhauled and proved for satisfactory operation all spares and material yard supply make cem model am 512a; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; eb3010 fresh water pump is not developing sufficient pressure suspect excessive clearence between pump and impeller pump to be overhauled and proved for satsifac.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; eb3011 quick shutt off valve cover of firemain syatem broken to be fabricated as per sample material frp sheet saize04x08x12 inches; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; eb3012 securing clamps of sw fw and fuel syatem coroded and deteriorated to be renewed as per sample a dia12 inches qty06 materialss b dia10 inches qty06.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; eb3013 04 nos gland bush stud of port and stbd shafting thread wornout stud to be fabricated and fitted as per sample dia14 mm length72 mm materailss; service pro.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; la5001 engine room supply fans with motors 02 nos to be overhaul and bearings to be replace make cem model ve35230m; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; la5002 05 in no battery charger to be overhauled and proved for satisfactory operation all spares and material yard supply makevictron energy modelblue smart ip67.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; la5003 window wiper overhaul the window wiper motor and gear assembly replace bearings if required wiper blade to be changed as per sample all spares and materia.. , repair, maintenance, and installation of plant/ systems/equipments total quantity :
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | e77886ab-477f-4bd5-a414-d3d15ffb08d6 |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results