BRR : 6673745
Click Here To View Tendering Authority. Aoc City/State :  Andaman, Andaman And Nicobar Islands
Tender Brief : Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1001 Hoist the boat making sure that bearing surfaces are adequately cushioned Docking duration 07 days; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1002 Clean the marine growth with wooden scrapper; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1003 Wash the underwater area with fresh water rub with grade 220emery papers and smoothen... Read More
Tender Value
16,79,600
Contract Value
₹ 16,95,225
Saving / Difference
₹ -15,625 ▼
Submission Date
16-12-2024
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
5 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 21,19,900 L3
2 cnet-technologies Bid Analytics 16,95,225 L1
3 cnet-technologies Bid Analytics 20,72,700 L2
4 cnet-technologies Bid Analytics 22,84,401 L4
5 cnet-technologies Bid Analytics 29,14,800 L5
Work Detail
bids are invited for repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1001 hoist the boat making sure that bearing surfaces are adequately cushioned docking duration 07 days; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1002 clean the marine growth with wooden scrapper; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1003 wash the underwater area with fresh water rub with grade 220emery papers and smoothen the surfaces; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1004 clean with mild detergent in fresh water inspect for cracks and peeling of gel coat repair if necessary; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1005 touch up the antifouling paint as per paint scheme paint yard supply; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1006 clean all sea suction scoops and inspect for cracks; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1007 clean the marine growth of shaft propeller and rudder; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1008 measure and record the clearance of stern tube and p bracket bushes rudder and rudder jumping collar; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha 1009 overhauling and pressure testing of the underwater valves and cocks including painting of valves all material and spares yard supply qty 09; servi.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boa 506; ha1010 clean the bilges and thoroughly inspect the structure to main engine foundation supports for distortion cracks and delamination; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1011 check the tightness of foundation bolts of all auxiliary machinaries; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ha1012 marine toilet remove and clean all flexible pipes and refit with new clipshand pumpsuction and discharge valve to be overhauledmake jabscomodelcmpc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb1013 dfender crack and deterioration observed at dfenders at various places to be renewed as per samplelegth approx10 mtrebd type rubber fender 75x75x4.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb1014 cleaning and painting of bilges of following compartment to be carried out as per paint schemepaint yard supply i engine room 148 sqmapprox .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb 1015 wheel house sofa rexine is deteriorated and tear off at various places to be renewed asper samplelength 03 mtrheight and breadth 05 mtr each; serv.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb 1016 wheel house sofa and sitting area seat cover to be changed as per sample length03 mtrheight and breadth 05 mtr each qty02; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb 1017 wheel house and sitting area floor mat is damaged to be renewed as per sample area 12 sqm mat pvc vinyl; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb1018 quarter deck awning structure rod 04 nos bends due to heavy wind force and rain rod to be repairedrenewed as per sample mat ss hollow pipe heavy me.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb1019 wheel house rear window sun light protection film shading screen tear off at many places to be replaced as per sample area20 sqm; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb1020 a wooden locker at crew cabin broken hinges securing holes inlarge locker to be repaired and sun mica sheet to be renewed size1mtrx1mtrx05 mtr; ser.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb1021 anchor securing to be done with ss clamp; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb1022 anchor and chain cable to be chip and clean and paint with two coats of anticorrosive paint make sea links weight50 kg cable length10 mtr dia10mm p.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb1023 pilot chair base adjustment is malfunctioning to be rectified; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; hb1024 all cable and bolting on super structure toilet exhaust and window side to be leak proofed with silicone gel; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ea3001 gear oil cooler to be chemically cleaned and pressure tested in way job include renewal of gasketo rings and 02 nos sacrificial anode tp 15 bar qty.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ea3002 ac sea water pump to be overhauled and proved for satisfactory operation jobs include renewal of bearings mechanicalseal and impeller makecrompton .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ea3003 checks all cooling coils for cleanliness and corrosion if the coils are dirty clean with water sparay soap solution and nylon brush and carryout pr.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ea3004 fire fighting system modelnovec 1230 following jobs to be undertaken in yearly routine a check manual operation b calibrate all pressure de.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ea 3005 following sea water system valve to be removed overhauled and pressure tested all material and spares yard supply qty 24 valves of all system; ser.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ea3006 fresh water tank to be cleaned with liquid detergent renew man hole cover gasket; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ea3007 fuel oil tank to be cleaned inspect and paint the as per paint scheme paint yard supply renew manhole cover gasket; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ea3008 fire pump to be overhauled and proved for satisfactory operation all spares and material yard supplymake cem model am 512a; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; ea3009 bilge pump to be overhauled and proved for satisfactory operation all spares and material yard supplymake cem model am 512a; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; eb3010 fresh water handpump is not developing sufficient pressurerubberbellow is damaged to be renewed and proved; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; eb3011 quick shut off valve cover of fireman system broken to be fabricated as per sample material frp sheet saize04x08x12 inches; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; eb3012 securing clamps of sw fw and fuel systemcorroded and deteriorated to be renewed as per sample a dia 12 10 8 6 4 2 and qty 6 6 8 8 12 10 respect.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; eb3013 04 nos gland bush stud of port and stbd shafting thread wornout stud to be fabricated and fitted as per sample dia14 mm length72 mm materail ss; se.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; eb3014 both main engine emergency stop switch to be secured location wheel house; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; eb3015 no01 and no02 air conditioner gas to be charged and system to be pressure tested and leak test to be done; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; la5001 engine room supply fans with motors 02 nos to be overhaul and bearings to be replace make cem model ve35230m; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; la5002 05 in no battery charger to be overhauled and proved for satisfactory operation all spares and material yard supply makevictron energy modelblue sm.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; la5003 window wiper overhaul the window wiper motor and gear assembly replace bearings if required wiper blade to be changed as per sample all spares and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; la5004 general lighting replace the damage fittings with a new one material ss qty 08; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - work boat 506; lb5005 total quantity :
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download e051c350-a836-432c-8c57-90713c97a597
Download File Name File Description
Download 89cac77a-7bf4-4cf3-bc0b-f4bbe7b4c324 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders