BRR : 4766494
Click Here To View Tendering Authority. Aoc City/State :  bareilly, Uttar Pradesh
Tender Brief : Work Of Replacement Of Damage Cable Lug, Tail Less Unit Etc For Preventive Maintenance Of Distribution T / F In Different Areas Of Eudd-Iii Bareilly Under For System Strengthening For Providing Uninterrupted 24*7 Power Supply Under The Head Of ( Add. B.P. 2023-2024 ) -2 Lt Cable Size 1X240 Mm2 3 Lt Cable Size 1X400 Mm2 4 Lt Cable Size 1X630 Mm2 5 Lt Cable Size 1X1000 Mm2 6 Lt Cable Size 3.5X240 Mm2 7 Lt Cable Size 3.5X400 Mm2 8 Ms Channel 100X50 For Mounting Of Tail Less Unit 9 Repairing Of 33 Kv Control Panel 10 Fabrication And Erection Ofms Channel 100X50 ( Total ... Read More
Tender Value
78,50,000
Contract Value
₹ 68,49,375
Saving / Difference
₹ 10,00,625 ▲
Submission Date
11-10-2023
Contract Date
07-03-2024
Completion Date
365 days
Participated Bidder List
4 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 82,41,710 L2
2 cnet-technologies Bid Analytics 68,49,375 L1
3 cnet-technologies Bid Analytics
4 cnet-technologies Bid Analytics
Work Detail
work of replacement of damage cable lug, tail less unit etc for preventive maintenance of distribution t / f in different areas of eudd-iii bareilly under for system strengthening for providing uninterrupted 24*7 power supply under the head of ( add. b.p. 2023-2024 ) -2 lt cable size 1x240 mm2 3 lt cable size 1x400 mm2 4 lt cable size 1x630 mm2 5 lt cable size 1x1000 mm2 6 lt cable size 3.5x240 mm2 7 lt cable size 3.5x400 mm2 8 ms channel 100x50 for mounting of tail less unit 9 repairing of 33 kv control panel 10 fabrication and erection ofms channel 100x50 ( total 2080 kgs. ) for mounting of tail less unitfor distribution t / f . 11 dismantling and removing ofold and damaged lt cable from transformerandfixing of new ltcable size ( 1x240mm2 ) 12 dismantling and removing ofold and damaged lt cable from transformerandfixing of new ltcable size ( 1x400mm2 ) 13 dismantling and removing ofold and damaged lt cable from transformerandfixing of new ltcable size ( 1x630mm2 ) 14 dismantling and removing ofold and damaged lt cable from transformerandfixing of new ltcable size ( 1x1000mm2 ) 15 dismantling and removing ofold and damaged lt cable from transformerandfixing of new ltcable size ( 3.5x240mm2 ) 16 dismantling and removing ofold and damaged lt cable from transformerandfixing of new ltcable size ( 3.5x400mm2 ) 17 replacementof old damaged tail less unit & fixing new tail less unit ( 300 amp ) with material at m.s channel frame along with providing and fixing fuse wire ( 10 swg / 12 sgw / 14 sgw ) . ( all the material will be arranged by the contractor at his own cost ) . 18 replacementof old damaged tail less unit & fixing new tail less unit ( 500 amp ) with material at m.s channel frame along with providing and fixing fuse wire ( 10 swg / 12 sgw / 14 sgw ) . ( all the material will be arranged by the contractor at his own cost ) . 19 replacement of old damaged tail less unit ( 800 amp ) with material. at m.s channel frame along with providing and fixing fuse wire ( 10 swg / 12 sgw / 14 sgw ) . ( all the material will be arranged by the contractor at his own cost ) 20 replacement of old damaged copper l-piece & fixing of newcopper l-piece ( 50x225x10mm ) with material. ( all the material will be arranged by the contractor at his own cost ) 21 replacement of old damaged copper l-piece & fixing of newcopper l-piece ( 62x225x12mm ) with material. ( all the material will be arranged by the contractor at his own cost ) 22 replacement of old and damaged al lugs and fixing new al lugs suitable for 150 mm2 with material. ( all the material will be arranged by the contractor at his own cost ) . 23 replacement of old and damaged al lugs and fixing new al lugs suitable for 240 mm2 with material. ( all the material will be arranged by the contractor at his own cost ) . 24 replacement of old damaged al lugs suitable for 400 mm2 with material. ( all the material will be arranged by the contractor at his own cost ) . 25 replacement of old damaged al lugs suitable for 630mm2 with material. ( all the material will be arranged by the contractor at his own cost ) . 26 replacement of old damaged al lugs suitable for 1000 mm2 with material. ( all the material will be arranged by the contractor at his own cost ) . 27 the work of fabrication / construction and grouting of wire mesh newfencing of 16 meter running length / as per site requirement in rectangular shape height 2 meter with angle size of 45x45x05 m.m including gate at one side as per respo norms. ( material will be supplied by contractor ) . 28 repair of damaged plinth complete, by providing first class bricks work as per respo norms. ( material will be supplied by contractor ) . 29 chemical earthing of t / f neutral including all materials ( chemical, gi pipe, gi strip, nut bolt, etc ) 30 supply & fixingnut & bolts.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 45474556-fb5f-464f-949c-a94e0a8a54e0
Download aoc
Download boqcomparativechart
Download finance_1422673
Download finsummary_1422673
Download technical_1422673
Download techsummary_1422673
Download File Name File Description
Download c9ce785b-41cb-46c1-9cd0-b930aa7996f3 Tender Documents
Download BOQ_1422673 Tender Documents
Download Tendernotice_1 Tender Documents
Download Tender_form Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000