BRR : 4681417
Tender Brief : Tender For Different Electrification Works Under Full Deposit Scheme-2024-25 Under Eudd-Ii Bareilly, 1 For the work of Giving NewConnection 80 KW(LMV-4B) ,forNavodaya Multi Speciality Hospital ,Bareilly, Mini Bye Pass Opp. Club-7,Bareillyunder Full deposited fund-2024-25 under EUDD-II, Bareilly. 2 Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. 3 ST Pole (11 Mtr. Long) 4 ACSR Dog Conductor 5 11 KV Pilfer Proof merting Cubical 6 11 KV XLPE Cable (3X120 sqmm) 7 11 KV Cable Jointing Kits (3X120 sqmm) I/D & O/D 8 Other Line materails... Read More
Tender Value
₹
4,65,000
Contract Value
₹ 4,63,495
Saving / Difference
₹ 1,505
▲
Submission Date
25-07-2024
Contract Date
21-09-2024
Completion Date
90 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 4,63,495 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 4,64,775 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 4,64,495 | L2 |
Work Detail
tender for different electrification works under full deposit scheme-2024-25 under eudd-ii bareilly, 1 for the work of giving newconnection 80 kw(lmv-4b) ,fornavodaya multi speciality hospital ,bareilly, mini bye pass opp. club-7,bareillyunder full deposited fund-2024-25 under eudd-ii, bareilly. 2 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 3 st pole (11 mtr. long) 4 acsr dog conductor 5 11 kv pilfer proof merting cubical 6 11 kv xlpe cable (3x120 sqmm) 7 11 kv cable jointing kits (3x120 sqmm) i/d & o/d 8 other line materails 9 erection work 10 hoisting of 30 meter 11 kv xlpe cable on d/poles situated at both side of road including cost of02 meter6 inch dia g.i pipe (material will be supplied by contractor). 11 erection ofst doublepole including digging of pit & grouting work complete and fitting of all accessories complete. 12 erection of stay set complete in all respect. 13 earthing of poles. 14 erecrtion and fixing of 11 kv cable jointing kits (3x120 sqmm)i/d&o/d 15 erection & fixing of 11 kv pilfer proof merting cubical 16 earthing of11 kv pilfer proof merting cubical water level body & neutral, with gi pipe of 1.5 dia. including mild steel strip size 35x6 mm. (material will be supplied by contractor). 17 fixingof other line materials i.e , 11 kv pin insulator with pin-12 nos., top channel-04. 18 supply & fixing offollowing items 19 stone pad 20 clamps with nuts & bolts 21 for the work of shiting of d/pole alongwith ct pt unit & metring cubical of m/s b.l agro industries ltd., parsakhera ,bareillyunder full deposited fund-2024-25 under eudd-ii, bareilly. 22 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 23 st pole (11 mtr. long) 24 11 kv xlpe cable (3x70 sqmm) 25 11 kv cable jointing kits (3x70 sqmm) o/d 26 other line materails 27 erection work 28 erection ofst doublepole including digging of pit & grouting work complete and fitting of all accessories complete. 29 shiting of ct pt unit & metring cubical from oldd/pole to new erected d/pole 30 laying of underground 11 kv xlpe cable (3x70 sqmm) . 31 hoisting of 30 meter 11 kv xlpe cable on d/poles situated at both side of road including cost of12 meter6 inch dia g.i pipe (material will be supplied by contractor). 32 earthing of poles 33 earthing of11 kv pilfer proof merting cubical& ct pt unit water level, with gi pipe of 1.5 dia. including mild steel strip size 35x6 mm. (material will be supplied by contractor). 34 fixingof other line materials i.e , 11 kv pin insulator with pin-06 nos., top channel-02., s/s base angle-02 no. 35 dismentling of existing d/pole and backe carriage from site to c.b ganj central store . 36 supply & fixing of clamps with nut bolt. 37 for the work of increasing load 100 kw to 370 kw (lmv-4) of principal iti,c.b. ganj, bareilly under full deposited fund-2024-25 under eudd-ii, bareilly.hera ,bareillyunder full deposited fund-2024-25 under eudd-ii, bareilly. 38 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 39 st pole (11 mtr. long) 40 11 kv xlpe cable (3x120 sqmm) 41 11 kv cable jointing kits (3x120 sqmm) o/d 42 11 kv pilfer proof merting cubical 43 other line materails 44 erection work 45 erection ofst doublepole including digging of pit & grouting work complete and fitting of all accessories complete. 46 earthing of poles 47 laying of underground 11 kv xlpe cable (3x120 sqmm) . 48 hoisting of 70 meter 11 kv xlpe cable on d/poles situated at both side of road including cost of12 meter6 inch dia g.i pipe (material will be supplied by contractor). 49 erection of stay set complete in all respect. 50 erection & fixing of 11 kv pilfer proof merting cubical 51 fixingof other line materials i.e , 11 kv pin insulator with pin-12 nos., top channel-06.,s/s base angle-04 no. 52 supply & fixing clamps with nuts & bolts 53 for the work of giving new 05 kw commercial connection to mr. jitendra yadav, vill. khadua ,bareillyunder full deposited fund-2024-25 under eudd-ii, bareilly. 54 carriage of following materials from e.s.cs store c.b ganj to work site including loading & unloading 55 st pole (11 mtr. long) 56 pcc pole (8.5 mtr.) 57 acsr weasal conductor 58 abc (3x50 sqmm) 59 63 kva new t/f 60 distribution box 03 phase 61 other line materails 62 erection work 63 erection ofst doublepole including digging of pit & grouting work complete and fitting of all accessories complete. 64 erection ofstpole including digging of pit & grouting work complete and fitting of all accessories complete. 65 erection ofpccpole including digging of pit & grouting work complete and fitting of all accessories complete. 66 earthing of pole by ms erathing rod. 67 laying of acsr weasal conductor 68 laying of ab cable (3x50 sqmm) 69 erection of stay set complete 70 erection & fixing of 03 ph distribution box alongwith making all connections . 71 mounting of 63 kv t/f ond/pole alongwith making all connections 72 earthing of63 kv t/fwater level body & neutral, with gi pipe of 1.5 dia. including mild steel strip size 35x6 mm. (material will be supplied by contractor). 73 fixingof other line materials i.e , 11 kv pin insulator with pin-18 nos., top channel-02.,s/s base angle-02 no., 11 kv disc insulatorwith fitting-06 no., t-off channel-02 no. 74 supply & fixing offollowing items 75 i-hook clamps 76 clamps with nuts & bolts 77 dead end clamps 78 for the work of replacement of 11 kv mereting cubical of m/s sai pet , parsakhera industrial area ,bareillyunder full deposited fund-2024-25 under eudd-ii, bareilly. 79 carriage of following materials from e.s.cs store c.b ganj to work site including loading & unloading 80 11 kv pilfer proof merting cubical 81 erection work 82 dismentling ofexisting old11 kv pilfer proof merting cubicalalongwith back carriage from site to c.b gabj store ,bareilly. 83 erection and fixing ofnew 11 kv pilfer proof merting cubical 84 fot the work ofshifting 250 kva t/f and other associated materials on request of shri arun kr. shuka, gandipuram phase-2, bareilly under full deposited fund-2024-25 under eudd-ii, bareilly. 85 carriage of following materials from e.s.cs store c.b ganj to work site including loading & unloading 86 st pole (11 mtr.) 87 ab cable (3x120 sqmm) 88 03 ph distribution box 89 lt cable (3.5x400 sqmm) 90 lt cable (1.0x400 sqmm) 91 other line materails 92 erection work 93 erection ofst doublepole including digging of pit & grouting work complete and fitting of all accessories complete. 94 laying of ab cable (3x120 sqmm) 95 erection & fixing of 03 ph distribution box alongwith making all connections. 96 erathing of poles . 97 construction of plinth complete (2.0m*2.0m*1.5m) by providing first class bricks as per respo norms (material will be supplied by contractor) 98 work of fabrication /construction and grouting of wire mesh fencing of 16 mtr running length/as per site requirement in rectangular shape height 2 mtr with angle size of 45*45*5 mm including gate at one side as per respo norms (material will be supplied by contractor) 99 dismentlingof250 kva t/f from old plinth and installation on newly construted plinth alongwith making all connections . 100 laying of lt cable (3.5x400 sqmm) 101 laying of lt cable (1.0x400 sqmm) 102 earthing of250kv t/fwater level body & neutral, with gi pipe of 1.5 dia. including mild steel strip size 35x6 mm. (material will be supplied by contractor). 103 fixingof other line materials i.e , 11 kv pin insulator with pin-12 nos., top channel-05., 11 kv disc insulatorwith fitting-06 no., etc. 104 supply & fixing offollowing items 105 i-hook suspension clamps 106 dead end clamps 107 clamps with nut & bolts 108 tail less unit (400 amp.) 109 al lug (400 sqmm)
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000