BRR : 1841087
Tender Brief : Replacement Of Damaged Chain Links Of Rc / Dd / Product Elevators And Rc / Sf Conveyors In Np Plant , Fact Cd . , Replacement Of Damaged Chain Links Of Rc / Dd / Product Elevators And Rc / Sf Conveyors In Np Plant , Fact Cd . , Repair / Replacement Of Chain Links Of Product Elevator . Work Involves : The Materials Required For The Work Shall Be Collected / Transported From Stores To Site . After Getting The Clearance , Boot Covers , Side Covers And All Inspection Doors Shall Be Opened . Back Stopper Of Gearbox Shall Be Removed And Suitably Position The Broken Chain Links And Buck... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 7,12,000
Submission Date
09-10-2019
Contract Date
30-11-2019
Completion Date
365 days
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 12,86,000 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 7,12,000 | L1 |
Work Detail
replacement of damaged chain links of rc / dd / product elevators and rc / sf conveyors in np plant , fact cd . , replacement of damaged chain links of rc / dd / product elevators and rc / sf conveyors in np plant , fact cd . , repair / replacement of chain links of product elevator . work involves : the materials required for the work shall be collected / transported from stores to site . after getting the clearance , boot covers , side covers and all inspection doors shall be opened . back stopper of gearbox shall be removed and suitably position the broken chain links and buckets , by manual rotation of the elevator chain . the bottom side sprocket assembly shall be lifted with chain block . the buckets , lock pins and connecting pins of the damaged links shall be removed to dismantle / take out the damaged chain link . new chain links , pins and lock pins shall be fixed back in position . the dismantled / new buckets , side covers , bottom side sprocket assembly shall be fixed back properly . all guide angles shall be inspected for looseness , damage and rectified . the damaged guide angles are to be dismantled and fixed back after repairing on both sides , if required and also the required patch work at the guide angle fixing area is to be done as per the instruction . box-up boot covers and inspection covers . fix the back stopper of gearbox and take the trial run . , repair / replacement of chain links of dd / rc elevator . work involves : the materials required for the work shall be collected / transported from stores to site . after getting the clearance , boot covers , side covers and all inspection doors shall be opened . back stopper of gearbox shall be removed and suitably position the broken chain links and buckets , by manual rotation of the elevator chain . the bottom side sprocket assembly shall be lifted with chain block . the buckets , lock pins and connecting pins of the damaged links shall be removed to dismantle / take out the damaged chain link . new chain links , pins and lock pins shall be fixed back in position . the dismantled / new buckets , side covers , bottom side sprocket assembly shall be fixed back properly . all guide angles shall be inspected for looseness , damage and rectified . the damaged guide angles are to be dismantled and fixed back after repairing on both sides , if required and also the required patch work at the guide angle fixing area is to be done as per the instruction . box-up boot covers and inspection covers . fix the back stopper of gearbox and take the trial run . , repair / replacement of chain links of rc / sf conveyor . work involves : the materials required for the work shall be collected / transported from stores to site . after getting the clearance , back and front doors , side covers and inspection doors shall be opened . suitably position the brocken chain links and flights for repair . adjust tail sprocket if required . the flights , lock pins and connecting pins of the damaged links shall be removed to dismantle / take out the damaged chain link . new chain links , pins and lock pins shall be fixed back in position . the dismantled or new flights shall be fixed back and tightened properly . tightening / loosening of the tail end sprocket sssembly shall be done as per instruction . box-up all doors , covers and inspection covers . take trial run of the rc / sf conveyor and box-up back and front doors .
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | f691bf5f-9b47-444a-bb94-dece1bcd3cf5 |
| Download | File Name | File Description |
|---|---|---|
| Download | BOQ_528369 | Tender Documents - BOQ |
| Download | TenderDocument | Tender Documents - Tender documents |
| Download | 44DFCB9F-FD55-4BC1-8759-ACEBA3BD1967 | Tender Documents - Tender Notice |
| Download | SpecialConditions | Tender Documents - Special conditions |
| Download | Tendernotice_1 | Tender Documents - NIT |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results