BRR : 11512275
Tender Brief : Tender for Repairs & Cleaning To Footvalves, Dismantling Of Suction Pipelines , And And Allied Electro-Mechanical Works At Lis Aijpur Trewa , Dismantling Of Suction Pipeline 300Mm Of Unit No I And Unit Ii Only Vertical Lengths And Footvalves 300Mm Of Both The Units At Lis Trewa For Cleaning Of Tank And Extraction Out Of The Footvalves Covered By Silt By The Respective Counterpart I.E The Civil Department . Cleaning To 300 Mm Diameter Foot Valve Of Pumping Unit No I By Way Of Dismantling Parts. Cleaning Of All Internal Parts To Remove Silt And Rust. Providing New Leather Washer, New Nuts & Bol... Read More
Tender Value
₹
90,500
Submission Date
02-07-2026
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics |
Work Detail
tender for repairs & cleaning to footvalves, dismantling of suction pipelines , and and allied electro-mechanical works at lis aijpur trewa , dismantling of suction pipeline 300mm of unit no i and unit ii only vertical lengths and footvalves 300mm of both the units at lis trewa for cleaning of tank and extraction out of the footvalves covered by silt by the respective counterpart i.e the civil department . cleaning to 300 mm diameter foot valve of pumping unit no i by way of dismantling parts. cleaning of all internal parts to remove silt and rust. providing new leather washer, new nuts & bolts. the job includes fitting it with foot valve at the end of suction pipe. repair to 300 mm diameter foot valve of pumping unit no ii by way of dismantling parts. cleaning of all internal parts to remove silt and rust. fabrication of foot valve plate as per size, new leather washer, hinge pin, new nuts & bolts. the job includes fitting it with foot valve at the end of suction pipe. reassembling of the 2no ms pipe peices of each unit with the help of the chain pulley block, new nuts and bolts and rubber gasket after cleaning of pipes by taking out silt and sand .then fitting of the footvalves at the end of suction pipelines. dismantling of the vertical length and almost half of horizontal pipe of the priming pump for the smooth working and after civil works being done reassembling the pipe with new nuts and bolts and rubber gasket and footvalve after proper cleaning of the priming pipe by taking out the silt and sand accumulated and cleaning of the footvalve as well. job includes material cost, chain pulley block hire charges, manual labour and carriage charges. replacement of the changeover switch 630a 4pole 50hz and ac 23 (havells/ l&t/ seimens/ schnider) at lis trewa with the new one .the job includes cutting out the connections from the lt side of the transformer and after the replacement of the switch making the connections again and testing it. job includes material cost, manual labour and carriage charges complete job . note:- the tenderers are requested to visit the site and quote the rate as per site conditions. the job allow any modification required at site in order for its smooth functioning. the firm should offer rebate on old material. , rebate on old parts
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results