Tender Brief : Bids Are invited for Following works are required to be carried out for internal inspection of 40 MVA Transformer at 220 KV S/S Shatabdinagar under ETD Meerut. The Detail of work to be executed is as given below :- , Drain out of complete Transformer oil in empty oil tanker for internal inspection of Transformer. (Centrifuging machine with operator shall be provided by the contractor) , Opening of inspection plate, dismantling of HV/ LV side bushings for internal inspection of 40 MVA Transformer at 220 KV sub-station Shatabdinagar. , Internal inspection of 40 MVA Transformer, checking of H... Read More
Tender Value
2,54,762
Contract Value
₹ 2,54,101.2
Saving / Difference
₹ 661 ▲
Submission Date
30-04-2026
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 2,54,101.2 L1
2 cnet-technologies Bid Analytics 3,49,870 L2
3 cnet-technologies Bid Analytics 1,75,761
Work Detail
bids are invited for following works are required to be carried out for internal inspection of 40 mva transformer at 220 kv s/s shatabdinagar under etd meerut. the detail of work to be executed is as given below :- , drain out of complete transformer oil in empty oil tanker for internal inspection of transformer. (centrifuging machine with operator shall be provided by the contractor) , opening of inspection plate, dismantling of hv/ lv side bushings for internal inspection of 40 mva transformer at 220 kv sub-station shatabdinagar. , internal inspection of 40 mva transformer, checking of hv/lv side winding lead of transformer, tightening of joints, connections and all other components inside the main tank of transformer. , erection of dismantled bushings, inspection plate and replacement of gasket of open parts of 40 mva transformer. , complete evacuation of 40 mva transformer main tank and filling of dry air/dry nitrogen of dew point-50°c or better in vacuum up to pressure of 0.25kg/cm2 and the again evacuating the transformer tank after required time interval (approx. 12/24 hrs) using centrifuging machine the work shall including connecting pipe of machine as required measuring due point values ​​of n2 after ever cycle till the required value is achieved. , create the vacuum inside the 40 mva transformer before filling the transformer oil including vacuum standing test. , filling of transformer oil from oil tanker to transformer main tank after internal inspection of damaged 40 mva transformer. (centrifuging machine with operator shall be provided by the contractor) , centrifuging the t/f oil in main tank and circulating the t/f oil through centrifuging machine and taking bdv time to time. (centrifuging machine shall be provided by the contractor.) (approx.-18kl) , transformer oil sample collection testing of t/f oil testing lab including cost of transportation of each sample in standard sample bottles.i-bdvii-ppmiii-dga
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download db3b2e40-f830-42bb-9438-5c48dd83f6db result notice
Download File Name File Description
Download 95523a4a-1845-4551-bbc4-bc25dcc60787 Tender Documents
Download 1776687594 Tender Documents
Download 1776687624 Tender Documents
Download 1776687626 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders