BRR : 11339257
Tender Brief : lump sum price worked out by the contractor for building works as listed in schedule a part-i representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 21 , lump sum price worked out by the contractor for excavation & earth work as listed in schedule a part-ii representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 22 , lump sum price worked out by the contractor for internal wa... Read More
Tender Value
₹
14,89,000
Submission Date
15-06-2026
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics |
Work Detail
lump sum price worked out by the contractor for building works as listed in schedule a part-i representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 21 , lump sum price worked out by the contractor for excavation & earth work as listed in schedule a part-ii representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 22 , lump sum price worked out by the contractor for internal water supply as listed in schedule a part-iii representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 25 , lump sum price worked out by the contractor for internal elecrification as listed in schedule a part-iv representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 29 , lump sum price worked out by the contractor for hard standing/ path as listed in schedule a part-v representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 30 , lump sum price worked out by the contractor for sewage disposal as listed in schedule a part-vi representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 32 , lump sum price worked out by the contractor for external water supply as listed in schedule a part-vii representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 28 , lump sum price worked out by the contractor for external electrification as listed in schedule a part-viii representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/f from serial page no 34 , schedule a part-ix (miscellaneous items) notes:- (i) this schedule is not pre-priced by mes and the pre-priced rate indicated as rs 0.00 under column 5 signifies this fact only. (ii) excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under respective schedule. , (internal electrification) s&f in bldg security light led light fitting including fixing arrangement on wall with suitable size of gi pipe bend into shape, clamps and nut & bolts for fitting capacity of led 30 watt, with pressure diecast aluminum housing & polycarbonate having top opening seperate driver compartment with ip66 protection and impact resistance ik07 duly prewired connection complete all as directed.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid