BRR : 10794392
Click Here To View Tendering Authority. Price Bid City/State :  Pune, Maharashtra
Tender Brief : Providing Mandap And Furniture For Various Functions In Ward No 21 Pimpri For The Year 2025 26-Hire charges for Truck 5.5 cum per 10 tonnes including operator, disel, oil and other necessary labour etc. maintainance, Hire charges for cranes (5 tonne capacity) including operator, disel, oil and other necessary maintainance, labour etc. complete (PWD/DSR/06-07/stat-A3/-) Hire charges for Hydraulic Excavator (BEML BE 200, Tata Hitachi EX200) Hire charges for crane (20 tonne) including operator, disel , oil and other necessary maintainance, labour etc. complete. Hire Charges for JCB including ope... Read More
Tender Value
7,86,144
Submission Date
13-11-2025
Participated Bidder List
4 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 5,89,608 L2
2 cnet-technologies Bid Analytics 7,07,529.6 L4
3 cnet-technologies Bid Analytics 5,47,392.07 L1
4 cnet-technologies Bid Analytics 6,99,746.77 L3
Work Detail
providing mandap and furniture for various functions in ward no 21 pimpri for the year 2025 26-hire charges for truck 5.5 cum per 10 tonnes including operator, disel, oil and other necessary labour etc. maintainance, hire charges for cranes (5 tonne capacity) including operator, disel, oil and other necessary maintainance, labour etc. complete (pwd/dsr/06-07/stat-a3/-) hire charges for hydraulic excavator (beml be 200, tata hitachi ex200) hire charges for crane (20 tonne) including operator, disel , oil and other necessary maintainance, labour etc. complete. hire charges for jcb including operator, disel, oil and other necessary mainatainance, labour etc. complete. hire charges for truck 5.5 cum per 10 tonnes including operator, disel, oil and other necessary labour etc. maintainance, hire charges for cranes (5 tonne capacity) including operator, disel, oil and other necessary maintainance, labour etc. complete (pwd/dsr/06-07/stat-a3/-) hire charges for hydraulic excavator (beml be 200, tata hitachi ex200) hire charges for crane (20 tonne) including operator, disel , oil and other necessary maintainance, labour etc. complete. hire charges for jcb including operator, disel, oil and other necessary mainatainance, labour etc. complete. labour etc.(r ate/sq.ft.) h) for eight day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) i) for nine day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) j) for ten day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) a) for one day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) b) for two day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) c) for three day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) d) for four day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) e) for five day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) f) for six day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) e) for seven day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) h) for eight day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) i) for nine day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) j) for ten day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc. complete ht 34ft. rate/sq.ft) a) for one day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. rate/sq.ft) b) for two day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material page no - 4 and transportation and labour etc.complete ht 34ft. rate/sq.ft) c) for three day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. rate/sq.ft) d) for four day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. rate/sq.ft) e) for five day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. rate/sq.ft) f) for six day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. rate/sq.ft) g) for seven day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. rate/sq.ft) h) for eight day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc. complete ht 34ft. rate/sq.ft) i) for nine day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. (rate/sq.ft) j) for ten day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. a) for one day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. b)for two day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. c) for three day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. d) for four day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. e) for five day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. f) for six day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. g) for seven day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. h) for eight day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. i) for nine day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. j) for ten day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) a) for one day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) b)for two day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) c) for three day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) d) for four day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) e) for five day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) f) for six day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota e tc complete (rate/rft) g) for seven day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) h) for eight day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) i) for nine day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) j) for ten day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) a) for one day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) b)for two day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) c) for three day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) d) for four day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) e) for five day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) f) for six day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) e)for seven day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) h) for eight day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) i) for nine day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rat e/no) j) for ten day hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . complete (rate/no) a) for one day hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . complete (rate/no) b)for two day hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . complete (rate/no) c) for three day hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . complete (rate/no) d) for four day hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . complete (rate/no) e) for five day hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc .
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 77cec52d-3a67-4410-9429-8c60ca380231 financialevaluation notice
Download boqcomparativechart boq document
Download finsummary_2138487 aoc document
Download File Name File Description
Download 242281e0-8b0f-4a13-93ca-a854256af954 Tender Documents
Download BOQ_2138487 Tender Documents
Download SB2 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders