BRR : 10792830
Click Here To View Tendering Authority. Price Bid City/State :  pimpri, Maharashtra
Tender Brief : Providing Mandap Arrangement For Ganeshotsay Dargashtami Chatpuja And Other Various Programme At Chikhali In Ward No 2= Supplying mazdoor/unskilled heavy male labour etc. Hire charges for Excavator JCB JS140/Tata Hitachi EX120 or equivalent)) 0.6Cum Capacity including operator, disel , oil and other necessary maintainance , labour etc. complete. Hire Charges for tractor with trolly including operator, disel, oil and other necessary maintainance, labour etc Dumpper 6 Cu.Mt Capacity with VTS (Vechile Tracking system) Hire charges for crane (10 tonne capacity ) including operator,disel , oil and... Read More
Tender Value
22,95,067
Submission Date
24-10-2025
Participated Bidder List
4 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 23,63,919.01 L4
2 cnet-technologies Bid Analytics 22,72,116.33 L2
3 cnet-technologies Bid Analytics 23,18,017.67 L3
4 cnet-technologies Bid Analytics 18,67,496.02 L1
Work Detail
providing mandap arrangement for ganeshotsay dargashtami chatpuja and other various programme at chikhali in ward no 2= supplying mazdoor/unskilled heavy male labour etc. hire charges for excavator jcb js140/tata hitachi ex120 or equivalent)) 0.6cum capacity including operator, disel , oil and other necessary maintainance , labour etc. complete. hire charges for tractor with trolly including operator, disel, oil and other necessary maintainance, labour etc dumpper 6 cu.mt capacity with vts (vechile tracking system) hire charges for crane (10 tonne capacity ) including operator,disel , oil and other necessary maintainance , labour etc. complete. hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) a) for one day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) b) for two day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) c) for three day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) d) for four day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) e) for five day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) f) for six day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) g) for seven day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) h) for hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) i) for nine day hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(r ate/sq.ft.) j) for ten day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) a) for one day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) b) for two day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) c) for three day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) d) for four day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) e) for five day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) f) for six day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) h) for eight day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) i) for nine day hire charges for providing and erecting tempory mandap with c.g.i. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) j) for ten day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc. complete ht 34ft. (rate/sq.ft) a) for one day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. (rate/sq.ft) b) for two day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. (rate/sq.ft) c) for three day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. (rate/sq.ft) d) for four day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. (rate/sq.ft) e) for five day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. (rate/sq.ft) f) for six day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. (rate/sq.ft) g) for seven day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. (rate/sq.ft) h) for eight day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc. complete ht 34ft. (rate/sq.ft) i) for nine day hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete ht 34ft. (rate/sq.ft) j) for ten day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. a) for one day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. b)for two day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. c) for three day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. d) for four day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. e) for five day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. f) for six day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. g) for seven day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. h) for eight day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. i) for nine day hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (ht 34 ft.) rate/sq.ft. j) for ten day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) a) for one day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) b)for two day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) c) for three day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) d) for four day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) e) for five day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) f) for six day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota e tc complete (rate/rft) g) for seven day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) h) for eight day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) i) for nine day hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) j) for ten day hire charges for providing and erecting cotton gate (sadi kaman) including all marerial transportation and labour etc.complete (rate/no) a) for one day etc
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 1bf1cab7-fffc-49cf-a8b1-81c668fb3d7e financialevaluation notice
Download boqcomparativechart boq document
Download finsummary_2121135 aoc document
Download File Name File Description
Download BOQ_2121135 Tender Documents
Download SelfDeclarationforselfatt_1 Tender Documents
Download Tendernotice_1 Tender Documents
Download 0e355abb-e4b3-4237-8c36-07c2169faf4a Tender Documents
Download 26 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid