BRR : 10480090
Tender Brief : Work For Breakdown Under Edd-I Baruat-1 On Site Lt / Ht Replacement Of Broken Damaged Pcc / Stp New. Loading / Reaching The Site From The Storage Center / Baghpat / Meerut For Erecting The Pole, Erecting The Pole By Digging A Pit, Sagging The Wires By Putting Clamps, Cross Arm, Insulator Etc. On The Pole. ( Including Pole Grouting ) New Pole ( Pcc / Stp ) To Be Installed In Mid Span To Raise Hanging Wires / Ab Cable At The Site Loading / Transporting The Pole From Storage Center / Bagpat / Meerut To The Site Erecting The Pole By Digging A Pit, Clamp On The Pole, Cross... Read More
Tender Value
₹
Ref. Document
Submission Date
04-11-2022
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 1,81,250 | L3 | |||
| 2 | cnet-technologies | Bid Analytics | 1,58,550 | L1 | |||
| 3 | cnet-technologies | Bid Analytics | 1,66,850 | L2 |
Work Detail
work for breakdown under edd-i baruat-1 on site lt / ht replacement of broken damaged pcc / stp new. loading / reaching the site from the storage center / baghpat / meerut for erecting the pole, erecting the pole by digging a pit, sagging the wires by putting clamps, cross arm, insulator etc. on the pole. ( including pole grouting ) new pole ( pcc / stp ) to be installed in mid span to raise hanging wires / ab cable at the site loading / transporting the pole from storage center / bagpat / meerut to the site erecting the pole by digging a pit, clamp on the pole, cross to start the power supply by sagging the wires by using arm insulators etc. ( including pole grouting ) 3 4 5 pole repair work by welding additional channel / angle / iron strip to the st pole ( 09 m / 11 m / 13 m ) which is damaged due to corrosion etc. near the ground at site ( necessary channel / angle / strip payable by the tenderer ) tightening per span by pulling loose wire / ab cable / new wire ( lt line / ht line ) and maintaining safe ground clearance. the work of straightening the pole by filling the ballast / boulder / packing in the root and tightening the stay wire to straighten the pole diagonally. 2 on lt / 11kv / 33kv line, the work of starting power supply from the clear line by cutting / pruning of covered tree branches. removal of damaged cable box of 33kv / 11kv cable by disconnecting it from the pole, peeling the cable and removing carbon and filling new cable box. and starting the power supply ( payable by the cable box department ) for special purpose / as per requirement. plastic paper wrapping to a height of 8 feet from the ground to insulate the poles from possible current ( necessary plastic paper / tape etc. payable by the tenderer ) . chemical earthing work as required. ( material payable by the tenderer ) guarding of ht lines as per requirement to prevent electrical accident. ( payable by material department ) fencing of 250 and 400 kva open transformers with boss as required. ( about 08 feet high ) for the construction of double pole, transporting 02 nos pole, stay wire and other fitting material from storage center / baghpat / meerut to the site ( including loading unloading ) digging the pit, erecting the pole and installing the fittings to prepare the double pole ( decentralized material payable by the tenderer ) ( pole grouting
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results